Project Management
- "Conversion failed" error when opening Project treeview
- "Error loading preferred resource data" from Preferences or Task Assignment
- "Include in Resource Demand" check box is removed upon locking tasks
- "Task history will be deleted" message after editing Billable flag
- "Worksheet data is being refreshed with changes made by other users" (CP 2012)
- 'Baseline' Reset Button not being displayed
- Actual values for Fiscal Year breakdown do not match project actuals
- After copying a project, why do task assignments start later than the task?
- After saving a project, "Saving Canceled" message appears and Project Worksheet becomes unresponsive
- After time entry, when are the actual hours updated for tasks and task assignments ?
- Available loading method options are limited
- A product that is in the budget does not appear in the "Create Material" dialog box on the project
- Cannot assign resources to task
- Cannot associate Competitor to Project in PSA/PPM environments
- Cannot change billing role effective/expiry date
- Cannot deselect certain workcodes in a project
- Cannot edit assignment percent complete field for some task assignments
- Cannot modify the project plan editors
- Cannot reduce resource request duration(CP2014)
- Cannot take ownership of a project
- Cannot transfer project to me
- Cannot transfer / reassign a project
- Can I get a list of Ids and types for CPProjectType from the project table?
- Can the "{" key be used at the beginning of a project name?
- Changing a predessor task end date does not move the successor task(CP2014)
- Changing Billable Task to Unbillable does not Update all Time Records
- Copy project - project manager list is not ordered alphabetically
- Copy Project Error: The field [yxy ID:XXXX] already exists in the database
- Does copy project include the open task restrictions?
- Draft tasks are moving after the project is saved
- Error: [Argument_AddingDuplicate] when opening the project worksheet
- Error: There are no working days between the Planned Start and Finish dates when adding a task assignment
- Error "Length: cannot be less than zero" when creating/editing Project Phases
- Error -1072896682 when trying to copy a project (CP 2014)
- Error when linking two predecessor tasks to one successor task
- Error when opening the project worksheet: GetEntities Arithmetic Overflow (CP2014)
- Excel Export Button not functional in Project Worksheet
- How are project team entries used when calculating the allocation for task assignments?
- How are the PlannedDay and PlannedFTE fields in the taskassignment table calculated?
- How are the remaining hours calculated?
- How can we get the date that the project was marked as completed through project status drop down box?
- How can we track changes to tasks and assignments?
- How can we track updates in Project fields?
- How can you prevent users from doing task status at all ?
- How can you update the actual start date on a milestone task, without assigning a resource and having time entered to it?
- How does RollupActualFinish get recorded in Task? (CP2012)
- How does system set the start date on tasks when copying a project?
- How is slack calculated in Changepoint?
- How is the Project Actual Finish Date set?
- How planned hours are calculated for an open task assignment?
- How to allow assigning any resource to a task when resource requests are enabled at Billing Office Level
- How to assign a resource to the same task for different periods before and after a vacation period?
- How to change the default loading method
- How to change the project manager of a project
- How to check in the database who is project plan editor for a billing office? (CP2014)
- How to configure time entry restrictions?
- How to copy a parent task and its subtasks to another project ?
- How to create a request for a completed project?
- How to enable the "Open task" option in the edit task dialog
- How to enable the "soft booked" checkbox in edit project / project team?
- How to find the internal project ID in the user interface?
- How to make the billing role mandatory in task assignments when the task is billable?
- How to restrict Open Task access to project team resources only?
- How To Rollup All Projects
- How to set the Fiscal period field as mandatory for projects?
- How to set the value of custom fields in resource requests added in Project Team
- How to trace when a project was transferred from one project manager to another?
- How to transfer a project budget to someone else with access restrictions?
- How to update the Client/Customer and Initiative/Engagement of a project?
- HTTP 403 error Project Planning Worksheet fails to save Preferred resources cannot be edited
- In "Transfer records" one inactive project does not appear in the list of projects but other inactive projects do
- Issue with preferred resource list.
- Is it possible to change the loading method of a task assignment by using a stored procedure or the API?
- Is it possible to create task dependencies (link tasks) between different projects?
- Is it possible to define access control restrictions on shared project worksheet views?
- Is it possible to define a default value for the project type (status required / not required)?
- Is it possible to export/import a project between two Changepoint environments?
- Is it possible to modify the planned start/finish date of a task assignment in past fiscal periods if there's no time against it?
- Is it possible to reassign task assignments in batches?
- Is it possible to update the status a task that is set to "Status not required" ? (CP 2014, CP 2017)
- Is it possible to use 'Copy Project' with sub projects?
- Is there any condition that prevents users from changing the loading method?
- Is there any way we can associate a project team with other projects?
- Is there a date limitation for projects for planned finish date?
- Is the initial baseline overwritten?
- Late tasks report in 'My Reminders' portlet shows task with future planned finish date
- Manually allocated tasks have been evenly redistributed(CP2014)
- Milestone task Actual Date start /finish behavior
- Mismatch between time entries and project actual start/finish/effort (CP2014)
- Name of a project created from a request cannot contain certain characters, but the characters were allowed on the request
- Page TitleWhat is the Billing Role Expiry Date?
- Planned hours change when switching a project's fiscal period
- Planned remaining hours are not updated after saving changes in Project Worksheet
- Planner / PPW
- "Cannot connect to the notification server " error when opening the PPW
- "Cannot connect to the notification server " error when opening the PPW in a new window
- "Cannot connect to the notification server " error when opening the PPW or RSW
- "Conversion from type 'DBNull'..." Error when opening Project Worksheet
- "Error invoking Hub Method" when starting PPW
- "Resource" label in task assignment view in Project Worksheet (PPW) is in English only
- "The field [Duration] cannot exceed 9125" error in project planning worksheet (PPW)
- After copying a task assignment in PPW, the new created task assignment is not visible in Resource Search
- Argument_AddingDuplicate error in project worksheet
- Cannot select a resource for a resource request or for a task assignment in the project worksheet
- Can a project linked to MSP be edited in Project Planning Worksheet/Project Worksheet?
- Can the default start date in the Project Worksheet Gantt chart be configured?
- Can the resource cost rate field be edited in the project worksheet?
- Caveats when switching from using PPW or RSW to project worksheet or RMW
- Field 'Loading method' not available when creating a view in the PPW(CP2017)
- How to allocate recurring planned hours in Project Planning Worksheet? (CP2017 SP2)
- How to display the project total planned hours and actual hours in PPW?
- In project worksheet, cannot select "Billed to fixed fee" for a task
- In Project Worksheet filters, can one of the existing conditions work like an SQL "not like"?
- Manual allocations are not displayed correctly in PPW
- Not able to assign a resource to a task in project worksheet
- Opening the project planning worksheet fails(CP2014 SP2)
- Overbooking error in project worksheet (CP 2014)
- Planned effort cannot be changed in project planning worksheet (PPW) due to warning about loading methods (CP 2017 SP1)
- Project Planning Worksheet (PPW): Best practices
- Project Planning Worksheet restrictions when using filtering and sorting
- Project Worksheet (PPW) does not open in a third-party portal or standalone window when using ui=p
- Project worksheet errors related to hidden columns(CP2014)
- ResponseContentTypeMismatch error in Project Worksheet
- Some projects do not open in the project planning worksheet(CP2017)
- Tasks appear in project worksheet but not PPW, even after running WBS utility
- UI Layout initialization warning when opening PPW
- Warning message when resources are overbooked does not appear in the project planning worksheet (PPW) and project worksheet
- Week start and Non working days in Gantt chart in project planning worksheet(PPWS)
- When a task shows a billing role in PPW, do all task assignments for the task have the same billing role?
- When should the "Replace past planned effort with actual effort" menu option be used in PPW?
- Where does it show when the project worksheet was last used for a project?(CP2014)
- Why are some icons disabled if sorting is used on Filters and Views in Project Worksheet (CP2020)?
- Why does the project planning worksheet show two lines of column headers?
- Why is it not possible to change the start date of some tasks in Project Planning Worksheet?
- Why is the billing role not included for task assignments for the newly created tasks activated from PPW
- Projects not accessible by project plan editors / co-managers
- Project data is not rolled up
- Project data is not rolled up from assignments to tasks(CP2014)
- Project manager not able to assign a resource who is exempt from resource requests to a project task
- Project planner, scenario comparison worksheet, and resource management worksheet (RMW): Best practices
- Project planning worksheet (PPW) keyboard shortcuts
- Project Task Statusing and Project Percent Complete
- Project tree view search does not work when searching for a portion of the project name
- Project worksheet - Billing Rate Column not showing
- Project worksheet says "dates cannot be changed in past periods" when only changing planned hours/days (CP2012)
- Removing the fiscal period from a project changes the method of planned hours allocation to automatic
- Replace planned with actual and forecast
- Resource Group Assignment on Projects
- Rollup project job fails with arithmetic overflow error(CP2014)
- Searching for projects using both project and alternate name does not work
- Server error occurs when editing projects or tasks
- Spaces in Project/Task name
- Summary section on project profiles – Calculations for billed and available amounts (Changepoint 2021)
- Task Assignments are populated in the Project Budget, even when the Cancel button is selected
- Task baselinehours data is overwritten
- Task comments lose Edit mode formatting like carriage return in Task profile page
- Task dependency overrides resource allocation (CP2010 SP2)
- Task does not appear in a resource calendar between the planned start and planned finish dates
- Task planned effort is not distributed till planned finish date
- Task planned hours is set to 0
- Task status was set to 0% for all tasks
- The "Transfer project to me" option is not available on the project - Actions menu
- Time approvers cannot be unassigned even if all projects are closed
- Unable to assign a resource to a task, even though the Preferred Resource list is populated.
- Unable to copy the projected resources to a project team (2012)
- Unable to delete a project with 0 actual hours
- Unable to delete a task with 0 actual hours
- User is not able to view a project
- Viewing comments of other users for Task status updates comments
- Warning "Some effort is distributed to nonworking days and will be removed"
- Warning about open tasks when copying a project
- Warning in project worksheet: Some effort is distributed to nonworking days
- What are the criteria for a task assignment to be due for statusing in task status compliance report?
- What determines the user id recorded in the UpdatedBy column in the project table
- What determines when a reminder shows up in 'My Reminders' portlet that the task needs statusing?
- What entities are concerned by the feature to edit information in past fiscal periods (MPP)?
- What happens if you change the daily conversion factor for a resource?
- What is a purpose of 'projectavailableto' table?
- What is the best setting to use to prevent projects being created under an engagement?
- What is the difference between Planned Remaining Hours and Remaining Hours?
- What is the maximum effort that can be planned on an assignment? (CP2014 SP2)
- What is the purpose of the "Resource Request Number" field in a task assignment view?
- When a user attempts to export to Excel from the project worksheet, the system terminates the user's Changepoint session.
- When copying a project, options to copy resource assignments and billing roles are disabled.
- When copying a project, some resources are not copied
- When copying projects is there a way to zero out the planned hours for each resource?
- When editing a task there is a field to select a request but the request does not appear in the drop down list
- When is a project rolled up automatically?
- When linking project to MSP, some fields in Project Worksheet are not accessible. Is the resource management worksheet available? (2012)
- When looking at a task, some resources can only see their own task assignment wheras other resources can also see all the other resources that are assigned to the same task
- Where can the manager comments be added to a task assignment?
- Where to find who statused the task and when ?
- Which job takes care of the 'replace past with actuals' functionality for projects? (CP 2014)
- Which table contains project worksheet views information?
- Who is the default Project Manager when creating a project from a request?
- Why are FTE amounts auto-distributed differently when task assignments have the same resource, duration and dates?
- Why are the time approver fields not available in the Edit Project dialog, even though they are enabled in Metadata?
- Why a task assignment does not appear in resource's calendar?
- Why does the billing role change in Project Worksheet when the assignee is changed?
- Why does the end date calculation in Project Worksheet overbooks the resource?
- Why is "Billed to fixed-fee portion of the engagement." option not editable on a task?
- Why is there a billing rate on the time record when there seems to be no billing role on the assignment?
- Why the drop down list is missing when trying to create a task assignment in the Project Worksheet?
- Will adding a Default Project Plan Editor to a Billing Office / Cost Structure rollback to all projects?
- Work Location not editable in the time sheet when copy project is used