Skip to main content
Planview Customer Success Center

Minimum Time Increments v2014

Is there a way within Changepoint to set a minimum time increment that can be used for entry? For instance, right now, a user can enter .25 (15 minutes) and the requirement is at least .5 (30 minute) entry from now on.


You can use the ‘minimum’ value in metadata for that purpose (assuming it’s for the entire organization). We also have a maximum setting on each workgroup, but not a minimum. If metadata is used, ensure that it’s set for all relevant fields (regular hours, overtime hours, regular days, overtime days).