Hub Release Notes - 23.4.0.20230925-b5789
Posted: September 26, 2023
Fixes
Planview Hub Fixes
Artifact Filtering
- 135173: Improved the performance of worklog filtering in time tracking integrations
Time Tracking
- 135463: Improved performance of time tracking integrations for work items with a large number of worklogs.
Connector-Specific Fixes
IBM Engineering Requirements Management DOORS Next
- 135211: Added performance improvements for listing projects in IBM DOORS Next when global configuration is enabled.
SDK-Specific Fixes
SDK
- 135515: Fixed an issue where detecting changes to an artifact sometimes took a long time if the artifact had thousands of time tracking entries.
Features
Connector-Specific Features
Atlassian Jira
- 125091: Added support for Test Runs and Test Executions in the Jira Cloud Xray plugin
Planview AgilePlace
- 135135: Added support for synchronizing AgilePlace cards between boards given that the two boards have the same lane structure and name.
- 135102: Added support for the Score and Double Type fields.
- Note that external connectors must enter a score value within the range of 1 to 99, otherwise, the field will not synchronize with AgilePlace.