Standard Reports List
Reports List
Note:
Since both the folders and the reports themselves are customizable you may see different folders and / or different report locations then those listed here.
Table of Contents
Budget
Description | Show all milestones managed by me where Actual cost is bigger than the Budgeted Cost | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Milestone | Object | FieldComparison | Equals | ConstraintFixedValue | ||||
#2 | Milestone | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | Milestone | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Milestone | TrackStatus | Pick List | ||||||
Conflicts | Milestone | Conflicts | Long | ||||||
State | Milestone | State | Pick List | ||||||
Importance | Milestone | Importance | Pick List | ||||||
Belong to Critical Path | Milestone | OnCriticalPath | Boolean | ||||||
ID | Milestone | SYSID | String | ||||||
Name | Milestone | Name | String | ||||||
Project | Milestone | Project | Reference To Object | ||||||
Duration | Milestone | Duration | TimeEffort | ||||||
Start Date | Milestone | StartDate | DateTime | ||||||
Due Date | Milestone | DueDate | DateTime | ||||||
% Complete | Milestone | PercentCompleted | Double | ||||||
Actual Cost | Milestone | ActualCost | Money | ||||||
Budgeted Cost | Milestone | PlannedBudget | Money | ||||||
Actual Effort | Milestone | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Milestone | RemainingEffort | TimeEffort2 | ||||||
Manager | Milestone | Manager | Reference To Object | ||||||
% Completeness Uncertain | Milestone | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Milestone | CompletnessDefinition | Long |
Description | Show all milestones where ‘Actual Cost’ is bigger than the Budgeted Cost’ in a specific project (you will be requested to set the project after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Milestone | ActualCost | Money | FieldComparison | MoreThan | ConstraintFieldValue | |||
#2 | Milestone | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#3 | Milestone | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Milestone | TrackStatus | Pick List | ||||||
Conflicts | Milestone | Conflicts | Long | ||||||
State | Milestone | State | Pick List | ||||||
Importance | Milestone | Importance | Pick List | ||||||
Belong to Critical Path | Milestone | OnCriticalPath | Boolean | ||||||
ID | Milestone | SYSID | String | ||||||
Name | Milestone | Name | String | ||||||
Duration | Milestone | Duration | TimeEffort | ||||||
Start Date | Milestone | StartDate | DateTime | ||||||
Due Date | Milestone | DueDate | DateTime | ||||||
% Complete | Milestone | PercentCompleted | Double | ||||||
Actual Cost | Milestone | ActualCost | Money | ||||||
Budgeted Cost | Milestone | PlannedBudget | Money | ||||||
Actual Effort | Milestone | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Milestone | RemainingEffort | TimeEffort2 | ||||||
Manager | Milestone | Manager | Reference To Object | ||||||
% Completeness Uncertain | Milestone | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Milestone | CompletnessDefinition | Long |
All Projects Exceeding Budget
Description | Show all projects where Actual cost is bigger than the Budgeted Cost | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | Object | FieldComparison | Equals | ConstraintFixedValue | ||||
#2 | Project | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Project | TrackStatus | Pick List | ||||||
Conflicts | Project | Conflicts | Long | ||||||
State | Project | State | Pick List | ||||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Duration | Project | Duration | TimeEffort | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime | ||||||
% Complete | Project | PercentCompleted | Double | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Effort | Project | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Project | RemainingEffort | TimeEffort2 | ||||||
Manager | Project | Manager | Reference To Object | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long |
All Tasks Exceeding Budget Managed by Me
Description | Show all tasks managed by me where Actual cost is bigger than the Budgeted Cost | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | Object | FieldComparison | Equals | ConstraintFixedValue | ||||
#2 | GenericTask | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all projects where budget is utilized faster than progress i.e. where % of actual cost out of budgeted cost is greater than % complete | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | Object | FieldComparison | Equals | ConstraintFixedValue | ||||
#2 | Project | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Project | TrackStatus | Pick List | ||||||
Conflicts | Project | Conflicts | Long | ||||||
State | Project | State | Pick List | ||||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Duration | Project | Duration | TimeEffort | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime | ||||||
% Complete | Project | PercentCompleted | Double | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Effort | Project | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Project | RemainingEffort | TimeEffort2 | ||||||
Manager | Project | Manager | Reference To Object | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long |
Description | Show all work items managed by me where budget is utilized faster than progress i.e. where % of actual cost out of budgeted cost is greater than % complete | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Work Item | Object | FieldComparison | Equals | ConstraintFixedValue | ||||
#2 | Work Item | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | Work Item | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Work Item | TrackStatus | Pick List | ||||||
Conflicts | Work Item | Conflicts | Long | ||||||
State | Work Item | State | Pick List | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Duration | Work Item | Duration | TimeEffort | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Actual Cost | Work Item | ActualCost | Money | ||||||
Budgeted Cost | Work Item | PlannedBudget | Money | ||||||
Actual Effort | Work Item | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Work Item | RemainingEffort | TimeEffort2 | ||||||
Manager | Work Item | Manager | Reference To Object | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long |
Description | Show Cost & Revenue forecast by all Customers in specific timeframe. The calculation of the "Forecast Cost" takes the “Planned Expenses” plus the maximum between "Budgeted Cost" and "EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). The calculation of the "Forecast Revenue" takes the “Planned Billed Expenses” plus the maximum between "Expected Revenue" and "Revenue EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Customer | Customer | Name | String | ||||||
Customer ID | Customer | SYSID | String | ||||||
Internal Customer ID | Customer | InternalId | String | ||||||
Project | Project | Name | String | ||||||
Project ID | Project | SYSID | String | ||||||
Internal ID | Project | InternalId | String | ||||||
Customer Allocation (%) | CustomerLink | CostAllocation | Double | ||||||
Currency Type | Project | CostCurrencyType | Pick List | ||||||
אוקטובר,2012 | Project | Object | |||||||
נובמבר,2012 | Project | Object | |||||||
דצמבר,2012 | Project | Object |
Description | Show Cost & Revenue forecast by all Projects in specific timeframe. The calculation of the "Forecast Cost" takes the “Planned Expenses” plus the maximum between "Budgeted Cost" and "EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). The calculation of the "Forecast Revenue" takes the “Planned Billed Expenses” plus the maximum between "Expected Revenue" and "Revenue EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Project | Project | Name | String | ||||||
Project ID | Project | SYSID | String | ||||||
Internal ID | Project | InternalId | String | ||||||
Currency Type | Project | CostCurrencyType | Pick List | ||||||
אוקטובר,2012 | Project | Object | |||||||
נובמבר,2012 | Project | Object | |||||||
דצמבר,2012 | Project | Object |
Description | Show Cost & Revenue forecast by Customer in specific timeframe. The calculation of the "Forecast Cost" takes the “Planned Expenses” plus the maximum between "Budgeted Cost" and "EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). The calculation of the "Forecast Revenue" takes the “Planned Billed Expenses” plus the maximum between "Expected Revenue" and "Revenue EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show Cost & Revenue forecast by Project in specific timeframe. The calculation of the "Forecast Cost" takes the “Planned Expenses” plus the maximum between "Budgeted Cost" and "EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). The calculation of the "Forecast Revenue" takes the “Planned Billed Expenses” plus the maximum between "Expected Revenue" and "Revenue EAC", and multiplies by the "Cost Allocation (%)" (defined in the customer level on a project). | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report displays only the billing information for a specific customer based on the hours reported by the users and related expenses. Report provides users' rates used to calculate totals. Note: only approved hours are included. To see also unsubmitted hours use the Customer Summary report. | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show customer expense summary from all projects within a given date range | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show all expenses of specific project | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | This report gives you a summary of all Approved Expenses for a Project in a Specific Timeframe – useful for monthly payroll re-imbursements and customer billing operations. When generating the report either manually or via customizations you can select the projects and the timeframe. Each project is displayed on a separate worksheet. Totals for Billing and Re-imbursement are calculated per project. The report links each expense to its related Work Item, Owner and Expense Sheet, and lists the Expense Description and Category, the Date Incurred and the Date Invoiced, the Local Amount and Exchange Rate Amount, the Billing Amount and whether it should be Reimbursed and whether it has an attached Receipt. Advanced:
|
|||||||
Attributes |
|
|||||||
Available to |
|
Description | Show projects in a specific state with the "unfavorable" cost variance condition ("Negative" Cost Variance). | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | Shows list of projects by selected state (Active, Draft, on-hold, etc.) where the project cost variance has a negative value. The Cost Variance measures the difference between the earned value (The Earned Value [EV] is used to measure the progress of projects by calculating how much of the budget has been used) and the actual cost. The results are shown on the results tab with a set of selected relevant project financial measures, like: budgeted cost, actual cost, %invested, Cost Variance, Earned value, CPI, project manager, project start and due date. |
||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | CostVariance | Money | FieldComparison | Before | ConstraintFixedValue | |||
#2 | Project | State | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
% Invested | Project | PercentInvested | Double | ||||||
Cost Variance | Project | CostVariance | Money | ||||||
Earned Value | Project | EarnedValue | Money | ||||||
CPI | Project | CPI | Double | ||||||
Project Manager | Project | ProjectManager | Reference To Object | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime |
Description | Show projects in a specific state with the cost of completing the work higher than planned (Cost Performance Index less than 1.0). | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | This report takes one parameter which allows the choice of one lifecycle state (Active, Cancelled, Completed, Draft, On Hold). All projects in the chosen state and a Cost Performance Index (CPI) less than 1.0 will be returned in the Clarizen report. The CPI formula is calculated as the Expected Value / Actual Revenue; those projects with a low CPI have an unfavorable cost efficiency. This report is useful for identifying projects which are over budget. | ||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | CPI | Double | FieldComparison | Before | ConstraintFixedValue | |||
#2 | Project | State | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
% Invested | Project | PercentInvested | Double | ||||||
Cost Variance | Project | CostVariance | Money | ||||||
Earned Value | Project | EarnedValue | Money | ||||||
CPI | Project | CPI | Double | ||||||
Project Manager | Project | ProjectManager | Reference To Object | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime |
Description | For a specific customer, this report displays all hours reported within a given timeframe on billable work items, and calculates the amount due according to the rates set for each resource or work item specifically. The report will include hours which have been approved during the specific timeframe. Work items with a fixed price which have been marked as completed during the selected timeframe will also be included. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Customer ID | Work Item | SYSID | String | ||||||
Customer | Work Item | Name | String | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item Name | Work Item | Name | String | ||||||
Total Hours | Work Item | Object | |||||||
Total for Billing | Timesheet | Object |
Description | For a specific project, this report displays all hours reported within a given timeframe on billable work items, and calculates the amount due according to the rates set for each resource or work item specifically. The report will include only hours which have been approved. Work items with a fixed price which have been marked as completed during the selected timeframe will also be included. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item Name | Work Item | Name | String | ||||||
Total Hours | Work Item | Object | |||||||
Total for Billing | Timesheet | Object |
Description | Show user expense summary from all projects within a given date range | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | This is an ideal report to aggregate all expenses for a specific user and is often used for reimbursements. When running this report you will be prompted to select one specific user and a date range. The report will show all expenses for that user across all projects. The columns produced by the report include the expense description, whether the expense is billable to a customer, the work item and project IDs, the work item state, the expense category, date incurred, date invoiced, amount of the expense, whether the expense is reimbursable, whether there is a receipt, and the ID of the corresponding worksheet. | ||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Expense Sheet | State | Pick List | ||||||
Billable | Expense Entry | Billable | Boolean | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item | Work Item | Name | String | ||||||
Expense Category | Expense Entry | Category | Pick List | ||||||
Date Incurred | Expense Entry | DateIncurred | Date | ||||||
Date Invoiced | Expense Entry | DateInvoiced | Date | ||||||
Local Amount | Expense Entry | LocalAmount | Money | ||||||
Exchange Rate | Expense Entry | ExchangeRate | Double | ||||||
Amount | Expense Entry | Object | |||||||
Billing Amount | Expense Entry | BillingAmount | Money | ||||||
Reimburse | Expense Entry | Reimburse | Boolean | ||||||
Receipt | Expense Entry | Receipt | Boolean | ||||||
Description | Expense Entry | Description | String | ||||||
Expense Sheet ID | Expense Sheet | SYSID | String |
Customer
Description | Show all projects in Active or Draft states managed for a specific customer (you will be requested to set the customer after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | Retrieves all of the projects linked to the selected customer, that are of draft or active state, the projects' data includes financial data (that appears empty for non-financial users) | ||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Customer | Text | FieldComparison | Equals | ConstraintRuntimeValue | ||||
#2 | Project | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Project | TrackStatus | Pick List | ||||||
Conflicts | Project | Conflicts | Long | ||||||
State | Project | State | Pick List | ||||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Duration | Project | Duration | TimeEffort | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime | ||||||
% Complete | Project | PercentCompleted | Double | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Manager | Project | Manager | Reference To Object | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long |
Issues
Description | Show all types of the issues assigned to specific person (you will be requested to set a person after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | AssignedTo | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
All Issue Types Identifier | Case | Text | |||||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object | ||||||
Title | Case | Title | String |
Description | Search for all issues that are assigned to certain resources by their related group, job title or a skill | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Case | State | Pick List | ||||||
Importance | Case | Severity | Pick List | ||||||
Entity Type | Object | ||||||||
Case ID | Case | SYSID | String | ||||||
Title | Case | Title | String | ||||||
Due date | Case | DueDate | DateTime | ||||||
Assigned to | User | Object | |||||||
Owner | User | Object | |||||||
Resolved In Project | Project | Name | String |
Description | Show all types of the issues in specific state (you will be requested to set a state after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | State | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
All Issue Types Identifier | Case | Text | |||||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object | ||||||
Title | Case | Title | String |
Description | Show all issues that are to be resolved in a specific project | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Case | PlannedFor | Reference To Object | FieldComparison | In | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Title | Case | Title | String | ||||||
Importance | Case | Severity | Pick List | ||||||
Priority | Case | Priority | Integer | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object |
Description | Show all opened issues committed to customers | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Title | Case | Title | String | ||||||
Importance | Case | Severity | Pick List | ||||||
Priority | Case | Priority | Integer | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Customer Name | Customer | Name | String | ||||||
Committed date | CaseCustomerLink | CommittedDate | Date |
Description | Show all opened issues submitted by or committed to customer | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Customer | Text | FieldComparison | Equals | ConstraintRuntimeValue | ||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Title | Case | Title | String | ||||||
Importance | Case | Severity | Pick List | ||||||
Priority | Case | Priority | Integer | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Customer Name | Customer | Name | String | ||||||
Submitted | CaseCustomerLink | Submitted | Boolean | ||||||
Resolution committed | CaseCustomerLink | Committed | Boolean | ||||||
Committed date | CaseCustomerLink | CommittedDate | Date |
Description | Show all issues that have related work within a project | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Work Item | Project | Reference To Object | FieldComparison | In | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Title | Case | Title | String | ||||||
Importance | Case | Severity | Pick List | ||||||
Priority | Case | Priority | Integer | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Project | Work Item | Project | Reference To Object | ||||||
Name | Work Item | Name | String |
Description | Show all issues assigned to specific person (you will be requested to set a specific issue type and a person after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Case | AssignedTo | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
All Issue Types Identifier | Case | Text | |||||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object | ||||||
Title | Case | Title | String |
Description | Show all issues in specific state (you will be requested to set a specific issue type and a state after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Case | State | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
All Issue Types Identifier | Case | Text | |||||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object | ||||||
Title | Case | Title | String |
Description | Number of a Specific Issue Yype (ie. Bugs, Risks) by State | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | In | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Case | State | Pick List | ||||||
COUNT | Case | Object |
Description | Number of issues per state for a specific customer | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Customer | Text | FieldComparison | In | ConstraintRuntimeValue | ||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Case | State | Pick List | ||||||
COUNT | Case | Object |
Description | Number of all types of issues per state | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Case | State | Pick List | ||||||
COUNT | Case | Object |
Description | Number of issues per state for a specific project | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | PlannedFor | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Case | State | Pick List | ||||||
COUNT | Case | Object |
Description | Show all not closed issues assigned to specific person (you will be requested to set a specific issue type and a person after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Case | EntityType | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Case | AssignedTo | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#3 | Case | State | Pick List | FieldComparison | NotEqual | ConstraintFixedValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
All Issue Types Identifier | Case | Text | |||||||
Entity Type | Case | EntityType | Pick List | ||||||
State | Case | State | Pick List | ||||||
ID | Case | SYSID | String | ||||||
Assigned to | Case | AssignedTo | Reference To Object | ||||||
Resolved In Project | Case | PlannedFor | Reference To Object | ||||||
Title | Case | Title | String |
Description | This report shows all risk registers per project | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Risk | PlannedFor | Reference To Object | FieldComparison | In | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
ID | Risk | SYSID | String | ||||||
Title | Risk | Title | String | ||||||
Category | Risk | Category | String | ||||||
% Probability | Risk | PercentProbability | Double | ||||||
Impact | Risk | Impact | Integer | ||||||
Risk Rate | Risk | RiskRate | Double | ||||||
Due date | Risk | DueDate | DateTime | ||||||
Owner | Risk | Owner | Reference To Object | ||||||
Resolved In Project | Risk | PlannedFor | Reference To Object | ||||||
Risk Strategy | Risk | RiskState | Pick List | ||||||
Response Plan Description | Risk | MitigationPlan | String | ||||||
Contingency Plan | Risk | ContingencyPlan | String |
Description | Show all opened risks with Risk Probability and Impact sorted by Risk Rate | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Risk | State | Pick List | ||||||
ID | Risk | SYSID | String | ||||||
Title | Risk | Title | String | ||||||
Importance | Risk | Severity | Pick List | ||||||
Priority | Risk | Priority | Integer | ||||||
% Probability | Risk | PercentProbability | Double | ||||||
Impact | Risk | Impact | Integer | ||||||
Risk Rate | Risk | RiskRate | Double | ||||||
Assigned to | Risk | AssignedTo | Reference To Object | ||||||
Resolved In Project | Risk | PlannedFor | Reference To Object |
Projects
Description | Show all Projects with At risk status | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | TrackStatus | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | Project | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Project | TrackStatus | Pick List | ||||||
Conflicts | Project | Conflicts | Long | ||||||
State | Project | State | Pick List | ||||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Duration | Project | Duration | TimeEffort | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime | ||||||
% Complete | Project | PercentCompleted | Double | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Effort | Project | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Project | RemainingEffort | TimeEffort2 | ||||||
Manager | Project | Manager | Reference To Object | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long |
Description | Show all Projects with Off track status | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Project | TrackStatus | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | Project | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Project | TrackStatus | Pick List | ||||||
Conflicts | Project | Conflicts | Long | ||||||
State | Project | State | Pick List | ||||||
ID | Project | SYSID | String | ||||||
Name | Project | Name | String | ||||||
Duration | Project | Duration | TimeEffort | ||||||
Start Date | Project | StartDate | DateTime | ||||||
Due Date | Project | DueDate | DateTime | ||||||
% Complete | Project | PercentCompleted | Double | ||||||
Actual Cost | Project | ActualCost | Money | ||||||
Budgeted Cost | Project | PlannedBudget | Money | ||||||
Actual Effort | Project | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Project | RemainingEffort | TimeEffort2 | ||||||
Manager | Project | Manager | Reference To Object | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Project | CompletnessDefinition | Long |
Resource Load
Description | This report displays the resources work load and available time for the selected time frames, by groups and/or skills. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | This report enables you to monitor and control the resource utilization in your organization by showing you resource load and availability in different timeframes and scales grouped by different groups or skills sets. It is especially useful for Agile project management processes and is a big addition to the Clarizen Agile solution. When generating the report, either manually or via workflow rules, the user can choose what groups, skills, or specific users to include in the report, as well as the date range, time scales (days, weeks, and months), and units (hours, days) to generate it by. Additionally, the user can choose to run the report either by planned or remaining efforts of the selected resources. |
||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Resource Name | Object | ||||||||
Work Time (= total hours - exceptions) | User | Object | |||||||
Work load | User | Object | |||||||
Available time | User | Object |
Description | Show resources with total load greater than 100% in any day within a given date range | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show resources and task details with total load greater than 100% in any day within a given date range | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show resources with total load lower than 100% in any day within a given date range | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | Show resources and task details with total load lower than 100% in any day within a given date range | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Tasks
Description | Search for all tasks that are assigned to certain resources by their related group, job title or a skill | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Work Item | TrackStatus | Pick List | ||||||
State | Work Item | State | Pick List | ||||||
Importance | Work Item | Importance | Pick List | ||||||
Belong to Critical Path | Work Item | OnCriticalPath | Boolean | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Project | Work Item | Name | String | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
Manager | Work Item | Manager | Reference To Object | ||||||
Resources | Object | ||||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Expected Progress | Work Item | ExpectedProgress | Double |
Description | Show all Tasks with At risk status where I am the manager | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | TrackStatus | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | GenericTask | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show the last time active tasks where updated in specific project and by whom. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | GenericTask | State | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
Last Updated By | GenericTask | LastUpdatedBy | Reference To Object | ||||||
Last Updated On | GenericTask | LastUpdatedOn | DateTime | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks a user has updated. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | LastUpdatedBy | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
Last Updated By | GenericTask | LastUpdatedBy | Reference To Object | ||||||
Last Updated On | GenericTask | LastUpdatedOn | DateTime | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all Tasks with Off track status where I am the manager | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | TrackStatus | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | GenericTask | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks which are part of a critical path where I am the manager | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | OnCriticalPath | Boolean | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | GenericTask | Manager | Reference To Object | FieldComparison | Equals | ConstraintSpecialValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks on the critical path in a specific project (you will be requested to set the project after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | OnCriticalPath | Boolean | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | GenericTask | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks in a given project (you will be requested to set the project after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks starting in a given time range (you will be requested to set the dates after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | StartDate | DateTime | BetweenComparison | Between | ConstraintRuntimeValue | ConstraintRuntimeValue | ||
#2 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks with a specific status (you will be requested to set the status after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | TrackStatus | Pick List | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks with no resource assigned in all projects across the organization | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Human Resource | Object | FieldComparison | Equals | ConstraintSpecialValue | ||||
#2 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show all tasks with no resource assigned in a specific project (you will be requested to set the project after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Human Resource | Object | FieldComparison | Equals | ConstraintSpecialValue | ||||
#2 | GenericTask | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#3 | GenericTask | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | Show actually executed tasks from a specific project with Duration Variance less than zero “0”. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | DurationVariance | TimeEffort2 | FieldComparison | Before | ConstraintFixedValue | |||
#2 | GenericTask | ChildrenCount | Integer | FieldComparison | Equals | ConstraintFixedValue | |||
#3 | GenericTask | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | GenericTask | State | Pick List | ||||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Actual Start Date | GenericTask | ActualStartDate | DateTime | ||||||
Start Date Variance | GenericTask | StartDateVariance | TimeEffort2 | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
Actual End Date | GenericTask | ActualEndDate | DateTime | ||||||
Due Date Variance | GenericTask | DueDateVariance | TimeEffort2 | ||||||
Work | GenericTask | Work | TimeEffort2 | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Actual Duration | GenericTask | ActualDuration | TimeEffort | ||||||
Duration Variance | GenericTask | DurationVariance | TimeEffort2 | ||||||
Instance Number | GenericTask | Object |
Description | Show active tasks, where I am a resource, which I haven’t completed yet (including tasks starting during this week). | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | GenericTask | State | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
#2 | GenericTask | StartDate | DateTime | FieldComparison | LessThan | ConstraintSpecialValue | |||
#3 | User | Text | FieldComparison | Equals | ConstraintSpecialValue | ||||
#4 | Human Resource | ResourceRole | Pick List | FieldComparison | Equals | ConstraintFixedValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | GenericTask | TrackStatus | Pick List | ||||||
Conflicts | GenericTask | Conflicts | Long | ||||||
State | GenericTask | State | Pick List | ||||||
Importance | GenericTask | Importance | Pick List | ||||||
Belong to Critical Path | GenericTask | OnCriticalPath | Boolean | ||||||
ID | GenericTask | SYSID | String | ||||||
Name | GenericTask | Name | String | ||||||
Project | GenericTask | Project | Reference To Object | ||||||
Duration | GenericTask | Duration | TimeEffort | ||||||
Start Date | GenericTask | StartDate | DateTime | ||||||
Due Date | GenericTask | DueDate | DateTime | ||||||
% Complete | GenericTask | PercentCompleted | Double | ||||||
Actual Cost | GenericTask | ActualCost | Money | ||||||
Budgeted Cost | GenericTask | PlannedBudget | Money | ||||||
Actual Effort | GenericTask | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | GenericTask | RemainingEffort | TimeEffort2 | ||||||
Manager | GenericTask | Manager | Reference To Object | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | GenericTask | CompletnessDefinition | Long | ||||||
Instance Number | GenericTask | Object |
Description | This report provides Resource Planned Work of Tasks per a specific project and resource(s) | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Time Tracking
Description | This report displays a Cost, Billing and Profitability summary view for a all customer's across all projects based on the hours reported by the users and related expenses. Includes resources' cost and billing rates used to calculate totals. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Customer | Customer | Name | String | ||||||
Internal Customer ID | Customer | InternalId | String | ||||||
Customer ID | Customer | SYSID | String | ||||||
State | Timesheet | State | Pick List | ||||||
Billable | Work Item | Billable | Boolean | ||||||
Billing Type | Work Item | Object | |||||||
Internal ID | Work Item | InternalId | String | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item | Work Item | Name | String | ||||||
Resource | User | FirstName | String | ||||||
Total Hours | Timesheet | Object | |||||||
Total Cost (regular + overtime) | Timesheet | Object | |||||||
Total for Billing (regular + overtime) | Timesheet | Object | |||||||
Profitability | Timesheet | Object | |||||||
Profitability (%) | Timesheet | Object | |||||||
Regular Hours | Timesheet | Object | |||||||
Regular Cost Rate | Timesheet | Object | |||||||
Regular Billing Rate | Timesheet | Object | |||||||
Total Cost for Regular Hours | Timesheet | Object | |||||||
Billing for Regular Hours | Timesheet | Object | |||||||
Overtime Hours | Timesheet | Object | |||||||
Overtime Cost Rate | Timesheet | Object | |||||||
Overtime Billing Rate | Timesheet | Object | |||||||
Total Cost for Overtime | Timesheet | Object | |||||||
Billing for Overtime | Timesheet | Object | |||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Customer Allocation (%) | CustomerLink | CostAllocation | Double |
Description | This report displays all hours reported by all users for a specific project. The report displays both billable and non-billable hours. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Main Project ID | Work Item | SYSID | String | ||||||
Main Project | Work Item | Name | String | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Billable | Work Item | Billable | Boolean | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item Name | Work Item | Name | String | ||||||
Total Hours | Work Item | Object |
Description | This report displays a Cost, Billing and Profitability summary view for a customer across all projects based on the hours reported by the users and related expenses. Includes resources' cost and billing rates used to calculate totals. | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report presents detailed information on the hours invested for a specific customer. The report includes hours reported during the specific timeframe, date, resource that fulfilled the work and his comments. | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report displays a Cost, Billing and Profitability summary view for a specific project based on the hours reported by the users and related expenses. Report provides users' cost and billing rates used to calculate totals. | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report will display work utilization by project and resource within a selected time frame | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | This report provides visibility to the resource utilization by project in your organization. Basically this means that the report gives you an easy and readable way to compare what you planned for each resource to do in each project for a specific timeframe, with what has actually been done during that same time. In the report you can choose the selected time frame, and time scale (weekly, monthly), the status of the reported time to include (submitted, approved), the status of the projects to include (active, completed, etc.) and the report type. |
|||||||
Attributes |
|
|||||||
Available to |
|
Description | This report displays all work items and total hours reported by a specific user in the selected timeframe, including cost, billing and profitability information. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Timesheet | State | Pick List | ||||||
Billable | Work Item | Billable | Boolean | ||||||
Billing Type | Timesheet | Object | |||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item | Work Item | Name | String | ||||||
Reported By | User | FirstName | String | ||||||
Total Hours | Timesheet | Object | |||||||
Total Cost (regular + overtime) | Timesheet | Object | |||||||
Total for Billing (regular + overtime) | Timesheet | Object | |||||||
Total Cost | Timesheet | Object | |||||||
Total for Billing | Timesheet | Object | |||||||
Profitability | Timesheet | Object | |||||||
Profitability (%) | Timesheet | Object | |||||||
Regular Hours | Timesheet | Object | |||||||
Regular Cost Rate | Timesheet | Object | |||||||
Regular Billing Rate | Timesheet | Object | |||||||
Total Cost for Regular Hours | Timesheet | Object | |||||||
Billing for Regular Hours | Timesheet | Object | |||||||
Overtime Hours | Timesheet | Object | |||||||
Overtime Cost Rate | Timesheet | Object | |||||||
Overtime Billing Rate | Timesheet | Object | |||||||
Total Cost for Overtime | Timesheet | Object | |||||||
Billing for Overtime | Timesheet | Object | |||||||
% Complete | Work Item | PercentCompleted | Double |
Description | This report provides hourly report of user(s) in the timesheet within specific timeframe | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Reported Date | Timesheet | ReportedDate | Date | ||||||
State | Timesheet | State | Pick List | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item ID | Work Item | SYSID | String | ||||||
Work Item | Work Item | Name | String | ||||||
Reported By | User | FirstName | String | ||||||
Total Hours | Timesheet | Object | |||||||
Regular Hours | Timesheet | Object | |||||||
Overtime Hours | Timesheet | Object | |||||||
Comment | Timesheet | Comment | Text |
Description | This report will display all work items and total hours reported by a specific user in the selected timeframe | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
User | User | FirstName | String | ||||||
State | Timesheet | State | Pick List | ||||||
Billable | Work Item | Billable | Boolean | ||||||
Project ID | Work Item | SYSID | String | ||||||
Project | Work Item | Name | String | ||||||
Work Item | Work Item | SYSID | String | ||||||
Work Item | Work Item | Name | String | ||||||
Total Hours | Timesheet | Duration | TimeEffort |
Description | This report will display total hours reported by user per project within a selected time frame | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report will display total hours reported by selected users per date within a selected time frame | |||||||
---|---|---|---|---|---|---|---|---|
Additional Help | ||||||||
Attributes |
|
|||||||
Available to |
|
Description | This report will display total hours reported by user per date within a selected time frame | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
First Name | User | FirstName | String | ||||||
Last Name | User | LastName | String | ||||||
State | User | State | Pick List | ||||||
External User | User | ExternalUser | Boolean | ||||||
Total work time (hours) | User | Object | |||||||
Total | User | Object |
Users
Description | Total Number of non - working hours by user | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
User | Object | ||||||||
Direct Manager | Object | ||||||||
User Group | Object | ||||||||
Object | |||||||||
ינואר,0001 | Object | ||||||||
Total Hours | Object | ||||||||
Total Organization Days | Object |
Description | This report will display users and licenses summary | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes |
|
||||||||
Available to |
|
||||||||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
External User | User | ExternalUser | Boolean | ||||||
First Name | User | FirstName | String | ||||||
Last Name | User | LastName | String | ||||||
User | String | ||||||||
Office Phone | User | OfficePhone | String | ||||||
Allow Emails | User | AllowEmails | Boolean | ||||||
User Type | OrganizationLicenseSubscriptions | Pick List | |||||||
Purchase Date | OrganizationLicenseSubscriptions | Date | |||||||
Expiration Period (Days) | OrganizationLicenseSubscriptions | Double | |||||||
Expiration Date | OrganizationLicenseSubscriptions | Date | |||||||
State | OrganizationLicenseSubscriptions | State | Pick List | ||||||
Renewal Date | OrganizationLicenseSubscriptions | Date | |||||||
Auto Renewal | OrganizationLicenseSubscriptions | Boolean |
Work Items
Description | Show all work items with a specific manager across all projects (you will be requested to set the manager after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Work Item | Manager | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Work Item | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Work Item | TrackStatus | Pick List | ||||||
Conflicts | Work Item | Conflicts | Long | ||||||
State | Work Item | State | Pick List | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Duration | Work Item | Duration | TimeEffort | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Actual Cost | Work Item | ActualCost | Money | ||||||
Budgeted Cost | Work Item | PlannedBudget | Money | ||||||
Actual Effort | Work Item | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Work Item | RemainingEffort | TimeEffort2 | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long |
Description | Show all work items with a specific manager in a specific project (you will be requested to set the manager and project after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Work Item | Manager | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#2 | Work Item | Project | Reference To Object | FieldComparison | Equals | ConstraintRuntimeValue | |||
#3 | Work Item | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Work Item | TrackStatus | Pick List | ||||||
Conflicts | Work Item | Conflicts | Long | ||||||
State | Work Item | State | Pick List | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Duration | Work Item | Duration | TimeEffort | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Actual Cost | Work Item | ActualCost | Money | ||||||
Budgeted Cost | Work Item | PlannedBudget | Money | ||||||
Actual Effort | Work Item | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Work Item | RemainingEffort | TimeEffort2 | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long |
Description | Show all work items with a specific resource (you will be requested to set the resource after you run the report) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | ResourceEntity | Text | FieldComparison | Equals | ConstraintRuntimeValue | ||||
#2 | Work Item | State | Pick List | FieldComparison | In | ConstraintMultipleValues | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
Status | Work Item | TrackStatus | Pick List | ||||||
Conflicts | Work Item | Conflicts | Long | ||||||
State | Work Item | State | Pick List | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Duration | Work Item | Duration | TimeEffort | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
% Complete | Work Item | PercentCompleted | Double | ||||||
Actual Cost | Work Item | ActualCost | Money | ||||||
Budgeted Cost | Work Item | PlannedBudget | Money | ||||||
Actual Effort | Work Item | ActualEffort | TimeEffort2 | ||||||
Remaining Effort | Work Item | RemainingEffort | TimeEffort2 | ||||||
Manager | Work Item | Manager | Reference To Object | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long | ||||||
% Completeness Uncertain | Work Item | CompletnessDefinition | Long |
Description | Show work items from a specific project(s) with Duration Variance less than zero “0”. | ||||||||
---|---|---|---|---|---|---|---|---|---|
Additional Help | |||||||||
Attributes | |||||||||
Available to |
|
||||||||
Filters | |||||||||
# | Class | Field | Data Type | Filter Type | Operator | Value/From | To | ||
#1 | Work Item | DurationVariance | TimeEffort2 | FieldComparison | Before | ConstraintFixedValue | |||
#2 | Work Item | Project | Reference To Object | FieldComparison | In | ConstraintRuntimeValue | |||
Columns | |||||||||
Column Name | Class | Field | Data Type | Additional Help | |||||
State | Work Item | State | Pick List | ||||||
Status | Work Item | TrackStatus | Pick List | ||||||
ID | Work Item | SYSID | String | ||||||
Name | Work Item | Name | String | ||||||
Start Date | Work Item | StartDate | DateTime | ||||||
Actual Start Date | Work Item | ActualStartDate | DateTime | ||||||
Start Date Variance | Work Item | StartDateVariance | TimeEffort2 | ||||||
Due Date | Work Item | DueDate | DateTime | ||||||
Actual End Date | Work Item | ActualEndDate | DateTime | ||||||
Due Date Variance | Work Item | DueDateVariance | TimeEffort2 | ||||||
Work | Work Item | Work | TimeEffort2 | ||||||
Duration | Work Item | Duration | TimeEffort | ||||||
Actual Duration | Work Item | ActualDuration | TimeEffort | ||||||
Duration Variance | Work Item | DurationVariance | TimeEffort2 |