Configuration
- Last updated
- Aug 30, 2017
- Save as PDF
- Fundamentals
- User Interface Basics
- Screen Basics
- Data Picker
- Entering and Modifying URLs in Cells
- Navigating within a Screen
- Selecting Rows
- Sorting Rows
- Entering Data in Cells
- Resizing Columns
- Saving Changes in a Bottom Tray
- Canceling Changes in a Bottom Tray
- Splitter Bars
- Applying a Filter
- About the Portfolio Manager Tile
- Docking and Undocking a Screen
- Updating a Single Attribute’s Value on Multiple Rows
- Configured Screens
- Scripted Dialogs
- Column Sets
- Marking Portfolios and Entities as Favorites
- Exporting Information
- Using ProjectPlace Data
- Screen Basics
- Primary Navigation Bar Elements
- Banner Elements (Legacy UI)
- Using Planview.Me views in Planview Portfolios
- Ribbons and Tiles
- Configuring the Tile Layout on a Ribbon
- Manage Ribbon Tiles Screen Basics
- Tiles
- About the Analyze Tile
- Deleting a Tile
- Configurable Charts, Tables, and Visualizations
- Customized Reports
- Changing and Saving Parameters for a Customized Report Tile
- Viewing a Customized Report in an Email
- Configuring a Report Tile to Only Export Data
- Managing Subscriptions for Customized Reports
- Creating Standard Subscriptions to Email Customized Reports to Users
- Creating Standard Subscriptions to Save Customized Reports to a File Share
- Create Subscription Screen and Manage Subscription Screen Basics
- Creating Targeted Subscriptions for Customized Reports
- Create Targeted Subscription Screen and Manage Targeted Subscription Screen Basics
- Modifying Subscriptions for a Customized Report Tile
- Deleting Subscriptions for Customized Reports
- Predefined Charts and Tables
- About the Milestone Status – ProjectPlace Tile
- About the Portfolio Cost – ProjectPlace Tile
- About the Favorite Portfolio Analysis Table
- Using the Allocations at Risk Table
- About the Effort Overview Chart
- About the Milestones Table
- About the My Scheduled Assignments Graph
- Configuring Bubble Charts
- About the Portfolio Measurements Table
- About the Slipped Work Table
- About the Time Reported on Your Work Table
- About the Work Effort Table
- About the Not Staffed Work Table
- About the Growth-Share Matrix Tile and Product BCG Bubble Portlet
- Open Resource Requests
- Phase Effort
- Project Financial Plan Analysis
- Project Risks
- Sprint Burndown
- Sprint Velocity
- Timesheets Requiring Attention
- Requirements to Fill Tile
- Assignments Requested
- My Assignments Tile Screen Basics
- My Authorizations Tile Screen Basics
- My Support Tickets Tile Screen Basics
- Outcome Bubble
- Report Execution Data Screen Basics
- Sign-in Attempts Tile Screen Basics
- Private Power BI Tiles
- Portfolios
- Creating Portfolios
- Modifying a Portfolio Definition
- Extending Portfolio Invitations
- Joining a Portfolio
- Opening Portfolios
- Leaving a Portfolio
- Accessing Recently Visited Portfolios and Entities
- Working in Portfolio Summary Screens
- Managing Portfolio Membership Information
- Transferring Portfolio Ownership
- Deleting Portfolios
- Portfolio Community
- Creating a Discussion Group
- Subscribing to Discussion Groups
- Editing Discussion Groups
- Posting New Messages to a Discussion Group
- Responding to Posted Messages
- Posting Polls
- Participating in Polls
- Marking All Items in a Discussion Group as Read
- Deleting Messages or Polls from a Discussion Group
- Configuring Messages or Polls for Your Email Application
- Cancelling Discussion Group Subscriptions
- Closing and Reopening a Discussion Group
- Deleting Discussion Groups
- Using Messages in the Community
- Adding Messages to a Message Board
- Editing Messages Added to a Message Board
- Deleting Messages from a Message Board
- Permissions
- Preferences
- Lifecycles
- Working with Lifecycles
- About the Icons of Lifecycle Diagrams
- About the Lifecycle Action Menu
- Displaying a Lifecycle Diagram
- Displaying the Details of a Lifecycle Step
- Working with Lifecycle Status Changes
- Items on which Lifecycles Can Be Enabled
- Lifecycle Terminology
- Navigating a Lifecycle Diagram
- Working with Lifecycle Configured Screens
- Working with Lifecycle Scripted Dialogs
- Working with Support Ticket Assignments in a Lifecycle
- Responding to a Lifecycle Notification
- Delegating Lifecycle Steps to Another User
- Administering Lifecycles
- Working with Lifecycles
- Notifications
- Robotic Process Automation (RPA) Robot
- SharePoint
- Planview Portfolios Customer Care
- User Interface Basics
- Time Reporting
- Time Reporting Overview
- Manage Time Reporting and Timesheets
- About Timesheets and Tracking Time
- About the Portfolio Timesheet's Action Menu Options
- About the Portfolio Timesheet's Autofill Function
- About the Timesheet Screen's Action Menu Options
- Adding or Removing Items on the Portfolio Timesheet
- Elements of the Portfolio Timesheet's Select Work Screen
- Identifying the Status of a Timesheet
- Marking Action Items as Being Completed on Your Timesheet
- Portfolio Timesheet Screen Basics
- Portfolio Timesheet Screen Elements
- Reporting Time for Yourself
- Adding or Removing Items on a Timesheet
- Making Time-Log Entries
- Signing a Timesheet with Zero Hours
- Entering Allowances in a Timesheet
- Select Work Screen Basics
- Setting Portfolio Timesheet Preferences
- Setting Timesheet Preferences
- Specifying Items to Use on Future Timesheets
- Timesheet Screen Basics
- Using Keyboard Shortcuts to Navigate the Portfolio Timesheet
- Using Keyboard Shortcuts to Navigate the Portfolio Timesheet’s Select Work Screen
- Using Keyboard Shortcuts When Reporting Time
- Accessing and Using the Mobile Site
- Approving and Disapproving Time as a Project Manager
- Business Rules for Overdue Timesheets
- Managing Timesheets and Time Reporting for Resource Managers
- Subscribing to Timesheet Approval Email Notifications
- About Timesheets and Tracking Time
- Approving and Disapproving Time and Expenses (Overview)
- Requests
- Managing Requests Overview
- Requests Menu Basics
- Request Portfolio View Screen Basics
- Creating Request Portfolios
- Request View Screen Basics
- Creating a Request
- Reviewing Requests and Modifying Request Attributes
- Viewing Request Reports
- Dispatching a Request
- Changing the Status of a Request
- Deleting a Request
- Closing or Denying a Request
- Request Analytics and Reporting
- Managing Requests Overview
- Projects and Work
- Work Management Overview
- Using Work Management Screens Overview
- Work Menu Basics
- Work Portfolio View Screen Basics
- Work View Screen Basics
- Plan Screen Basics
- About the Schedule View
- About the Schedule and Assignments View
- About the Backlog View
- About the Schedule and Backlog View
- About the Resources and Assignments View
- Setting Preferences for the Plan Screen
- Using Filters to Narrow Down Screen Content on the Plan Screen
- Copying, Cutting, Pasting, and Moving Items on the Plan Screen
- About the Task Information Screen or Tray
- Work and Assignments Screen Basics
- About the Schedule View
- About the Schedule and Assignments View
- About the Backlog View
- About the Schedule and Backlog View
- About the Resources and Assignments View
- Setting Preferences for the Work and Assignments Screen
- Using Filters to Narrow Down Screen Content on the Work and Assignments Screen
- Copying, Cutting, Pasting, and Moving Items on the Work and Assignments Screen
- About the Task Information Screen or Tray
- Work Detail Screen Basics
- Dependencies Screen Basics
- Dependency Management Screen Basics
- Managing a Work Item's Attributes and Other Details
- Gantt Chart
- Using Aggregate Functions
- Using Keyboard Shortcuts in Work Management
- Using Color Gradient Ranges to Show Resource Utilization
- Work and Resource Management Screen Basics
- Deleting Work
- Associated Requests Screen Basics for Work
- Key Results Screen Basics
- Logbook Screen Basics for Work
- Overview Screen Basics for Work Entities
- Overview Screen Basics for Work Portfolios
- Creating Work
- Plan and Schedule
- Managing Iterative Work
- Agile Development
- Action Items
- Action Items Tile Screen Elements
- Action Item Detail Screen Elements
- Creating an Action Item
- Deleting Action Items
- Grouping Action Items
- Managing Action Items
- Managing Resource Assignments for Action Items
- Managing Team Assignments for Action Items
- Modifying an Action Item
- My Action Items Tile Screen Elements
- New Action Item Screen Elements
- Ranking Action Items
- Team Action Items Tile Screen Elements
- Working with Action Items Assigned to You
- Action Items Overview and Use Cases
- Critical Path Management (CPM) Overview
- Investment Dependencies
- Associating Work with a Release
- Reviewing a Work Item's Release Association
- About the Paste Options Screen
- Estimates
- Managing Iterative Work
- Work Financial Planning
- Execute and Track Progress
- Reviewing and Monitoring Work
- Work Baselines
- Work Progress and Status
- Work Execution: Understanding the Progressing Engine
- Best Practices for Onboarding In-flight Projects
- Concept of Progressing Remaining Resource Assignments
- Duration vs. Effort
- Establishes ACTUAL FINISH DATES based on time reported or manual status of work items or progress as planned assumptions
- Establish ACTUAL START dates based on approved time or manual status of work items or progress as planned assumptions
- Impact of Maximum Utilization when projects are progressed
- Planning, Resource Management and Time Reporting Use Cases
- Process APPROVED TIME and convert it into ACTUAL EFFORT
- Progressing Engine Timesheet Entry and Generation Options
- Progressing Options for Allocations
- Progressing Options for Requirements
- Progressing Options for Reserves
- Progress Inputs - Timesheets, Manual Status and Progress as Planned
- RE-CALCULATES REMAINING effort values relevant to the assignment type and selected options
- RE-CALCULATES SCHEDULED DATES / DURATIONS relevant to the configured/selected options
- Review how the Progressing Engine and resource assignment types are used to support a series of use case scenarios
- Schedule vs. Actual Dates and Durations
- Time Now
- Use Case 1 - Project Stage and Milestone Date Tracking Only
- Use Case 2 - Actual Hours Time Tracking Only
- Use Case 3 - Project Stage and Milestone Date Tracking with Actual Hours Time Tracking
- Use Case 4 - Resource Demand and Assignment Tracking Only
- Use Case 5 - High Level Schedule, Resource Planning and Time Tracking
- Use Case 6 - High Level Schedule, Resource Budget Management and Time Tracking
- Use Case 7 - Mature Rolling Wave Activity Level Planning and Tracking
- Manually Entering the Progress of Work (Introduction)
- Work Execution: Understanding the Progressing Engine
- Changes, Risks, and Issues (CRIs)
- Creating a Change, Risk, or Issue (CRI)
- Viewing and Modifying Changes, Risks, and Issues (CRIs)
- Transferring Changes, Risks, and Issues (CRIs)
- Deleting Changes, Risks, or Issues (CRIs)
- Moving Changes, Risks, and Issues (CRIs)
- Change Detail Screen, Risk Detail Screen, and Issue Detail Screen Basics
- Changes Tab, Risks Tab, and Issues Tab Screen Basics
- CRI Summary Screen Basics
- New CRI Screen and Edit CRI Detail Screen Basics
- Your Changes Tile, Your Risks Tile, and Your Issues Tile Screen Basics
- Creating a Column Set for Changes, Risks, and Issues
- Changes, Risks, and Issues Summary Screen Basics
- Support Tickets
- Closing Work or Canceling Work
- Objectives and Key Results (OKRs) for Work
- Sentiment Analysis
- Work Analytics and Reporting
- Resources
- Resource Management Overview
- Resource Management Screens Overview
- Resource Portfolios Overview
- Monitoring and Managing Resource Information
- Creating and Utilizing Teams
- Assignments
- Resource Assignment Types Overview
- Requirements
- Approving or Denying Requested Assignments
- Decrementing Requirements (Introduction)
- Entering Additional Assignment Information as a Project Manager
- How Planview Portfolios Determines the Default Requirement
- Linking or Unlinking a Requirement and an Assignment
- Making Direct Assignments
- Modify Requirement Criteria Screen Basics
- Order in Which Requirements Are Listed in the Select Requirement Screen
- Filling Unfilled Requirements
- Updating Unfilled Requirements as a Resource Manager
- Fill Requirement Screen Elements for Resource Managers
- Fill Requirement Screen Elements for Project Managers
- Reviewing Unfilled Requirements as a Resource Manager
- Reviewing Unfilled Requirements as a Project Manager
- About the Unfilled Requirements Screens
- Understand How Resource Scores are Calculated
- About the Modify Requirement Screen
- Configuring the Requirement Attributes Screen
- Associating Resource Requirements with Alternate Structures or Custom Fields
- Specifying Criteria and Additional Attributes for a Resource Requirement
- Resource Available to Fill Requirement Screen Elements
- Reserves
- Allocations
- Authorizations
- Eliminating Resource Overload
- Standard Activities
- Managing Assignments
- Resource Utilization
- z_Archive
- Resources Analytics and Reporting
- Resource Management Overview
- Financial Management
- Financial Planning
- Financial Management Concepts
- Formatting Financial Planning Screens
- Defining the Financials Screen's Display and Layout
- Defining the Financial Planning Detail Screen's Display and Layout
- Changing the Timescale Used to Display Data Over Time in a Financial Plan
- Selecting Financial-Planning Set Preferences
- Setting Your User Preferences for the Financials Screen
- Setting Your User Preferences for the Financial Planning Detail Screen
- Defining a Financial Plan
- Comparing Financial Plans
- Exporting and Importing Financial Planning Data
- Summarizing, Rolling Up, or Spreading Values in a Financial Plan
- Sponsorship
- Financial Management Analytics and Reporting
- Business Rules of Financial Management and Financial Planning
- Financial Planning
- Planning
- Planning Menu Basics
- Investment and Capacity Planning Concepts, Setup, and Tasks
- Investment and Capacity Planning Overview
- Setting Up Investment and Capacity Planning as a User
- About Creating Planning Portfolios as a User
- Investment and Capacity Planning Screen Basics
- Updating Capacity and Demand Data in Investment and Capacity Planning
- Exporting from Investment and Capacity Planning
- Scenarios
- Managing Investment and Capacity Planning Scenarios
- Using Shared Scenarios within Investment and Capacity Planning
- Adding Investment and Capacity Planning Scenarios
- Editing an Investment and Capacity Planning Scenario's Properties
- Refreshing an Investment and Capacity Planning Scenario
- Clearing Investment Decisions
- Deleting an Investment and Capacity Planning Scenario
- Compare Financial Data Across Scenarios for One Investment
- Managing Investment and Capacity Planning Scenarios
- Rank Investments
- Analyze Investments
- Shift Investments
- Balance Investments
- Compare Investments
- Publish in Investment and Capacity Planning
- Preferences
- Planning Analytics and Reporting
- Analytics and Reporting
- Ad-hoc Analysis
- Power BI
- Using Power BI
- Power BI Dashboards
- Analytics and Reporting - Power BI
- FastTrack Power BI Showcase Dashboards
- Power BI - Creating Power BI Content
- Power BI Data Source Options
- Power BI Compatibility with Planview Enterprise One
- Power BI Security Setup
- z_Archive
- FastTrack Analytics
- Administration Analytics
- Moving from EFFORT01 to EFFORT01B Reports
- My Overview Analytics
- Outcome Analytics
- OUT01 - Outcome Portfolio Details
- OUT02 - Outcome Portfolio Balance
- OUT03 - Outcome Portfolio Prioritization Matrix
- OUT04 - Outcome Portfolio Financial Health
- OUT08 - Outcome Portfolio Associated Change Requests
- OUT09 - Outcome Portfolio Associated Risks
- OUT11 - Outcome Portfolio Associated Issues
- OUT31 - Outcome Portfolio Revenue and Cost Analysis
- OUT32 - Outcome Revenue/Cost Forecast Performance
- OUT33 - Outcome Portfolio Revenue Prioritization Bubble
- OUT34 - Outcome Portfolio Risk and Reward Matrix
- OUT35 - Milestone Trend Analysis
- OUT35 - Milestone Trend Analysis (Administration)
- OUT51 - Outcome Portfolio Associated Work Matrix
- OUT52 - Outcome Portfolio Associated Work Balance
- OUT53 - Outcome Portfolio Balance Dashboard
- OUT54 - Outcome Portfolio Dashboard
- Planning Analytics
- Investment Planning Analytics (Deprecated)
- PLN01 - Investment Planning Demand vs. Portfolio Targets
- PLN01 - Investment Planning Demand vs. Portfolio Targets (Administration)
- PLN32 - Planning Portfolio Financial Burndown Comparison
- PLN32 - Planning Portfolio Financial Burndown Comparison (Administration)
- Requests Analytics
- Resource Analytics
- RES01 - Resource Portfolio Analysis
- RES03 - Resource Portfolio Supply and Demand
- RES03 - Resource Portfolio Supply and Demand (Administration)
- RES04 - Resource Portfolio Effort Analysis
- RES06 - Resource Management Health
- RES08 - Timesheet Compliance
- RES08 - Timesheet Compliance (Administration)
- RES10 - Resource Detail
- RES12 - Resource Pending Timesheets
- RES13 - Resource Attribute Effective Date Audit
- RES24 - Resource Scheduled Effort Detail
- RES25 - Resource Timesheet Monthly Summary
- RES26 - Resource Timesheet Weekly Detail
- RES27 - Resource Time Analysis
- RES28 - Resource Scheduled vs Actual Effort Analysis
- RES30 - Time Recharge Report
- RES30 - Time Recharge Report (Administration)
- RES53 - Resource Portfolio Balance Dashboard
- Strategic Analytics
- STR01 - Strategy/Program Portfolio Details
- STR02 - Strategic Portfolio Balance
- STR03 - Strategic Portfolio Prioritization
- STR04 - Strategy/Program Financial Health
- STR08 - Strategy Portfolio Associated Change Requests
- STR09 - Strategy Portfolio Associated Risk
- STR11 - Strategy Portfolio Associated Issues
- STR16 - Program Highlight Report
- STR16 - Program Highlight Report (Administration)
- STR31 - Strategic Portfolio Cost and Benefit Analysis
- STR32 - Strategic Portfolio Financial Performance
- STR33 - Strategic Initiative Pipeline Matrix
- STR34 - Strategic Portfolio Investment Risk and Reward
- STR35 - Milestone Trend Analysis
- STR35 - Milestone Trend Analysis (Administration)
- STR41 -Strategy Process Analysis - Lifecycle Stage
- STR42 - Strategy Process Analysis - Strategy Status
- STR43 - Strategy Process Analysis - Investment Approval
- STR51 - Strategy Portfolio Associated Work Matrix
- STR52 - Strategy Portfolio Associated Work Balance
- STR53 - Work Portfolio Balance Dashboard
- STR54 - Strategic Portfolio Dashboard
- Work and Project Analytics
- WRK01 - Project Pipeline Matrix
- WRK02 - Work Portfolio Balance
- WRK03 - Project Health Trend Analysis
- WRK04 – Project Financial Health
- WRK05 - Schedule and Effort Variance
- WRK06 - Work Effort Analysis (Scheduled and Actual)
- WRK08 - Change Request Matrix
- WRK09 - Risk Matrix
- WRK11 - Issue Matrix
- WRK12 - Project Health
- WRK13 - Project (and Portfolio) Business Case Report
- WRK14 - Project/Portfolio Highlight Report
- WRK14 - Project/Portfolio Highlight Report with Logbook
- WRK15 - Milestone Status
- WRK15 - Milestone Status (Administration)
- WRK16 - Project (and Portfolio) Status Report
- WRK17 - Portfolio Gantt Chart
- WRK18 - Project Timesheets for Approval
- WRK19 - Work Attribute Change History
- WRK20 - Expenditure Report
- WRK21 - Change Request History Analysis
- WRK22 - Risk History Analysis
- WRK23 - Issue History Analysis
- WRK24 - Project Scheduled Effort Detail
- WRK25 - Project Timesheets Monthly Summary
- WRK26 - Project Timesheets Weekly Detail
- WRK28 - Project/Portfolio Scheduled vs Actual Effort Analysis
- WRK28 - Project/Portfolio Scheduled vs Actual Effort Analysis (Administration)
- WRK29 - Resource Utilization
- WRK29 - Resource Utilization (Administration)
- WRK30 - Time Recharge Report
- WRK30 - Time Recharge Report (Administration)
- WRK31 - Work Portfolio Financial Analysis
- WRK32 - Project/Work Portfolio Financial Burndown Comparison
- WRK33 - Project Cost or Revenue/Benefit Bubble
- WRK34 - Work Portfolio Investment Balance Bubble
- WRK35 - Milestone Trend Analysis
- WRK35 - Milestone Trend Analysis (Administration)
- WRK41 - Project Process Analysis - Lifecycle Stage
- WRK41 - Project Process Analysis - Lifecycle Stage (Administration)
- WRK42 - Project Status Process Analysis
- WRK42 - Project Status Process Analysis (Administration)
- WRK43 - Project Investment Approval Process Analysis
- WRK43 - Project Investment Approval Process Analysis (Administration)
- WRK53 - Work Portfolio Balance Dashboard
- WRK54 - Work Portfolio Dashboard
- FastTrack Analytics Configuration
- FastTrack Analytics - Admin View Header
- FastTrack Analytics - Alternate Structures and Fields
- FastTrack Analytics - Attribute Details and Configuration Rules
- FastTrack Analytics - Attribute History Date and Duration Attributes
- FastTrack Analytics - Configuration Case Studies
- FastTrack Analytics - Configuration Principles
- FastTrack Analytics - Deployment Process
- FastTrack Analytics - Enhancements and Customizations
- FastTrack Analytics - Financial Management Attributes
- FastTrack Analytics - Global Defaults
- FastTrack Analytics - Highlight Reports Summary Section Configuration (WRK14/16 STR16)
- FastTrack Analytics - Investment Dependency Attributes
- FastTrack Analytics - Lifecycle Step Attributes
- FastTrack Analytics - Look and Feel Configuration
- FastTrack Analytics - Managing and Formatting Attributes
- FastTrack Analytics - Managing Chart and Attribute Colors in Reports
- FastTrack Analytics - Migrating from RPM Analytics v1 or v2.0 to v2.4.x
- FastTrack Analytics - Milestone Date Attributes
- FastTrack Analytics - On-Premises Installation
- FastTrack Analytics - Reporting Attributes
- FastTrack Analytics - Report Definition Files
- FastTrack Analytics - Report Logo Configuration
- FastTrack Analytics - Report Personas
- FastTrack Analytics - Report Printing and Exporting
- FastTrack Analytics - Report Troubleshooting
- FastTrack Analytics - Structures and Fields
- FastTrack Analytics - Testing New Version Reports During an Upgrade
- FastTrack Analytics - Upgrading from RPM Analytics v2.1 to the Latest Analytics
- FastTrack Analytics - Using Financial Management Data
- FastTrack Analytics - Using the Analytics
- FastTrack Analytics - Using the RPM Analytics in Other (Non-Production) Databases
- FastTrack Analytics - Versions & Editions
- FastTrack Analytics Version 16.0 Release Notes
- FastTrack Analytics Version 16.1 Release Notes
- FastTrack Analytics Version 16.2 Release Notes
- FastTrack Analytics Version 16.3 Release Notes
- FastTrack Analytics Version 16.4 Release Notes
- FastTrack Analytics Version 16.5 Release Notes
- FastTrack Analytics Version 16.6 Release Notes
- FastTrack Analytics Version 16.7 Release Notes
- FastTrack Analytics Version 17.0 Release Notes
- FastTrack Analytics Version 17.1 Release Notes
- FastTrack Analytics Version 3.0 Release Notes
- FastTrack Analytics Version 3.10 Release Notes
- FastTrack Analytics Version 3.1 Release Notes
- FastTrack Analytics Version 3.2 Release Notes
- FastTrack Analytics Version 3.3 Release Notes
- FastTrack Analytics Version 3.4 Release Notes
- FastTrack Analytics Version 3.5.1 Release Notes
- FastTrack Analytics Version 3.5 Release Notes
- FastTrack Analytics Version 3.6 Release Notes
- FastTrack Analytics Version 3.7 Release Notes
- FastTrack Analytics Version 3.8 Release Notes
- FastTrack Analytics Version 3.9 Release Notes
- RPM Analytics v2.2.1 Release Notes
- RPM Analytics v2.2.2 Release Notes
- RPM Analytics v2.2.4 Release Notes
- RPM Analytics v2.2.5 Release Notes
- RPM Analytics v2.2 Release Notes
- RPM Analytics Version 2.2.6 Release Notes
- RPM Analytics Version 2.3.1 Release Notes
- RPM Analytics Version 2.3.2 Release Notes
- RPM Analytics Version 2.3 Release Notes
- RPM Analytics Version 2.4.1 Release Notes
- RPM Analytics Version 2.4.2 Release Notes
- RPM Analytics Version 2.4 Release Notes
- RPM Analytics Version 2.5.1 Release Notes
- RPM Analytics Version 2.5.2 Release Notes
- RPM Analytics Version 2.5.3 Release Notes
- RPM Analytics Version 2.5.4 Release Notes
- RPM Analytics Version 2.5 Release Notes
- FastTrack Content Storage Page
- Archive
- RPM Analytics Catalog (Deprecated)
- FastTrack Analytics Catalog (deprecated)
- Assets and Applications
- AST01 - Application/Asset Portfolio Details
- AST02 – Application/Asset Portfolio Balance
- AST03 – Application Portfolio Prioritization Matrix
- AST04 - Assets Portfolio Financial Health
- AST31 – Application Portfolio Cost Analysis
- AST32 - Application Portfolio Cost Forecast Comparison
- AST33 - Application Portfolio Business Value Cost Matrix
- AST41 - Asset Process Analysis - Lifecycle Stage
- AST42 - Asset Process Analysis - Application Disposition
- AST53 - Asset Portfolio Balance Dashboard
- AST54 - Asset Portfolio Dashboard
- Product Analytics
- PRD01 - Product Portfolio Details
- PRD02 - Product Portfolio Balance
- PRD03 - Product Portfolio Prioritization Matrix
- PRD04 - Product Portfolio Financial Health
- PRD08 - Product Portfolio Associated Change Requests
- PRD09 - Product Portfolio Associated Risks
- PRD11 - Product Portfolio Associated Issues
- PRD31 - Product Portfolio Revenue and Cost Analysis
- PRD32 - Product Revenue/Cost Forecast Performance
- PRD33 - Product Portfolio Revenue Prioritization Bubble
- PRD34 - Product Portfolio Risk and Reward Matrix
- PRD41 - Product Process Analysis - Lifecycle Stage
- PRD42 - Product Process Analysis - Development Stage
- PRD43 - Product Process Analysis – Investment Approval
- PRD51 - Product Portfolio Associated Work Matrix
- PRD52 - Product Portfolio Associated Work Balance
- PRD53 - Product Portfolio Balance Dashboard
- PRD54 - Product Portfolio Dashboard
- Service Analytics
- SER01 - Service Portfolio Details
- SER02 - Service Portfolio Balance
- SER03 - Service Portfolio Prioritization Matrix
- SER04 - Service Financial Health
- SER31 - Service Portfolio Cost Analysis
- SER32 - Service Portfolio Cost Forecast Comparison
- SER33 - Service Portfolio Business Value Cost Matrix
- SER53 - Service Portfolio Balance Dashboard
- SER54 - Service Portfolio Dashboard
- Assets and Applications
- FastTrack Analytics Catalog (deprecated)
- RPM Analytics Catalog (Deprecated)
- Enabling Support for Rich Text in Reports
- Microsoft Outlook Add-In
- Analyze Charts and Table Tiles
- OData Access for Planview Portfolios
- Tabular Models
- Strategies
- Strategic Planning Overview
- Working with Strategic Entities
- Define a Strategic Plan's Schedule
- Strategy Baselines
- Strategic Financial Planning
- Strategic Entity Analytics and Reporting
- Strategic Analytics and Reporting
- Objectives and Key Results (OKRs) for Strategies
- Outcomes
- Outcome Portfolio Management Overview
- Work with Outcomes
- Define the Outcome Plan's Schedule
- Outcome Baselines
- Request Management for Outcomes
- Outcome Analytics and Reporting
- Business Cases
- Releases
- Content
- About Access Types
- About the Global Content and Template Content Folders
- Adding Content without Waiting for a Lifecycle Notification
- Checking In a Document or Undoing a Check Out
- Checking Out a Document
- Content Management Security
- Managing Content through the Review Content Screen
- Managing Content without Waiting for a Lifecycle Notification
- Opening the Review Content Screen
- Reviewing Content History
- Review Content Screen
- Searching for Content Files
- Setting Access Rights on Content Files
- Version Maintenance of Content
- Contracts
- Customers
- Administration
- Types of Administrators
- Administration Business Processes
- Administration Menu
- Users and Roles
- Configuring Resources and Associated Users
- User Configuration
- User Roles and Features
- Allowing Planview Support Access to Your Environment
- Giving Users Temporary Access to Your Environment
- Managing OAuth Clients
- Notifying Users with Delinquent Timesheets
- Rates
- Labor Costing
- Labor Rate Cards
- Labor Rate Lookups
- Labor Rate Sets
- Manage Payroll-code Sets
- Managing Labor Rates
- Overriding Rates
- Project Rates and Project Rate Overrides
- About the Project Rates Screen
- About the Project Rate Overrides Screen
- About the Project Resource Rates Screen
- Adding, Modifying, and Deleting Role-Based Rate Overrides
- Adding a Rate Override
- Applying Role Rate Overrides Automatically
- Deleting a Rate Override
- Manage Role Rate Overrides Screen Elements
- Viewing Project Rates for a Resource
- Viewing Resources and Rates for a Work Item
- Rates Diagnostics Overview
- Recoverable Labor Costs and Maximum Recoverable Hours
- Analytics and Reporting Administration
- Configuring On-Demand Reports
- Dataset Administration
- Data Mart Administration
- Model Management
- Adding and Deleting User-Defined Measures for FastTrack Tabular Models and Column Set Models
- Create Column Set Model Screen Elements
- Creating Column Set Models
- Manage Connection Strings Screen Elements
- Managing Connections to OLAP Cubes and Tabular Models
- New Connection String and Edit Connection String Screen Elements
- Reporting Content Management
- Report Subscription Management
- Calendars
- Attributes - Financial Planning, Fields, and Alternate Structures
- Attribute Best Practices
- Manage Attributes Screen Basics
- Editing Display Settings for an Attribute
- Fields
- Alternate Structures
- Creating a Custom Alternate Structure
- Review Alternate Structures Screen Basics
- Defining the Levels and Values of Alternate Structures
- Modifying an Alternate Structure's Definition
- Deactivating or Reactivating an Alternate Structure Value
- Sharing an Alternate Structure Among Primary Structures
- Default Alternate Structures
- Letting Users Focus on Projects by Alternate Structures
- Planview-Defined Alternate Structures
- Alternate Structure Numbering
- Enabling or Disabling History Tracking on an Alternate Structure
- Setting Charting Options for Alternate Structures
- Letting Users Track Expenditures through Attributes
- Determining which Alternate Structures Are Marked as Primary
- Displaying Sequence IDs of Alternate Structure Values
- Performing an IIS Reset
- Calculation Details for Financial Metrics (NPV, ROI, IRR, Payback Period)
- Lifecycles
- Before Adding a Lifecycle Model
- Adding or Editing Lifecycle Models
- About the Details and Characteristics of Lifecycle Steps
- Adding and Removing Secondary Segments
- Adding Incremental Lifecycle Models
- Adding Lifecycle Steps
- Business Rules for Lifecycles
- Copying Lifecycle Models
- Editing, Moving, or Deleting Lifecycle Steps
- Ensuring Users are Listed on the Select User Screen
- Grouping or Ungrouping Lifecycle Steps
- Modifying Lifecycle Models
- Setting Up Initial Lifecycle Models
- Suspending a Lifecycle
- Administer Lifecycles Screen Basics
- CRI Lifecycle Models
- Designing a Process Flow
- Lifecycle Steps, Actions, and Permissions
- Outcome Lifecycle Models
- Requests Lifecycle Models
- Strategic Planning Lifecycle Models
- Support Ticket Lifecycle Models
- Work Lifecycle Models
- z_Archive
- Menus, Tabs, and Ribbons
- Configuring the Layout of Menus on the Menu Bar
- Setting the Background Color of the Top of the Interface
- Setting the Menu and Screen that are Displayed when Users Sign in to Planview Portfolios
- Enabling or Disabling Menu Actions
- Creating Default Ribbon Configurations
- Adding Tabs to Entity View Screens
- Configuring the Elements of the Plan Screen Based on User Role
- Configuring the Elements of the Work and Assignments Screen Based on User Role
- Enabling or Disabling Options on the Main Menu
- Setting the Default Application Preferences
- Tile Management
- Tile Management Screen Basics
- Tile Management Screen Action Menu Options
- Configuring a Tile to Appear on Specific Ribbons
- Configuring Help Text for a Tile
- Configuring the Metric Display on a Table Tile
- Creating or Modifying a Customized Report Tile
- Creating or Modifying a Customized Table Tile
- Creating or Modifying a Power BI Premium Tile
- Creating or Modifying a Shared Power BI Tile
- Enabling or Disabling a Tile
- Enabling or Disabling Data Series for Configurable Charts
- Enabling or Disabling the Analyze Tile
- Setting and Removing the Required Feature to Use a Tile
- Sharing and Unsharing Configurable Charts and Tables
- Structures
- Primary Structures
- Defining the Levels and Values of a Structure
- Defining Structure Dependencies
- Business Capability Structure and Business Capabilities
- Outcome Structure
- Strategy Structure
- Work Structure
- Resource Structure
- Standard Activity Structure
- Contract Structure
- Sprint Structure
- Expenditure Type Structure
- Lifecycle Roles Structure
- Organizational Resources Structure
- Payroll Structure
- Release Structure
- Primary Structures
- Configured Screens
- Maintain Configured Screens - Screen Basics
- Designing Configured Screens
- Copying a Configured Screen
- Creating a Configured Screen
- Deleting a Configured Screen
- Modifying a Configured Screen
- Legacy Configured Screens
- Scripted Dialogs
- About Combining Scripted Dialogs with Configured Screens
- Adding or Modifying a Question and Question Responses
- Adding or Modifying a Test and Test Values
- Creating And-Or Environments
- Creating a Scripted Dialog
- Defining an Alternate Structure Action
- Defining a Go To Action
- Defining a Lifecycle Action
- Defining a Numerical Accumulator Action
- Defining a Text Buffer Action
- Defining a Work Breakdown Structure Action
- Modifying Scripted Dialogs
- Key Functionality of Scripted Dialogs
- Presentation of Scripted Dialogs
- Preventing Changes to Alternate Structures from within the Work Detail Screen
- Removing Items from a Scripted Dialog
- Columns and Column Sets
- Baseline Administration
- Business Capabilities
- Configurable Text
- Configuring Expenditures
- Configuring Strategic Financial Management
- Content Management Administration
- Controlling Permissions Requirements for Associating Entities
- Database Management
- Enabling the Strategic Management Options
- Global Options
- Additional Functionality Global Options
- Data Mart and Reporting Global Options
- Dates Global Options
- Expense Report Global Options
- General Global Options
- Lifecycles Global Options
- Optional Products Global Options
- Password Management Global Options
- Planview Portfolios Add-In for Microsoft Project Global Options
- Planview Shared Capabilities Global Options
- Requests Global Options
- Ribbon Options Global Options
- Theme Global Options
- Time and Billing Configuration Global Options
- User Administration Global Options
- Web Services Global Options
- Work Archiving Global Options
- Work Global Options
- Work Management Global Options
- Managing Settings for Objectives and Key Results (OKRs)
- Mapping Fields for the Planview Portfolios Add-In for Microsoft Project
- Providing Access to the Mobile Site
- Requests Administration Overview
- Running the CRI Escalation Process Immediately
- Setting Up Investment and Capacity Planning as an Administrator
- Setting Up Self-Registration and Session Timeout
- Setting Up Strategic Planning
- System Options
- Administer Time Periods System Options
- Administer Gates System Options
- Archive Work System Options
- Configuring Global Links
- Configuring which Fields Display on the Screens Used to Create Work
- Contract Rules System Options
- CRI Subtype Administration
- Customizable Fields System Options
- Find and Replace Work Description Access System Option
- Managing Filters on the Plan Screen
- Managing Filters on the Work and Assignments Screen
- Managing Filters on the Work and Resource Management Screen
- Managing the List of Approved Websites
- Notifications, Email Notifications, and Announcements System Options
- Quality Ranks System Options
- Rate Options Screen Basics
- SMI Factors System Options
- Status Rules System Options
- Timesheet Setup System Options
- Time Log Setup System Options
- Units System Options
- Work Estimating
- Operational Administration
- Calendar, Time, and the Planning Horizon
- Configuration Migration
- Comparing Configuration Items on the Source and Target Databases
- Configuration Migration Action Menus
- Configuration Migration Screen Basics
- Deleting Configuration Migration Mappings
- Manually Mapping a Configuration Item Between the Source and Target Databases
- Manually Mapping Structure Values for a Configuration Item Between the Source and Target Databases
- Migrate Screen Basics
- Migrating Configuration Items From One Database to Another
- Next Action Status Messages
- Resolving Database Differences for Configuration Items Before Migration
- Reviewing Details for Configuration Items
- Verifying Whether Configuration Items Are Configured Identically
- Viewing Component Dependencies for Configuration Items
- Viewing Configuration Migration Logs
- View Component Dependencies Screen Basics
- Data Mart
- Displaying Custom Logos
- Progressing Engine Administration
- Refreshing the Turbo Enterprise Scheduling Engine Cache
- Strategic Planning and Investment and Capacity Planning Differences
- Work Estimating Administration
- Financial Management Administration
- Administering Financial Management
- Enterprise and Fiscal Calendar Basics
- Modifying an Enterprise and Fiscal Calendar
- Splitting or Merging an Enterprise and Fiscal Calendar Period
- Creating an Enterprise and Fiscal Calendar
- Renaming an Enterprise and Fiscal Calendar
- Configuring Models if There Are Multiple Enterprise and Fiscal Calendars
- Defining the Structure of Your Financial Planning Accounts
- Deleting an Enterprise and Fiscal Calendar
- Setting Financial Management System Global Options
- Using Models and Versions in Financial Management
- Adding Financial Planning Models
- Adding Versions of Financial-Planning Models
- Copying Financial Planning Information as an Administrator
- Deleting Versions of a Financial Plan
- Editing a Financial Planning Version
- Editing Existing Financial Planning Models
- Configure Versions for Financial Planning Models Screen Basics
- Defining Period Display Rules in Financial Management
- Rolling Up a Version to Summarize Costs and Benefits
- Setting Up Financial-Planning Accounts Overview
- Financial Planning Configuration
- Using Multiple Currencies in Financial Management
- About Calculating Depreciation
- Working with Depreciation Templates
- Viewing Depreciation Templates
- Adding a Depreciation Template
- Modifying a Depreciation Template
- Copying a Depreciation Template
- Setting the Schedule for Expenditures in a Depreciation Template
- Modifying or Deleting the Schedule for Expenditures in a Depreciation Template
- Associating Depreciation Templates with Cost Centers
- Associating Capital Accounts and Depreciation
- Administering Financial Management
- Job Stream Management
- Creating and Managing a Job Stream
- Add Year to Financial Calendar Job Parameters
- Adjust Financial Periods Job Parameters
- Agile Costing Load Time Job Parameters
- Column Set Model Update Job Parameters
- Copy Financial Version Job Parameters
- Copy to Database Job Parameters
- CRI Escalation Job Parameters
- Cubes Update Job Parameters
- Daily Table Update Job Parameters
- Data Mart Update Job Parameters
- Email Notifications Job Parameters
- Financial Plan Load Job Parameters
- Integrations Job Parameters
- Jobs Relevant to the Financial Repository
- Odata Power BI Report Refresh Job Parameters
- Progression Job Parameters
- Rates Table Update Job Parameters
- Refresh Labor Cost Job Parameters
- Refresh Organizational Resources Job Parameters
- Rollup Financial Version Job Parameters
- Sentiment Analysis Update Job Parameters
- Targeted Subscriptions Job Parameters
- Update Baseline Job Parameters
- Running a Job Stream Now
- Scheduling a Job Stream
- Monitoring a Job Stream
- Using a Log to Monitor Jobs in a Job Stream
- Cancelling a Job Stream
- Enabling Failure Notification Emails for a Job Stream
- Job Stream Management Screen Basics
- Creating and Managing a Job Stream
- Language Support
- Portfolios Videos
- Action Item Tiles
- Add a Request (PRM)
- Add Work
- Admin - Configured Screens Before You Convert
- Admin - Configured Screens Configure Add New Work
- Admin - Configured Screens Converting and Activating Add New Work
- Admin - Configured Screens Smart Logic
- Admin - Overview of Alternative Structure Types
- Admin - Overview of Primary Structure Types
- Align Reserves with Work Dates
- Approve and Disapprove Timesheets as a Project Manager
- Approve and Disapprove Timesheets as a Resource Manager
- Approve Resource Assignment Requests
- Assign Multiple Reserves and Requirements
- Authorizations
- Backlog Management
- Backlog Management R16
- Create a Portfolio
- Create a Strategic Entity
- Create Requirements
- Creating Relationships between Work Items
- Critical Path Management and Scheduling
- Dispatch Requests
- Drag and Drop to Substitute Assignments
- Editable Strategy Portfolio Manager
- Edit the Work Schedule - Overview
- Enterprise Project and Resource Management and Projectplace - Connector
- Enterprise Project and Resource Management and Projectplace - Connector R16
- Enter Effort on a Timesheet
- Extend Task Dates without Impacting Allocation Dates
- Fill Requirements Directly
- Introduction to Logical Relationships
- Introduction to Reporting in Planview Enterprise One Portfolio and Resource Mgmt
- Investment and Capacity Planning - Shift View
- Manage Over and Under Utilized Resources
- Manage the Ribbon
- Manage Work Constraints
- My Overview Menu
- My Scheduled Assignments
- Navigate the Resource Management and Assignments Screen
- Navigate the Resource Management and Assignments Screen R17
- Navigate the Work and Assignments Screen
- Navigate the Work and Assignments Screen R17
- Navigate the Work Portfolio Manager
- Navigate the Work View
- Navigating Portfolio and Resource Management
- Navigating the Resource Management and Assignments Screen
- Overview of Assignment Types
- Overview of Financial Planning Detail Screen R16
- Overview of Investment and Capacity Planning
- Overview of Managing Portfolios
- Overview of Managing Resources
- Overview of Managing Work
- Overview of Strategic Planning
- Overview of the Portfolio and Resource Management Application
- Overview of the Portfolio and Resource Management Application R16
- Overview of Work Management
- Over Allocated Reserves
- Portfolios Overviews – User Experience Ease-of-Use Walkthrough
- Portfolio Timesheet Overview
- Reassign and Delegate Dispatch Responsibilities
- Removing Relationships between Work Items
- Resource Management and Assignments View - Single Resource
- Review Resource Utilization
- Role-based Billing Rate Override
- Standard Activities
- Strategic Portfolios - Group By
- Understanding Lifecycles
- Use and Edit Column Sets
- Use Payroll Codes
- Use the Remaining Planned and Revised Estimate Columns on a Timesheet
- Using a Mobile Device to Approve or Disapprove a Timesheet
- Using Menus
- Using Navigational Search
- Using the Data Picker
- Using Work Baselines
- Working with Grants
- Working with Preferences
- Work Management Overview
- Work with Requests (PRM)
- Add-Ins
- Planview Portfolios Add-In for Microsoft Project
- Data Management and the Planview Portfolios Add-In for Microsoft Project
- Learn About the Loading of Calendars and the Planview Portfolios Add-In for Microsoft Project
- Understanding Resource Field Mappings and Business Rules
- Understanding Work-Related Field Mappings and Business Rules
- Understanding Time Reported Field Mappings and Business Rules
- Understanding Requirement Field Mappings and Business Rules
- Understanding Reserve Field Mappings and Business Rules
- Understanding Allocation Field Mappings and Business Rules
- Examples of the Add-In Managing Milestone Data
- Installing the Planview Portfolios Add-In for Microsoft Project
- Saving a Microsoft Project Plan to Planview Portfolios
- Working in the Planview Portfolios Add-In for Microsoft Project
- Adding Planview Portfolios Resources and Organizational Resources into Microsoft Project
- Configuring the Planview Portfolios Add-In for Microsoft Project
- Creating a New Microsoft Project Plan and Saving It as a Planview Portfolios Project
- Learn About the Messages the Planview Portfolios Add-In for Microsoft Project Displays
- Opening a Planview Portfolios Project through Microsoft Project
- Managing IDs after Copying and Pasting Rows in a Microsoft Project Plan
- Tips for Working in the Planview Portfolios Add-In for Microsoft Project
- Updating a Microsoft Project Plan with Planview Portfolios Data
- Viewing Mappings in the Planview Portfolios Add-In for Microsoft Project Uses
- Data Management and the Planview Portfolios Add-In for Microsoft Project
- Planview Portfolios Add-In for Microsoft Project
- Connectors
- Planview Portfolios and AgilePlace Connector
- Planview Portfolios and ProjectPlace Connector
- Getting Started
- Configuration
- Connected Projects and Workspaces
- Connected Tasks and Activities
- Connected Cards and Action Items
- Connected Resources
- Connected Templates
- Best Practices and Important Information
- Legacy Migration Process
- Managing Connected Plans in ProjectPlace
- Partial Plan (WBS) Synchronization
- Team Member FLEX Timesheet
- Encrypting Sensitive Data
- Roles
- Planview Portfolios and IdeaPlace Connector
- Planview Portfolios and Planview Enterprise Architecture Connector Page
- Integrations
- Installing Planview Portfolios
- Planview Enterprise One – PRM Pre-Installation Readiness
- Analytics and Reporting Server (Recommendations)
- Analytics and Reporting Server
- Analytics and Reporting Server
- Cloud Based Services for Product Help
- IaaS
- Database User for Web Query Services
- Firewall Port Considerations
- Microsoft Project Add-in
- MS SQL Database Engine
- MS SQL Database Engine
- Oracle Database Server
- Oracle Database Server
- Oracle Schema Creation
- Readiness Checklist
- Web Servers (Recommendations)
- Web Server
- Web Server
- Planview Enterprise One – PRM Installation Documents
- About the Functionality Validation
- Administration Tools Installation Results
- Analytics and Reporting Validation Checks
- Administration Tools Installation
- Application Server - Data Gateway Installation
- Application Server - Turbo Enterprise Scheduling Engine Installation
- Applying Updates and Patches
- Architecture Information
- Configuration in a Multiple Web Server Environment
- Configure Ad-Hoc Analysis
- Configuring the Analytics and Reporting Server
- Configuring PVLoader Options
- Connecting a Cube
- Connecting a Model
- Database Connectivity
- Database Maintenance Utililties
- Database Object Creation
- Data Gateway Installation Results
- Editing the RSPortal.exe.config file
- Editing the RSPowerBI.exe.config file
- Editing the RSReportServer.config file
- Editing the RSSrvPolicy.config file
- Editing the Web.config file
- Examples of Setting Parameters for PVLoader
- Finalizing Power BI Report Server custom authentication
- High Availability for Planview Enterprise One – PRM
- Hosted Installation
- Importing OLAP Cubes and Tabular Models
- Importing the Primary Web Server's Machine Key
- Installing Database Components
- Installing Financial Repository Components
- Installing Planview Enterprise One – PRM to a second Web Server
- Installing PVLoader
- Knowledge Assumptions
- Other PVLoader Resources
- Other Resources
- PBIRS Upload Utility
- Portfolio and Resource Management Job Execution Service Account
- Portfolio and Resource Management Web Application Service Account
- Portfolio and Resource Management/Administrative Validation Checks
- Analytic and Reporting Server Custom Authentication
- Prerequisties to Installing PVLoader
- PRM Analytics and Reporting Installation
- PRM Installation Next Steps
- Progressing Engine Installation
- Progressing Engine Installation Results
- Progressing Engine Validation Checks
- PVLoader Non-Web Server Installation
- Subscription Set Up
- SSL Configuration
- Turbo Enterprise Scheduling Engine Installation Results
- Type Parameter
- Upgrading or Creating the PRM Data Mart Database
- Upgrading or Creating the PRM Transactional Database
- Verifying the Installation
- Web Server - PVEConfig.exe
- Web Server - PVEConfig.exe (continued)
- Web Server - Setting Up a Single-Language User Interface
- Web Server Installation
- Web Server Installation Results
- What to Do Next
- Planview Enterprise One – PRM Pre-Installation Readiness
- Advanced Help Topics
- Best Practices
- Technical Notes
- Planview Portfolios Product Releases
- 2022
- 2023
- January 2023 Release Notes for Planview Portfolios
- February 2023 Release Notes for Planview Portfolios
- March 2023 Release Notes for Planview Portfolios
- April 2023 Release Notes for Planview Portfolios
- May 2023 Release Notes for Planview Portfolios
- June 2023 Release Notes for Planview Portfolios
- July 2023 Release Notes for Planview Portfolios
- August 2023 Release Notes for Planview Portfolios
- September 2023 Release Notes for Planview Portfolios
- October 2023 Release Notes for Planview Portfolios
- November 2023 Release Notes for Planview Portfolios
- December 2023 Release Notes for Planview Portfolios
- Notice to On-Premises Customers: Monthly Product Updates for Planview Enterprise One – PRM and Planview Portfolios Ending in April 2023
- Planview Portfolios Quick Reference: Updates to Menus and Navigation Administration Reference – October 2023
- Planview Portfolios Quick Reference: Updates to Menus and Navigation – October 2023
- 2024
- January 2024 Release Notes for Planview Portfolios
- February 2024 Release Notes for Planview Portfolios
- March 2024 Release Notes for Planview Portfolios
- April 2024 Release Notes for Planview Portfolios
- May 2024 Release Notes for Planview Portfolios
- June 2024 Release Notes for Planview Portfolios
- July 2024 Release Notes for Planview Portfolios
- August 2024 Release Notes for Planview Portfolios
- September 2024 Release Notes for Planview Portfolios
- October 2024 Release Notes for Planview Portfolios
- November 2024 Release Notes for Planview Portfolios
- December 2024 Release Notes for Planview Portfolios
- 2025
- Planview Portfolios Known Issues and Usage Considerations
- Planview Portfolios New Feature Upgrade Guide
- Administration - Architecture Enhancements
- Administration - Attribute Management Enhancements
- Administration - Configured Screens
- Administration - Database Management Enhancements
- Administration - Financial Management Enhancements
- Administration - Lifecycles
- Administration - Menu, Ribbon and Tile Enhancements
- Administration - Organizational Resources Enhancements
- Administration - Rate Administration Enhancements
- Administration - System Configuration Enhancements
- Administration - User / Resource Administration Enhancements
- Analytics and Reporting - Data Source Enhancements
- Analytics and Reporting - FastTrack Analytics Enhancements
- Analytics and Reporting - Power BI Enhancements
- Analytics and Reporting - Report Tiles (SSRS) Enhancements
- Changes, Risks and Issues (CRI) Enhancements
- Dependency Management
- Financial Planning - Excel Download / Import Enhancements
- Financial Planning - Expenditure Enhancements
- Financial Planning - Financial Administration Enhancements
- Financial Planning - Financial Column Enhancements
- Financial Planning - Financial Planning Detail Enhancements
- General / Navigational Enhancements
- Connectors and Integrations Enhancements
- Investment and Capacity Planning - Financial Planning Enhancements
- Investment and Capacity Planning - General / Navigational Enhancements
- Investment and Capacity Planning - Planning Views and Column Set Enhancements
- Investment and Capacity Planning - Reporting Enhancements
- Investment and Capacity Planning - Scenario Planning Enhancements
- Investment Dependencies
- Outcomes - General / Navigational Enhancements
- Outcomes - Portfolio View and Column Set Enhancements
- Outcomes - Roadmap Enhancements
- Outcomes - Screens
- Progressing Engine Enhancements
- Requests Enhancements
- Resources
- Resource Management and Assignments - Assignment Management Enhancements
- Resource Management and Assignments - Column Set Enhancements
- Resource Management and Assignments - Effort Profile Enhancements
- Resource Management and Assignments - General / Navigational Enhancements
- Resource Management and Assignments - Reporting Enhancements
- Strategy - General / Navigational Enhancements
- Strategy - Portfolio View and Column Set Enhancements
- Strategy - Roadmap Enhancements
- Strategy - Screens
- Time Reporting Enhancements
- Web Services Enhancements
- Work - Screens
- Work and Assignments - Action Item Enhancements
- Work and Assignments - Assignment Management Enhancements
- Work and Assignments - Baseline Management Enhancements
- Work and Assignments - Column Set Enhancements
- Work and Assignments - General / Navigational Enhancements
- Work Delivery Enhancements
- Work Portfolio View
- Tips and Tricks
- Planview Portfolios Glossary
Business Capabilities
- Explains what a business capability is and provides general information about configuring the system to support business capabilities.
Configurable Text
- Explains the purpose of configurable text, describes what configurable text keys and values are, gives an overview of the process of customizing configurable text, the screen administrators use to manage configurable text keys and values, and the tasks relevant to customizing configurable text.
Configuring Expenditures
- Provides an overview of the tasks an administrator performs to configure the system for expenditures.
Configuring Strategic Financial Management
- Discusses what strategic financial planning involves, describes the two approaches you can take to define financial plans for strategic planning purposes, and provides an overview of the steps administrators take to set up strategic Financial Management.
Content Management Administration
- General information about the tasks administrators perform for Content Management.
Controlling Permissions Requirements for Associating Entities
- Describes how administrators can control the types of permissions users need to be able to allocate or associate one type of entity with another type of entity in Planview Portfolios.
Database Management
- Provides an overview of managing Planview Portfolios databases.
Enabling the Strategic Management Options
Global Options
- Provides an overview of global options and links to each global option category. Global options are a separate category of system options.
- Additional Functionality Global Options
- Data Mart and Reporting Global Options
- Dates Global Options
- Expense Report Global Options
- General Global Options
- Lifecycles Global Options
- Optional Products Global Options
- Password Management Global Options
- Planview Portfolios Add-In for Microsoft Project Global Options
- Planview Shared Capabilities Global Options
- Requests Global Options
- Ribbon Options Global Options
- Theme Global Options
- Time and Billing Configuration Global Options
- User Administration Global Options
- Web Services Global Options
- Work Archiving Global Options
- Work Global Options
- Work Management Global Options
Managing Settings for Objectives and Key Results (OKRs)
Mapping Fields for the Planview Portfolios Add-In for Microsoft Project
- Explains how to create field mappings the add-in uses when transferring data between Planview Portfolios and Microsoft Project.
Providing Access to the Mobile Site
- Describes providing access to the Planview Portfolios mobile site.
Requests Administration Overview
- Includes general information about the tasks an administrator does to configure the product to support users managing requests
Running the CRI Escalation Process Immediately
Setting Up Investment and Capacity Planning as an Administrator
- Outlines the tasks an administrator performs to set up investment and capacity planning.
Setting Up Self-Registration and Session Timeout
Setting Up Strategic Planning
- Overview of tasks an administrator performs to set up strategic planning.
System Options
- Explains what system options are and how to access system options; includes brief descriptions of system options and provides links to other articles relevant to those options.
- Administer Time Periods System Options
- Administer Gates System Options
- Archive Work System Options
- Configuring Global Links
- Configuring which Fields Display on the Screens Used to Create Work
- Contract Rules System Options
- CRI Subtype Administration
- Customizable Fields System Options
- Find and Replace Work Description Access System Option
- Managing Filters on the Plan Screen
- Managing Filters on the Work and Assignments Screen
- Managing Filters on the Work and Resource Management Screen
- Managing the List of Approved Websites
- Notifications, Email Notifications, and Announcements System Options
- Quality Ranks System Options
- Rate Options Screen Basics
- SMI Factors System Options
- Status Rules System Options
- Timesheet Setup System Options
- Time Log Setup System Options
- Units System Options
Work Estimating