Configuring Report Data Table Columns

The following configuration is maintained in the Table Columns node in the Report ID branch of the FastTrack Report Configuration Structure.

Parameter Description Configuration Options Example Settings
Table Columns Options The report supports a total of 4 table columns that can be configured to appear in the report.
 
Two columns are available for configuration before the resource name which can be used to show any resource attribute or OBS parent information.

Two columns are available after the resource name which can be used to show any resource attribute. 

If effective dates are enabled on the attributes after the resource name then each value will be shown as a separate line with supply/demand time phased according to the effective dates.
The following table columns are included in the default FastTrack configuration for the report:
  • 2. (OBS)
  • 3. (OBS)
    • Resource Name
  • Resource Types
  • Location 
Expressed in the table columns node of the FastTrack Report Configuration Structure as: 
  • obs_level_2_res
  • obs_level_3_res
  • cbs1_res
  • loc_res

           

           

Configuring User Parameter Defaults

The following configuration is maintained in the Parameter Defaults node in the Report ID branch of the FastTrack Report Configuration Structure.

Parameter Description Configuration Options Example Settings
Slice By A resource or work attribute can be selected as the attribute to analyze the demand (and where applicable) the capacity.
A default can be set using:
  • slicer1=
The attributes available for use include:
  • Any resource single select, or multiple select that has primary value, enabled for resources, that is shared with org-res.
    Pipe separation for resource attribute and org-res attribute, must be the same attribute.
  • Work attributes
The default FastTrack configuration for the parameter is set to slice by:
  • Resource Role (Primary Value)
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • slicer1=obs20_prim_res
Approval States Status of assignments that will be included in the demand. A default can be set using:
  • approval_state=
Applies to reserves and allocations. Options are:
  • APR - Approved Only
  • REQ - Approved and Requested
The different assignment statuses are shown in the charts as pastel colors.
The default FastTrack configuration for the parameter will show:
  • Approved and Requested
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • approval_state=REQ
Effort Unit Unit of measure used for effort. A default can be set using:
  • effort_unit=
Options are:
  • hour - Hours
  • day - Days
  • fte - FTE
Conversion of hours or days is based on the standard calendar.
The default FastTrack Configuration for the parameter will show effort in:
  • Hours
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • effort_unit=hour
Breakdown Effort By Breakdown by Week, Month, or Quarter time slices in chart or table. A default can be set using:
  • breakdown_by=
Options are:
  • week
  • month
  • quarter
The default FastTrack configuration for the parameter will breakdown by:
  • Months
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • breakdown_by=month
Range Start/End Date range that is used to determine demand and capacity returned. Default dates can be specified using:
  • default_range_start=
    default_range_end=
Works with the “Breakdown Effort By” parameter to define a range of time intervals to use as the start and end date range. If the “Breakdown Effort By” is months, then parameters of -2 to 3 will default back 2 months and forward 4 months. The forward value is incremental on the current month.
The default FastTrack configuration for the Range will be:
  • Start from 2 Months Back
  • End at 5 months forward
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • default_range_start=-2
  • default_range_end=4
Include Demand against "Unassigned" Org Res? Determines whether unassigned demand is included in the report. A default can be set using:
  • include_unassigned=
Options are:
  • Y - Yes
  • N - No
If this is checked 'Yes' then any requirements for “Unassigned-xxx” and “xxx-Unassigned” org-res nodes will be included in the report.
The default FastTrack configuration for including Unassigned demand is:
  • Do not Include
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • include_unassigned=N
Show Controls which charts and tables are displayed in the report. A default can be set using:
  • show_items=
6 options are available:
  • summary - Chart: Portfolio Summary
  • slicer - Chart: Portfolio by Slicer
  • assignment - Chart: Portfolio by Assignment Type
  • attribute - Chart: By Attribute
  • resource - Chart: By Resource
  • table1 - Table: Attribute/Resource
Accepts multiple values.
The default FastTrack configuration for showing charts and tables is:
  • Show All
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • show_items=summary
  • show_items=slicer
  • show_items=assignment
  • show_items=attribute
  • show_items=resource
  • show_items=table1
Include Out of Portfolio Demand



Note: This parameter is not applicable to this report when run as RES03 against a resource portfolio.
This option determines whether or not resource assignments to work and standard activities that are outside the selected work portfolio/project and considered as demand and plotted as out-of-portfolio utilization.

The parameter is ONLY be applicable to the WRK29 derivative of this report which executes against a work portfolio. 
N/A N/A
Detail Table Format

 
This parameter determines the format of the detailed data table in the report. Users can select a formatted layout, with grouping either expanded or collapsed, or a plan, flat-table, format that is designed for use when exporting the report to Excel for further data analysis. A default can be set using:
  • table_format=
Possible values are:
  • collapsed
  • expanded
  • plain
The default FastTrack configuration for is set to format the detail table as:
  • Collapsed
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • table_format=collapsed

           

           

Other Configuration Options

The following configuration is maintained in the Parameter Defaults node in the Report ID branch of the FastTrack Report Configuration Structure.

Parameter Description Configuration Options Example Settings
Hide Non-Utilizable Standard Activity on Non Working Days This advanced parameter can be utilized to control the way that the report handles how non-utilized standard activities reported on non-working days are handled. This supports the use case where;
  • The calendar has the day set as a non-working day (for example Thanksgiving), meaning that there is zero capacity on that day.
  • Time is reported on such a day and it appears that the day was productive. 
A default can be set using:
  • hide_nusa_on_nwd=
Possible values are:
  • Y - Hide
  • N - Do no Hide
If enabled, any non-utilizable standard activities scheduled or actually worked on a non-working day (according to the resource's calendar) will be ignored in the utilization calculation.
The default FastTrack configuration for is set to:
  • Do not Hide Non-Utilizable Standard Activity on Non Working Days
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • hide_nusa_on_nwd=N
No configuration entry will also default to "N"
Treat Standard Activities as Project

 
The configuration of this report supports two method of displaying standard activities.

By default (parameter set to "N") standard activities all display under a project as separate activities with the project name “Standard Activities” (or whatever they are called in the standard activities primary structure).

Alternatively, (parameter set to “Y”) you can display each standard activity as a separate project in the report.
A default can be set using:
  • treat_stdact_as_project=
Configuration options are:
  • Y - Treat Standard Activites as Projects
  • N - Do not Treat Standard Activites as Projects 
The default FastTrack configuration for the parameter will:
  • Not Treat Standard Activities as Project
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • treat_stdact_as_project=N
Utilization Metric Calculation - Include/Exclude Requested Assignments

 
This option determines whether the named resource utilization calculations include or exclude allocations and reserves that are in a Requested status. A default can be set using:
  • util_incl_rqsd=
Possible values are:
  • Y - Include requested allocations and reservations
  • N - Do not Include requested allocations and reservations

 

The default FastTrack configuration for the parameter will:
  • Include requested allocations and reservations
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • util_incl_rqsd=Y
Utilization Metric Calculation - Exclude Non-Utilized Standard Activities planned/reported on a non-working day Standard Activities can be flagged as Utilized or Non-Utilized types. This option allows non-utilized standard activities to be excluded from utilization calculations if the day that they are planned or reported on is a day that is defined as a non-working day on the Resource Calendar.

Use Case Example: Public Holiday standard activity is used to report timesheet hours, and this public holiday day is a non-working day on the resource calendar. This is relevant to customers who enforce minimum reported hours check on timesheets, requiring that non-working days are time reported.
A default can be set using:
  • hide_nusa_on_nwd=
Possible values are:
  • Y - Exclude non-utilized standard activities if they fall on a non-working day.
  • N - Include non-utilized standard activities if they fall on a non-working day.
The default FastTrack configuration for the parameter will:
  • Include non-utilized standard activities if they fall on a non-working day.
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • hide_nusa_on_nwd=N
Respect Work Status Rules for Suppress Assignments By default this report will respect the Suppress Assignments flag on the Work Status Rules, meaning that demand against work items in a Suppress Assignments work status will be excluded from the report. This parameter allows this business rule to be overridden so that the report will display demand for work in any status. A default can be set using:
  • respect_suppress_assign=
Possible values are:
  • Y - Exclude work items where the work status has the rule of suppress assignments for staffing set.
  • N - Include work items where the work status has the rule of suppress assignments for staffing set.
The default FastTrack configuration for the parameter will:
  • Exclude work items where the work status has the rule of suppress assignments for staffing set.
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • respect_suppress_assign=Y
Report Labels These options allow the following effort categorization labels to be modified. This applies only to the categorizations used in the charts. Allows the text label for the following items to be controlled:
  • Capacity = hours available to deliver work
    • Set using: cap_descr=
  • Utilization = total hours assigned to requirements/reserves/allocations
    • Set using: util_descr=
  • Availability = difference between capacity and utilization (available capacity)
    • Set using: avail_descr=
  • Overutilization = amount of assignments (utilization) that exceeds capacity
    • Set using: ovrutil_descr=
The default FastTrack configuration for the parameter will set the titles as:
  • Utilization
  • Capacity
  • Availability
  • Overutilization
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • util_descr=Utilization
  • cap_descr=Capacity
  • avail_descr=Availability
  • ovrutil_descr=Overutilization
Color of Out of Portfolio Demand

 
This parameter allows you to set the color used in the charts for out of portfolio assignments. A default can be set using:
  • color_oop=
Use any Hex code to define the color, see Managing Attribute & Report Colors for more detail
The default FastTrack configuration color is:
  • Amber
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • color_oop=#f1a048
Report Title Configurable report title that appears at the top of the report. The title of the report can be set using:
  • report_title=
If a longer report title is required, then create additional report_title=xxx entries and these will be concatenated together based on the order in which they are listed in the configuration structure. 
The default FastTrack configuration Report Title is set to:
  • Resource Portfolio Supply and Demand
Expressed in the parameter defaults node of the FastTrack Report Configuration Structure as:
  • report_title=Resource Portfolio Supply and Demand

           

           

Additional Information

The selected slicer will determine the colors of the chart stacks by respecting the attributes associated configured charting colors, if no charting colors exist the stacks will assign from default color palette.

           

           

Technical/Database Information

Report (RDL) Location .../Reports/FastTrack/Mixed_Use/EFFORT03-CapacityVsDemand/EFFORT03.rdl
Database This report uses the transactional database and uses the daily tables. Therefore data currency will be dependent, for some assignment types, on a refresh of the daily tables.

Refer to the 