Analytic that is designed to give visibility into the health of data about projects and the effectiveness of adoption of the Planview Portfolios solution. Reports on changes in the value of key work attributes, such as work status, priority, lifecycle stage, investment approval status and plots the number of times an attribute is changed each month.
Business Outcomes
Measurement of the effectiveness of the adoption of the Planview Portfolios solution by monitoring activity in the portfolio management process.
Accurate and timely project data is essential to driving value from the {{PVEOPRM} portfolio management solution.
Supporting Capabilities
Project Planning and Scheduling
User Parameter Configuration (for Administrators)
Parameters
Description
Configuration Options
Default/Example Settings
Attribute to analyze
Analysis time interval
Control available on the time interval for analysis; week, month, quarter, year
breakdown_by=month
Breakdown by
Ability to breakdown returned data by attribute
Any work single select alternate structures that are enabled for history tracking and marked as analyzable
structure_name=Wbs20
Range Start/End
Date range for analysis
Configure a default date range for the data returned.
default_start=x and default_end=y
(where x and y are integers that represent the number of "breakdown by" periods from today.
Example:
default_start=-6
default_end=0
Assuming the breakdown period is one month, the default start date will be six months ago until now (zero will always be interpreted as today).
Configurable report title that appears at the top of the report.
If a longer report title is required, create additional report_title=xxx entries. These will be concatenated together based on the order in which they are listed in the configuration structure.
report_title=Work Attribute change History
Additional Information
The analysis is only made on changes to the attribute value at the project level (PPL).