This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1v either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 7.1v is a maintenance release of ProjectAdvantage 7.1.

In the Core product, 6 enhancements have been implemented, and 16 issues have been fixed.

In the ProjectAdvantage Default Configuration, 3 enhancements have been provided and 41 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the different sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
  • As a reminder we only support SAML SSO since January 2019. Consequently we have removed “Windows SSO” and "CAS SSO" in the Designer in the list of Authentication type in this release. Please refer to #41724 for further information.
  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs : we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Designer

#42041

The deleted states in the Data View workflow can now be mapped to any other state in the Designer. Previously, if a particular state was deleted, then all Data Views in that state would change into initial state. This mapping feature was already available for workflows associated with built-in categories (e.g. Project).

Localization

#42350

Using the Language Packs management workspace the Portuguese language can now be enabled and will then be included in the list of available languages in the HTML5 login dialog. The Portuguese language will not appear in the list of languages in the designer login, we will only support our legacy languages (en,fr, de, es, ja, iw, and pl).

Object Edits (Data Categories)

#41573

The task panel in a Selector will no longer be sorted by task name, instead it will be displayed in a natural order under the following conditions:

  • The Selector options were not controlled by the Designer and are internally generated by the program (specially for Selectors invoked by a hamburger button on a reference field).
  • The task panel was accessed by drilling down through a project panel and only one project was selected in that panel.

#40812

The Performing Organizations, Performing Resources, and Performing Cost Items task fields have a new behavior (along with their Project counterparts). The new field behavior allow a user to build a team of resources that can be assigned to the tasks within the corresponding Work Package or Project and the Work Package teams no longer need to be a subset of the corresponding Project team. For example, if Project.Performing Cost Items was set to: “Lumber, Concrete”, it would be acceptable to set Task.Performing Cost Items to: “Nails, Glue”.

Previously, when editing these task fields (on a Work Package task), there was a requirement that the resulting team had to be a subset of the team specified by the corresponding field at the Project level. For example, if Project.Performing

Organizations was set to: "Sales, Marketing", then the Task.Performing Organizations could only be set to a subset (e.g. "Sales") of the project field's value. Similarly, if Project.Performing Resources was set to: "Bob, Kathy", then Task.Performing Resources could only be set to: "Kathy", but could NOT be set to: "Kathy, David" (because that is not a subset of the project field's value).

Along with this change to the field behavior, there is also a new behavior when it comes to field restrictions. Users are still restricted to creating new assignments where the resource is a member of the team. What has changed, however, is that the defined team is NOT used to restrict existing resource assignments on tasks that become a member of a Project or Work Package due to a “move”. Here are some examples of a “move”:

  • When a task was drag/drop or cut/paste from a Work Package to a Project (or from a Project to a Work Package)
  • When indenting a task such that it becomes a member of a work package
  • When outdenting a work package task such that it is no longer part of that work package
  • When blanking out the work package id on the work package parent such that all of its children no longer belong to a work package

When a task is moved (for example, to a different Work Package) it may fall under a different team definition. In the new behavior, the team definition does not restrict the move operation. For example:

  • Regardless of whether the resources assigned to the “moved” tasks are within the team, those assignments are maintained as is.
Note: Previously, in some cases, they were deleted or turned into soft assignments.
  • The team is not automatically expanded such that the team includes the new resources on the “move” tasks.
Note: Previously, in some cases, the team was automatically expanded.

There are two cases where the team is automatically expanded:

  • If the user modifies one of the team fields such that that team does not include all the resources currently assigned to the corresponding tasks, the user will be given an option to either cancel their entry or to have the program automatically expand the team (to include all the resources assigned).
  • When a project manager approves a resource commitment, that resource will be added to the team if it is not already within the team.

Performance

#42096

In the Designer, entering edit mode for Data Views or Fields was taking several minutes in some cases, particularly if a database contains many organizations and users. The time to enter edit mode has been reduced overall, in some cases by as much as 80%. This has been fixed.

#42095

In the Designer, entering edit mode for Organizations was taking several minutes in some cases, particularly if a database contains many organizations and users. The time to enter edit mode has been reduced overall, in some cases by as much as 80%. This has been fixed.

Core Product Corrected Issues

Built-in HTML5 Client

#42107

ProjectAdvantage Health Check is a feature that is used by our general monitoring systems.

If ProjectAdvantage Health Check feature was performed and some pre-existing conditions were met and data elsewhere in the system were updated at exactly the right moment, the health check would fail with a Null Pointer Exception (NPE) and set off a chain reaction, ultimately resulting in a bad query being sent to the database whenever data view triggers were activated. This issue has been fixed.

Commands

#42325

The Work Package Unlock command displayed a “Cannot successfully unlock the Work Package” error message when the command was invoked and when more than one locked Work Packages were selected. This has been fixed.

#42125

An “Unable to save project:...” log error message (for a save as command in Project Scheduler), did not clearly define the encountered problem. This has been fixed by adding a new more precise log error message.

#42113

Calendar vacation days (where the entire day was non-work) was not properly interpreted by Microsoft Project, which was exported by ProjectAdvantage 7. This has been fixed.

Note that the “Extended Attributes” section should NOT be included when exporting an XML file, that was intended to be imported into Microsoft Project. The section can be “turned off” when defining/editing an XML Export Scenario in the Designer.

#42070

When executing two Print commands at once, the first one to be executed may fail and will show a client-side exception instead (Unexpected Exception error). This has been fixed.

#41463

The Project baseline and Task baseline’s start and finish dates previously used to include dates from the transactions. From now on, the Project baseline and Task baseline’s start and finish dates will no longer include any dates from the transactions they contain.

#41001

Previously, no authorization was required for accessing temporary files if path was known. Temporary files uploaded could be accessed by other users, besides the user uploading the file. This has now been fixed.

Field Edits (Field Types)

#42250

The styles of the switch button (sometimes called “toggle”) were inconsistent across the product. This has been fixed.

#42156

If the storage currency was “As Input” for cost rate data, a conversion from default currency factor was applied when data was displayed. This has been fixed.

Gantt

#42273

If a Work Package was selected and a whole task was copied and then pasted onto the Work Package parent task row, then a new task was created at the project level. This has been fixed. From now on, in a similar case, no task will be created and an error message will be displayed.

Object Edits (Data Categories)

#42317

The Work Package locks processing was not being handled correctly. This resulted in various incorrect behaviors including Work Packages being mysteriously locked when an “Update Permissions” scheduled job run was initiated and the “Task.Locked By” field do not properly reflect the state of the Work Package lock. This has been fixed.

#42310

The “Insert Template” command incorrectly maintained the lock state of the Work Package tasks (if any) within the template and resulted to “Server-side command list execution…” error . This can also lead to other “lock” errors when the target project was saved and reloaded. This has been fixed.

#42309

When a user run Create/Update tables in the Configuration Utility, a “Cannot lock the project. Modification will be ignored” error message appeared, this resulted to projects and work packages were not unlocked during the process (which were needed to be done due to other bugs). This has been fixed.

Scripts/API

#42279

A “java.lang.NoSuchMethodException: com.sciforma.psnext.servlet.ServletReqProcessor..getRecords()” error was encountered when using “AbstractionSession.getDataViewRowMap(String dataViewName, List<FieldAccessor>

fieldAccessors)” in an API program. This has been fixed.

UI Blocks

#41103

An "Unexpected Exception. Widget not a child of this panel" error was encountered by the user, when a form cell was added to a Text Block and that form contained a Grid block. This has been fixed.

#32798

The Gantt Bars option "Use child styles (instead of parent) when displaying parent bar" was not working, wherein the parent bar was always displayed using the parent style. This has been fixed.

Default Configuration Enhancements

Work Management Redesign (Phase 1)

More recently, Work Management has also taken an important role in Project Management processes, as it may help reduce the complexity of planning and help streamline communication and execution within a team.

With this release, we want to develop bridges across those two universes along with helping teams struggling to close the gap between Waterfall and Agile. We call it “Hybrid Scheduling”.

This update focuses on offering a better user experience, improving the integration of the Work Items features across the Default Configuration and completing capabilities and functionalities such as:

  • Developing the concept of Hybrid Scheduling (integration of Work Items into the Gantt and Agile worlds)
  • Extending the Connections functionalities across the Work Objects
Note: Additional Work Management improvements along with Risk Management features redesign are planned for the next releases.

Tickets that have been resolved with the Work Items Redesign

Jira Ticket #Description
MW-3556Provide a Committed Date field for the Deliverables.
MW-3305Provide the ability to schedule a Deliverable according to its related Task.
MW-3303Prevent Team Members from creating or deleting Work Items.
MW-3119Provide the URL Link field for Issues and Change Requests.
MW-2887Provide the "Phases & Gates" filters in the Filters popup of the Deliverable Kanban.
MW-2885Provide the Estimated Date, Priority, and Owner fields when creating a new Deliverable.
MW-2572Provide more possible connections between the Work Objects.
MW-2239Provide the ability to know who created a Work Item from the Execution Work Items workspace.
MW-1940Provide the ability to link Attachments to a Task or a Deliverable.
MW-1921Provide the ability to attach Documents to Deliverables.
Note: This enhancement has been implemented for Attachments.
MW-1783Provide the ability to Print the Work Item Briefs.
MW-1743Trigger automatic email notifications to the user when a Work Item has been assigned to him/her.
MW-1681Provide a visual hint that there are Connections for Work Items
MW-1680Provide an automatic numbering for Work Items.
MW-1569Provide the ability to manage multiple Types & Workflows for all the Work Items.
MW-1380Provide the ability to manage a list of Actions for each Deliverable.
MW-1368Provide the ability to manage Types for Change Requests.
MW-966Provide the ability to select a project when creating a Work Item when in multi-project selection.
MW-702Provide the ability to set a Work Item Type as inactive.
MW-602Add the Notes indicator in the Work Item Kanban cards.
MW-119Provide an indication of the Actions connected items.

Project

#MW-3986

In the Project* Scheduler workspace, Planner tab, the Resource problems formula has been enhanced for better performances when no task is selected in the Gantt spreadsheet in multi-project selection.

Portfolio

#MW-3879

In the Master Planning workspace, when inserting a Task by using the Gantt toolbar "Insert Task(s)" command, the newly created Task name will now use the following format: "Task Name (Project Name)".

Note: Previously only the Task name was displayed.

#MW-3876

In the Master Planning workspace, upon creating a new Master Planning, the Portfolio Folder field will no longer be mandatory, even if the corresponding “Enable Portfolio Folder Verification” setting has been enabled for the Projects*. In addition, the Portfolio Ranking and Portfolio Simulation workspaces will now exclude by default the projects identified as Master Planning.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Project Creation Options tab, Field Options section.

Default Configuration Corrected Issues

Project*

#MW-4046

Throughout the Solution, when the user edited a field in a grid, the field content was not centred. This issue has been fixed.

#MW-4017

In the Project Health Score, the “Overallocations (Next 10 Days)” Resource problem was not taken into account properly. This issue has been fixed.

#MW-3975

In the Project* Scheduler, when the user was logged-in into another language than English, an error message was displayed when selecting the Agile tab, preventing the user from accessing it. This issue has been fixed.

#MW-3907

In the Project* Scheduler workspace, Agile tab, Edit Backlog Item dialog box (accessible upon clicking on the Key of a Backlog Item card), when converting a Checklist Item into a Backlog Item, an error occurred in languages other than English. This issue has been fixed.

#MW-3906

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Project side panel, Agile Synchronization problems view, an error occurred when users tried to update the dates of a parent task from an Agile object (Iteration, Release, or Epic). This issue has been fixed; from now on, a flash message will be prompted, indicating that the operation is not possible.

Note: The modification has also been provided for the Project* Scheduler workspace, Agile Tracking tab (available for legacy purposes).

#MW-3905

In the Project* Scheduler workspace, Planner tab, Task side panel, Agile tab, scrollbars could be displayed in the empty state messages, depending on the session's language. This issue has been fixed.

#MW-3899

In the Project* Center workspace, Contracts tab, the Budget section did not display the allocated budget of the Parent connection when the "Enable Mixed Budget Type" setting was activated. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Budget/Finance Settings folder.

#MW-3898

In the Project* Center workspace, Connections tab, when deleting a child connection, two Confirmation message popups were displayed instead of one. This issue has been fixed.

#MW-3897

In the Project* Dashboards workspace, Budget report, the "Significantly Under Target" indicator of the “Cost Preferences” and “Resource Utilization Preferences” colored indicators was still displayed when the corresponding setting was deactivated. This issue has been fixed.

Note: The same issue was encountered and fixed for the colored indicators in the Project* Finance workspace, Budget tab, and Work Packages view mode.

#MW-3896

In the Project* Center workspace, Work Packages tab, Work Package Budget dialog box (accessible upon clicking on the Budget column for a Work Package), the list of available Cost Centers displayed while creating a new Direct Budget entry did not take into account the "Enable Mixed Budget Type" setting. This issue has been fixed.

Note: The setting aforementioned is available in the System Settings workspace, Budget/Finance Settings folder.

#MW-3895

In the Project* Finance workspace, Budget tab, the Legend popup did not reflect the options selected for the "Enable Mixed Budget Type" and "Set Budget Type" settings. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Budget/Finance Settings folder.

#MW-3894

In the Project* Finance workspace, Budget tab, Cost Centers Overview popup (accessible upon clicking on the "Some elements are not related to a Cost Center" warning message), the list of Cost Centers displayed did not take into account the "Enable Mixed Budget Type" setting. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Budget/Finance Settings folder.

#MW-3887

In the Project* Center workspace, Definition tab, Stakeholders section, inactive users were available for selection in the User-related fields (Manager 1, Manager 2, Manager 3, Users Readers, and Users Writers). This issue has been fixed.

#MW-3883

In the Project* Scheduler workspace, Roadmap tab, Gate Review view mode, when creating a new Gate review, the header of the right-hand side of the view could display a vertical scrollbar when in small resolution. This issue has been fixed.

#MW-3875

In the Project* Health Score, the Quality Score (which is a sub-component of the Health Score), was still including the Work Objects-related values when the "Include Work Objects in Quality Score calculation" setting was deactivated. This issue has been fixed.

Note: The setting aforementioned is available in the System Settings workspace, Project Settings folder, Global options tab, Miscellaneous sub-tab.

#MW-3871

In the Project* Center workspace, Connections tab, a new task with a dependency was inserted into the source project when creating a new connection while choosing the "Connect to Project" option. This issue has been fixed.

Note: A new "Enable Dependency Creation" setting has been added in the System Settings workspace, Project Settings folder, Global Options tab, Connections sub-tab for administrators to choose whether a dependency should be created upon creating a connection or not.

#MW-3854

In the Project* Scheduler workspace, Planner tab, in the Gantt Filters dialog box, using the "Problems" section's filtering options had no effect. This issue has been fixed.

#MW-3846

In the Project* Scheduler workspace, Planner tab, in the Gantt Filters dialog box, the Custom section, when enabled, was not properly located. This issue has been fixed.

#MW-3840

In the Project* Scheduler workspace, Status Reports tab, the "New Report" and "Submit Report" buttons were available when a project was in read-only access or not editable. This issue has been fixed.

#MW-3833

In the Project* Center workspace, Dependencies tab, a link to the dependent object (Target or Source) was not provided anymore. This issue has been fixed.

Note: In order to stick to the new design of the solution, a Gear (1-50_img_0.png) icon is now available in the Inbound Dependencies and Outbound Dependencies view modes, allowing the user to access the corresponding Full Screen popups or Briefs.

#MW-3827

In the Project* Scheduler workspace, Roadmap tab, the "OTD Baseline Start" and "OTD Baseline Finish" fields did not take into account the "Use Current Baseline" setting when the "Enable Project OTD Baseline Selection" was deactivated. This issue has been fixed.

Note: The settings aforementioned are available in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Scheduler - Roadmap section.

#MW-3825

In the Project* Dashboards workspace, when selecting the Budget report with the Report Launcher setting activated, the "Finish" date under the Time Distribution section did not correctly reflect the interval and number of intervals selected. This issue has been fixed.

#MW-3821

In the Project* Dashboards workspace, Baseline Comparison report, the "Reference Baseline" and "Compared To" fields could be missing under certain conditions. This issue has been fixed.

#MW-3817

In the Project* Brief dialog box, in some cases, the Work Objects folder was not displayed while it should have. This issue has been fixed.

#MW-3812

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when zooming to the "Hour" interval, the Gantt chart was compressed making it impossible to read the columns values. This issue has been fixed.

#MW-3805

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Project side panel, Agile Synchronization problems view, an error occurred when users tried to connect an Agile object (Iteration, Release, or Epic) to a Task with completion. This issue has been fixed; from now on, a flash message will be prompted, indicating that the operation is not possible.

Note: The modification has also been provided for the Project* Scheduler workspace, Agile Tracking tab (available for legacy purposes).

#MW-3804

In the Master Planning workspace, when creating a new master planning, the Next button of the Create a new Master Planning popup could remain inactive (grey), even if every mandatory fields were filled in. This issue has been fixed.

#MW-3777

In the Project* Scheduler workspace, Resources tab, Resource Utilization Overview view mode, when exporting the spreadsheet to excel, data cells of a non-uniform assignment were greyed out with a white font making it difficult to read. This issue has been fixed.

#MW-3775

When creating a Project from a template, the "Import Connections" and "Import Dependencies" options were provided even if the selected Template did not support the connections or dependencies features. This issue has been fixed.

#MW-3770

In the Project* Scheduler, Agile tab, Full Backlog full screen view, the sort by Story Points option was not sorting the spreadsheet correctly. This issue has been fixed.

#MW-3683

In the Idea Center workspace, Details view mode, Idea Details view, Connections sub-tab, the "Relation" chip colors did not correspond to the related project's Nature. This issue has been fixed.

Note: The chip colors of the Idea Details dialog box have been updated as well.

#MW-3198

In the Project* Scheduler workspace, Cost Items tab, Overview view mode, when using the option "With Units in period", all assignments including from Other Published Projects were considered as opposed to only the selected Projects. This issue has been fixed.

Resource

#MW-3891

In the Resource Dashboards workspace, Resource Utilization report, the Forecast Effort was still displayed in the chart when the setting "Enable Organization Center Capacity Forecast" was deactivated. This issue has been fixed.

#MW-3858

In the Resource Dashboards workspace, Resource Capacity report, Filters popup, the option "Hide Inactive Resources" did not have any effect on the list of resources available in the Resources field. This issue has been fixed.

Portfolio

#MW-3978

In the Portfolio Work Management workspace, Project Monitoring tab, the Sort By display option did not take into account the Health Score. This issue has been fixed.

#MW-3911

In the Master Planning workspace, in multi-project selection, when no task was selected, the "Health Score" sorting option did not work as expected. This issue has been fixed.

#MW-3862

In the Master Planning workspace, the Data selector initially displayed a list of projects if a portfolio folder was previously selected from another Portfolio workspace. This issue has been fixed.

#MW-3831

In the Portfolio Ranking workspace, Budget view mode, the budget row of the spreadsheet did not correctly reflect the budget as set in the Portfolio Center workspace, Budget tab. This issue has been fixed.

#MW-3818

In the Portfolio Center workspace, Project Supervision tab, the Baseline field was available in the main toolbar while it should not have. This issue has been fixed.

#MW-3774

In the Portfolio Dashboards workspace, Phases & Gates report, Supervision view mode, the new Health Score was not provided in the spreadsheet as it should have been. This issue has been fixed.

#MW-3764

In the Portfolio Dashboards workspace, Roadmap report, the "Workflow State" filter (accessible upon clicking on the Enable Filters button) did not work. This issue has been fixed.