7.1w
This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1w either in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 7.1w is a maintenance release of ProjectAdvantage 7.1.
In the Core product, 1 enhancement has been implemented, and 13 issues have been fixed.
In the ProjectAdvantage Default Configuration, 14 enhancements have been provided and 52 issues have been fixed.
Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.
In order to access to the different sections, please click on the following links:
Important Reminders for upgrade
Default Configuration Enhancements
Default Configuration Corrected Issues
Important Reminders for upgrade
- Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
- As a reminder we only support SAML SSO since January 2019. Consequently we have removed “Windows SSO” and "CAS SSO" in the Designer in the list of Authentication type in this release. Please refer to #41724 for further information.
- Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs : we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
Core Product Enhancements
Performance
#25441
The ProjectAdvantage Java API suffered from performance issues with a secure connection over SSL, wherein a new TCP connection is established with every server request (in spite of HTTP/1.1 Keep-Alive) which is meant to keep TCP connections open for reuse until the keep-alive timeout is reached. This issue has been fixed so the performance on API programs is improved, especially where the latency between client and server is higher, given that the SSL overhead is now greatly reduced and avoids additional round trips to the server to negotiate an SSL connection on every request.
Core Product Corrected Issues
Commands
#41726
Some records were being indented too far when indenting multiple Data View records. This has been fixed. It is now working with both selecting individual items and using shift+click to select multiple items at once.
Config Utility / Installation
#42348
A IndexOutOfBoundsException was encountered which resulted in, unable to update database from 7.0z to 7.1u. This can occur when there was a Project based Data View that had no internal ID or external ID associations. This has now been fixed.
Designer
#42355
An unexpected error occurred when importing a form from cfg that had a command panel with a Create command. This has been fixed.
#41781
In the Insert Template Project command, there were parameters available in order to bypass the use of the built-in dialog. One parameter was the “Insert Before Task” filter, which was evaluated against every task (in the currently selected project) until a task that passes the filter's requirements is found and then the Template project is inserted before that matching task.
However, because this filter was restricted to the [GLOBAL] context, evaluating any of these filters against individual tasks in a project never returned any matching tasks, due to the [GLOBAL] nature of the filter. This has been fixed.
The filter will now be defined using the [TASK] reference category. This also means that any existing filters defined under the old [GLOBAL] context will now no longer be valid and will be nullified.
Field Edits (Field Types)
#42234
In the Language Packs workspace, the switch button was either misaligned or not visible when logged in with RTL (Right To Left) languages. This has been fixed.
Localization
#42331
When multiple domains were set on an environment (e.g. external dataviews), a wrong initialization of Language Packs could have generated melting languages while navigating throughout ProjectAdvantage. This has been fixed
#42179
There was a problem where the HTML5 client was not always getting the correct locale information for date and time formats (including the correct strings for month names), when the customer was logging in with Hebrew as the selected language. This has been fixed.
Object Edits (Data Categories)
#42329
In a load-balanced environment, modifications to a data view record on one client (being served by a particular server) sometimes would not be properly reflected on another client (being served by a different server). This problem was somewhat rare and appeared to occur randomly. This has been fixed.
Performance
#42351
Server startup time was sensitive to the number of scheduled jobs in the database. This has been fixed so that loading these items from the database no longer happens in the startup thread.
Printing
#42397
There was a problem where under certain circumstances, the incorrect block could be printed. This has been fixed.
Scripts/API
#42349
A failure occurred when publishing certain projects using the API (with a NullPointerException). This would happen if the Project permissions referenced a UDF (User Defined Field) with a default formula containing certain field types. This has been fixed.
UI Blocks
#42413
The change made in 7.1u (#41161) had an impact on custom reports using custom
start and finish dates. It has been decided to revert back to the previous behavior when it comes to how the partial intervals were handled.
For example, if the time period interval scale is "Month" and the specified start date is 15-April-2019, the time-distributed cells is starting on the specified date of 15-April. In this case the first time-distributed cell only contains half a month's worth of data (from 15-April through 30-April)
#42282
When multiple users were simultaneously accessing the Workflow State field for a particular data view, the results were sometimes erratic. Specifically, formulas that used the Workflow State field might have become invalid. This has been fixed.
Default Configuration Enhancements
Project*
#MW-4165
The Health Score formulas have been optimized.
#MW-4143
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, the “My Tasks” (
) option has been added to the Filters dialog box and the Filters panel of the Gantt chart, allowing the logged-in user to only display the Tasks to which he/she is assigned.
#MW-4079
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Task panel, Assignments tab, the Hard Assignment card now features the Organization of the assigned Resource underneath its name. Also, it is now possible to allow any assignment to be non-uniform.
#MW-3990
In all the Gantt views across the Solution, the Buffer Incursion will now be displayed in the graphic panel of the Gantt when relevant.
#MW-3957
In the Project* Scheduler workspace, Agile tab, Backlog Item dialog box, it is now possible to attach a Backlog Item to an Iteration from another project.
Important: This feature is only available if the Backlog Item is not already attached to an Iteration.
#MW-3870
In the Project* Scheduler workspace, Status Reports tab, upon accessing the Status Reports History dialog box, the user can now create a Status Report from a previous one upon clicking on the Copy (
) button.
#MW-3869
In the Project* Scheduler workspace, Status Reports tab, the user can now select whether to create a Status Report from blank, or from the previously submitted report (if any).
Portfolio
#MW-3878
In the Portfolio Dashboards workspace, Status Overview report, the project cards have been updated to provide access to the Status Report History dialog box through the corresponding button (
).
Note: The update has also been implemented in the Project Status Overview reports of the Product/Program Consolidation Dashboards.
Resource
#MW-3935
In the Resource Dashboards workspace, the new Work Items report now allows the user to review the Work Items assigned to the resources of the selected Organizations.
#MW-2256
In the Resource Dashboards workspace, Time Tracking Statistics report, the following changes have been made:
- The sub-tabs have been replaced by view modes
- The Time Tracking by Project and Time Tracking by Resource sub-tabs have been merged into one Time Tracking Analytics view mode, in which data can now be grouped by Project, Resource, and Date
- The new Time Tracking Details view mode allows the user to review the details of the Timesheets and easily print them out.
Execution
#MW-3866
In the Overview and Timesheet workspaces, views have been updated to display clearer empty states when the user who attempts to use those workspaces is not declared as a Resource in the system.
#MW-3822
In the Timesheet workspace and in the Resource Validation workspace, Timesheets tab, Details view mode, the Task Name is now displayed by a formula called "Overwritable Name". It is meant to make it easy to customize what is displayed to identify the Task. For example, an Overwrite could be created to show the Task ID along with its Name.
#MW-3819
In the Timesheet workspace and in the Resource Validation workspace, Timesheets tab, when the "Enable Timesheet Corrections" setting is active, users will now have the possibility to hide temporarily the lines showing the Corrections.
Work Management
#MW-4056
In the Project* Work Management workspace, Dashboards full screen view, Deliverables tab, the Estimated vs Completed view mode has been added. It offers a time-distributed and cumulative view of the number of Estimated and Completed Deliverables over the duration of the project.
Default Configuration Corrected Issues
Project*
#MW-4163
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when using the Insert Template (
) command available in the Gantt toolbar, the Template Deliverables were not inserted in the project as they should have. This issue has been fixed.
#MW-4162
In the Project* Center workspace, Contracts tab, it was not possible to associate a Deliverable to the Contract. This issue has been fixed.
#MW-4127
In the Project* Scheduler workspace, Agile tab, Backlog Item dialog box, Comments section, a Comment created by another user could be edited or deleted by the Logged-in User. This issue has been fixed; from now on, the Edit and Delete commands will only be available for comments created by the Logged-in User.
#MW-4074
In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, when moving a Backlog Item from one project to another, the Backlog Item Key was not updated, nor incremented. This issue has been fixed.
#MW-4069
In the Template Scheduler workspace, Planner tab, Scheduler view mode, Gantt Task side panel, Work Objects tab, the Issues, Actions, and Change Requests cards were displayed while they should not have. This issue has been fixed.
#MW-4064
In the Project* Scheduler workspace, Status Reports tab, when submitting a new Status Report with a constant Trend indicator, the project Health Score was reduced. This issue has been fixed.
#MW-4060
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when selecting a CCPM project, if the Gantt side panel was closed, the Gantt spreadsheet did not display the required columns for Critical Chain scheduling. This issue has been fixed.
#MW-4059
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when selecting a CCPM project, in the Filters dialog box, the Critical Chain filters were not properly located. This issue has been fixed.
#MW-4040
In the Project * Finance workspace, Budget tab, Details view mode, the "Update From Total Cost" command could load for a vast amount of time. This issue has been fixed.
Note: All the "Update from Total Cost", "Update from Total Effort", and "Update from Forecast" commands have been optimized.
#MW-4033
In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, when selecting a Backlog Item in the spreadsheet (i.e., the corresponding checkbox is ticked) and then creating a new Backlog Item, the Backlog Item dialog box fields were already filled with the previously selected Backlog Item attributes. Furthermore, when canceling the creation, the attributes of the selected item were erased. This issue has been fixed.
#MW-4027
In the project Health Score Details popup, Cost Score section, the "Billing" label was wrapped in German. This issue has been fixed.
#MW-4021
In the Project* Brief dialog box, the Connections folder was not available if the project was only connected to an Idea. This issue has been fixed.
#MW-4016
In the Project* Brief dialog box, Connections folder, the name of the Manager of a connected Project could wrap when too long. This issue has been fixed
#MW-4012
In the Idea Center workspace, Details view mode, Connections sub-tab, it was not possible to connect an Idea to a project whose Nature was Business Case. This issue has been fixed.
#MW-4003
In the Project* Center workspace, Connections tab, the Workflow State chip was not adapted for long strings. This issue has been fixed.
#MW-4002
In the Project* Scheduler workspace, Status Reports tab, Status Report Preferences dialog box, Project Attributes sub-tab, the switch buttons were not aligned. This issue has been fixed.
#MW-3999
In the Business Case Dashboards workspace, Evaluation report, it was possible to display a selector popup when clicking on the value of a Scoring Criteria. This issue has been fixed.
#MW-3989
In the Project* Scheduler workspace, Agile tab, Iteration Details full screen view, Iteration Details panel, Team section, Edit Team Member Information popup (available upon clicking on the More (
) icon and selecting the Edit command) when modifying the Default Assignment Rate, the value was reset to 8h/d each time the popup was reopened. This issue has been fixed.
#MW-3973
In the Project* Brief dialog box, Work Objects folder, the displayed information was not up to date regarding the latest Work Management enhancements. This issue has been fixed; the following changes have been implemented:
- "Detailed Table" buttons have been renamed "Details" (since they do not allow to display spreadsheets anymore)
- "List" sub-tabs have been removed from the Deliverables and Risks popups (for consistency)
- In the Deliverables popup, Owner has been replaced by Assignee
#MW-3970
In the Project* Scheduler workspace, Agile tab, Structure full screen view, Teams tab, Team Details view, when clicking on the Name cell's hamburger (
) icon, the prompted User list did not reflect the Project Team. This issue has been fixed.
#MW-3969
In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, if the "Notes" field was added to the spreadsheet, the active "Note" icon was always displaying a red dot (
). This issue has been fixed; the dot will no longer appear as there is no more notion of Read/Unread.
#MW-3968
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Agile Synchronization problems side panel, the "Iteration is not marked as completed" exception message was missing if a completed task was connected to an Iteration whose Workflow State was "Started". This issue has been fixed.
#MW-3962
In the Template Scheduler workspace, Planner tab, Scheduler view mode, some options available when clicking on the Task Gear icon did not make sense for Template project tasks. This issue has been fixed.
#MW-3961
In the Project * Finance workspace, Costs tab, Forecast view mode, the "Update From Total Cost" command could load for a vast amount of time. This issue has been fixed.
Note: All the "Update from Total Cost" and "Update from Total Effort" commands have been optimized.
#MW-3926
In the Project* Center workspace, Create New Project popup, when choosing the “Upload XML” option, the popup did not close after the upload and nothing indicated that the project was created. This issue has been fixed.
#MW-3923
In the Project* Scheduler workspace, Agile tab, Backlog Item dialog box, the Actual Effort was not editable when the "Enable Agile Activity Log" setting was deactivated. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Agile Settings folder, Global Options tab, Time Tracking Options section.
#MW-3754
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, upon clicking on the Gantt selection button (
) and choosing another Gantt in the displayed popup, some refreshing issues could occur. This issue has been fixed.
Resource
#MW-4059
In the Organization Center workspace, Resource Details tab, the wrong tooltip was displayed for the Search (
) option. This issue has been fixed.
#MW-3950
In the Organization Center workspace, Resource Details tab, the "Charts" (
) display option did not activate a chart inside the Identification sub-tab. This issue has been fixed.
#MW-3900
In the Resource Commitments workspace, a Resource Request with a “PM Rejected” status could not be submitted, even if some Committed Effort was already entered. This issue has been fixed.
Portfolio
#MW-4039
In the Portfolio Simulation workspace, after playing a Scenario, in the Simulation view mode, Charts section, Budget folder, the Budget series did not reflect the Budget updates made in the Portfolio Center workspace, Budget tab. This issue has been fixed.
#MW-4022
In the Portfolio Ranking workspace, Business Case Brief dialog box, the Overview folder did not give access to the detailed scoring, nor the description of the evaluation. This issue has been fixed.
#MW-4006
In the Master Planning workspace, it was possible to create new tasks by using the last row of the spreadsheet or the "Add More Tasks" button. This issue has been fixed.
#MW-3959
In the Portfolio Dashboards workspace, Controlling report, Overview view mode, when activating the "Cost Center" (
) display option, the selected Portfolio Folder Cost and Budget rows were no longer fixed to the top of the spreadsheet, which made them disappear when scrolling down. This issue has been fixed.
#MW-3958
In the Portfolio Dashboards workspace, Controlling report, Overview view mode, when activating the "Cost Center" (
) display option, some colored indicators would no longer display the corresponding tooltip. This issue has been fixed.
#MW-3496
In the Portfolio Dashboards workspace, Controlling report, the Total Cost values were duplicated at each cost center loop when the "Cost Center" (
) display option was activated. This issue has been fixed.
Work Package
#MW-4082
In the Work Package Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Task side panel, Work Objects tab, upon accessing a Work Item category full screen view, the full screen view of another Task than the one selected in the Gantt chart could be displayed. This issue has been fixed.
#MW-4081
In the Work Package Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Task side panel, Work Objects tab, closing a Work Item category full screen view led the user back to the Project Scheduler workspace. This issue has been fixed.
#MW-3934
In the Work Package Scheduler workspace, Resources and Cost Items tabs, the "Lock" and "Unlock" commands were available in the main toolbar while they should not have. This issue has been fixed.
#MW-1473
In the Work Package Center workspace, Contract tab, Contract Changes view mode, Cost card, when clicking on the Cost Center Edit (
) button, the prompted list allowed the user to select a project Task rather than providing directly the list of the selected Work Package’s Cost Centers. This issue has been fixed.
Execution
#MW-4062
In the Timesheet workspace, Activity Logs section, the following behaviors could be encountered:
- The “Display Activity Logs” option was not displayed when it should have (depending on a certain combination of Settings)
- When using the Legacy Agile feature, the Agile Activity Logs were always displayed, even if the corresponding option was deactivated.
These issues have been fixed.
Work Management
#MW-4086
In the Project* Work Management workspace, Work Items full screen view, Board tab, when several Workflows were available for the selected Work Item category, selecting a Workflow in the corresponding pick-list did not automatically refresh the Board. This issue has been fixed.
#MW-4085
In the Project* Work Management workspace, Work Items full screen view, Board tab, when several Workflows were available for the selected Work Item category, the empty states could display a scrollbar. This issue has been fixed.
#MW-4084
In the Project* Work Management workspace, Action dialog box, Connections section, the connections to Backlog Items were not working as expected. This issue has been fixed.
#MW-4083
In the Project* Work Management workspace, Action dialog box, Connections section, inaccurate commands were available. This issue has been fixed.
#MW-4041
In the Project* Work Management workspace, Work Items tab, when multiple projects were selected and no item matched the active filtering options, the wrong empty state message was displayed. This issue has been fixed.
#MW-4037
In the Project* Work Management workspace, Work Items tab, Work Items full screen view (for all the Work Item categories), Inbox tab, when using the "Type" grouping option and then modifying the Type of a Work Item, the Work Items list was not updated accordingly. This issue has been fixed.
#MW-4030
In the Project* Work Management workspace, Work Items tab, Work Item dialog box (for all categories), when an item was connected to another existing item, it was not possible to distinguish the child from the parent items. This issue has been fixed.
#MW-4028
In the Project* Work Management workspace, Work Items tab, Work Item full screen view, the Cycle Time indicator (located in the left panel) displayed a one-day value even if the items were closed in less than a day. This issue has been fixed.
#MW-4018
In the Project* Work Management workspace, Dashboards full screen view, Issues tab, Overview view mode, the “Issues by Project” chart did not make sense in a mono-project selection context. This issue has been fixed.
Note: The same correction has been implemented for the Portfolio Work Management workspace, Dashboards full screen view, Issues tab, Overview view mode.
Administration
#MW-4174
In the System Settings workspace, when logged in Hebrew, the switch buttons were not aligned. This issue has been fixed.
#MW-3971
In the Project Administration workspace, when creating a new project, the "Next" or "Create" buttons could not be accessible under certain combinations of settings located under the System Settings workspace, Project Settings folder, Project Creation Options tab, Type Options section. This issue has been fixed.