7.1u

This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1u either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 7.1u is a maintenance release of ProjectAdvantage 7.1.

In the Core product, 2 enhancements have been implemented, and 14 issues have been fixed.

In the ProjectAdvantage Default Configuration, 8 enhancements have been provided and 28 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the different sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
  • As a reminder we only support SAML SSO since January 2019. Consequently we have removed "Windows SSO" and "CAS SSO" in the Designer in the list of Authentication type in this release. Please refer to #41724 for further information.
  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs : we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Built-in HTML5 Client

#41966

The installed ProjectAdvantage collections and their respective versions are now listed on the HTML5 Client’s About tab under Collections property name.

Commands

#41186

Selections made via workspace selectors will now be reflected in the browser's address bar. These new URLs can be used to navigate to the same workspace and apply a selection. The new information URL will only reflect a single selection at the lowest level of the selector. This means that for multi-select selectors, only the last selected item will be reflected in the URL. Moreover, when these URLs are used to navigate, only the last selection will be applied.

Core Product Corrected Issues

Built-in HTML5 Client

#41090

There were broad inconsistencies in the display and layout of the Level Resources built-in dialog among browsers (Chrome, Firefox, IE, and Edge), where some parts of the dialog were not visible on some browsers. This has been fixed and the overall layout was now more consistent across the four browsers.

Commands

#42223

File import size was previously limited to 10MB, preventing the import for larger XML files. This has now been fixed. This limitation is no longer applicable for XML files.

#41896

When a command took longer than 5 minutes to run and attempted to save project data (after the first 5 minutes of the command operation), the command failed because the saving of the project data failed (internal session timeout). This has been fixed.

#41012

Following previous release, blacklisted files (#40148) could still be uploaded by changing the file extension. Magic bytes or MIME types (Multipurpose Internet Mail Extension) can now be detected. If there is a mismatch between the file extension and the Magic bytes, the file will not be uploaded. The Magic bytes file type includes: com, dll, dmg, emf, eps, exe, lnk, msi, msp, pif, ps, reg, scf, scr, sys, wmf, and wsf. This has been fixed.

Designer

#42148

When a filter was edited (which used Global reference fields) and was displayed in the “Row Entry” tab in the “Edit Filter” dialog, the “Value” column became blank in place of having proper text or values for those Global reference fields (which made it very difficult to edit this type of filter). This has been fixed.

#42050

A “NullPointerException” error can occur when opening Tools > Options in the Designer. The cause of the “NullPointerException” error was a null header or footer preference. This has now been fixed.

Field Edits (Field Types)

#41689

When a user edited URL link fields in the HTML5 client, links were not taken into account whereas they should have been. This issue has been fixed. Now, if a user edits a URL field in the HTML5 client and immediately clicks the arrow button, this will now save the edit before opening the URL.

Object Edits (Data Categories)

#42166

From 7.1q to 7.1t, the load balanced properties were not loaded properly, preventing the user defined categories cache to work between servers in the same cluster. This has been fixed.

Performance

#42171

Some workspaces that gathered a lot of data from tasks or assignments with an Organization, Resource, or Cost were much slower than they were in 7.1q. This has been fixed.

#42149

Memory leaks related to workflows, view preferences, cost items, and task predecessor # field has been found. This has been fixed.

UI Blocks

#42188

The database was not properly updated after the Organization, Job Classification, or Skills on a Resource was changed. This failure caused certain workspaces to display the wrong data. The failure was most obvious after a server restart on the client’s server, that was being served by a different server in a load balanced configuration. This has been fixed.

#41881

The picture was not being cleared from the HTML even after clearing the Assignee. This has been fixed.

#41561

When an Org was selected, it was not always causing the grid to be populated with the proper tasks, if there was an Org selector on the left and a Task-loop-based Grid in the middle of the workspace. This has been fixed.

#41161

Time-distributed cells in Text Blocks were not properly adjusting the start and finish dates based upon the time interval and the calendar.

For example, if the time period interval scale was “Month” and the specified start date was 15-April-2019, the time-distributed cells were starting on the specified date of 15-April rather than 1-April (which made much more sense when the scale is “Month”). In this case, the first time-distributed cell only contained a half month’s worth of data (from 15-April through 30-April), which was very confusing. Similarly, if the specified finish date was 18-Sep-2019, the last time-distributed cell would only contained a half month’s worth of data (from 1-Sep to 18-Sep). Clearly, in this case, the finish date needs to be adjusted forward to the end of the month (30-Sep).

If the start date specified was on a non-work period, then the start date was advanced to the next work period (in the associated calendar). For example, if the specified start date was 13-April-2019 (which was a Saturday) and the associated calendar had a Mon-Fri workweek, then the effective start date will be 15-April-2019 (which was the first work day after 13-April-2019). This has been fixed.

Default Configuration Enhancements

Project*

#MW-3544

In the Project* Scheduler workspace, Billing tab, when a Purchase Order is attached to a Task, the Billable Amount is now computed as follows:

  • If there are some Billing Rates defined at the Purchase Order level, then those Billing Rates are taken into account
  • If there are no Billing Rates defined at the Purchase Order level, then the Revenue Rate Source defined at the Project level will be taken into account

#MW-3543

In the project Advanced Attributes dialog box, Billing folder, the “Global.Project” option has been added to the "Revenue Rate Source" field, allowing the Project Manager to select a specific Revenue Rate at the project level.

#MW-3484

In the Project Scheduler workspace, Planner tab, Task Utilization view mode, the Filters popup now provides additional options for the user to decide the hierarchical level to take into account when filtering Organizations and Job Classifications.

#MW-3258

In the project Advanced Attributes popup, Dependencies folder, when the selected project is using the Critical Chain methodology, the new "Dependency Date Base" field is available to define which Start and Finish dates should be taken into account when another project creates a dependency with the selected project. By default (field empty), the Start and Finish dates will be considered. As soon as a Baseline is selected as Dependency Date Base, the corresponding Baseline Start and Finish dates (both at Project and Task levels) will be synchronized with the target projects of the dependencies.

Resource

#MW-3939 – Added on 04/10/19

In the Resource Validation workspace, the formulas to display Timesheets have been enhanced.

#MW-1448

In the Resource Validation workspace, Timesheets and Calendars tab, the Inactive Resources will now be hidden by default. A new Display Option has been added to temporarily display the Inactive Resources.

Administration

#MW-3557

In the System Settings workspace, Project Settings folder, Status Report Options tab, Global Options sub-tab, the "Enable Status Report Deletion" setting has been added to allow the Administrator to decide who is able to Delete Status Reports in the Status Report History dialog box.

#MW-3132

In the System Data workspace, News Page tab, General folder, General section, the new "Background Picture" option is available for customers who want to upload their own custom picture for the News Page background.

Note: This option replaces the previous one called "Enable Picture Background".

Execution

#MW-3746

In the Timesheet workspace, when using the “Add Assignment” command, it is now possible for the user to select several tasks from multiple paths at the same time.

Default Configuration Corrected Issues

Project*

#MW-3835

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt side panel, when no Task was selected, the Total Cost of the Project could wrap on two lines when greater than six digits. This issue has been fixed.

#MW-3823

In the Health Score Details pop-up, Time Score section, the Deadline Gap label was displayed even if no Deadline had been entered for the project. This issue has been fixed.

#MW-3786

In the Project* Scheduler workspace, Planner tab, Project side panel, the Health Score of the selected Project was not accurate if the “Enable Task Not Closed Problem” or “Enable Baseline-related Problems” options were disabled. This issue has been fixed.

Note: The settings aforementioned are available in the System Settings workspace, Project Settings folder, Display Preferences tab.

#MW-3784

In the Project Scheduler workspace, Resources tab, the Replace command was available for Soft Assignments instead of the Fulfill command. This issue has been fixed.

#MW-3757

In the Project* Center workspace, Connections tab, the label of the button to view the contract details was different in the target project cards and in the source project cards. This issue has been fixed.

#MW-3751

In the Project* Scheduler workspace, Agile tab, in some cases, the Cycle Time value could be negative. This issue has been fixed.

#MW-3750

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Project side panel, when drilling down to the Transactions problems, in some cases, the "Jump to transactions" button did not work as expected. This issue has been fixed.

#MW-3730

In the Project* Scheduler workspace, Agile tab, Backlog Item dialog box, when entering an Activity Log, the "User" field listed all the users from the database, even when there was an Iteration's team, Backlog Item team, or the Project Team defined. This issue has been fixed.

#MW-3722

In the Project* Finance workspace, Budget tab, Snapshot History dialog box (available upon clicking on the "Manage Snapshots" button displayed in the footer), the "Savings" column was still displayed in the spreadsheet when the "Enable Project Savings" setting was deactivated, or when the corresponding User Roles and Natures filters did not meet the logged-in user's user role or the selected project's nature. This issue has been fixed.

Note: The setting aforementioned is available in the System Settings workspace, Project Settings folder, Display Preferences tab.

#MW-3702

In the Project* Brief dialog box, Work Objects folder, categories without Work Objects were still displaying empty charts, as well as the "Detailed Table" button. This issue has been fixed.

#MW-3696

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when using the Dependencies feature, the synchronization was possible when the source project Start Constraint date fell after the Project Start Constraint of the target task. This issue has been fixed.

#MW-3685

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Task Details dialog box (accessible upon clicking on the Gear (1-49_img_0.png) icon and selecting the "Edit Task Details" command), Scheduling & Tracking sub-tab, in some cases, it was not possible to create successors or predecessors links. This issue has been fixed.

#MW-3675

In the Project* Dashboards workspace, Budget report, the string "Name" was wrongly displayed below the "Direct Budget" row, instead of the actual name of the cost center. This issue has been fixed.

#MW-3673

In the Project* Scheduler workspace, when creating a new project from an existing one, actual transactions from the source project remained whereas the setting "Enable Remove Actuals" was activated. This issue has been fixed.

#MW-3666

In the Project* Scheduler workspace, Agile tab, Backlog Item dialog box, the "Remaining Effort" field was not automatically updated when entering some effort in the Activity Log. This issue has been fixed.

#MW-3659

In the Project* Scheduler workspace, Agile tab, Homepage view, it was not possible to access the Burn Chart in small resolutions. This issue has been fixed.

#MW-3647

In the Project* Dashboards workspace, the Work Package Overview report was still displayed for all natures when using the "Enabled Natures" filter for the setting "Enable Project Work Packages". This issue has been fixed.

Note: The settings aforementioned are available in the System Settings workspace, Project Settings folder, Dashboards tab.

Resource

#MW-3712

In the Resource Dashboards workspace, Time Tracking Statistics report, Time Tracking Completion sub-tab, the colored indicators of the Timesheet completion at the organization's level was not accurate. This issue has been fixed.

#MW-3701

In the Resource Allocations workspace, Hard Allocations and Soft Allocations tabs, allocations were not sorted by Priority. This issue has been fixed.

Execution

#MW-3719

In the Calendar workspace, it was not possible to navigate through the full previous year. This issue has been fixed.

Portfolio

#MW-3816

In the Portfolio Dashboards workspace, Roadmap tab (with the Report Launcher feature disabled), after drilling down to see the project details, closing the project Full Screen view did not take the user back to the Roadmap tab. This issue has been fixed.

#MW-3803

In the Portfolio Ranking workspace, if Business Cases with different Ranking Cost Source were displayed, then the sorting options for the “Score” and “Priority” attributes were not working as expected. This issue has been fixed.

#MW-3758

In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, the Project* Budgets were not displayed correctly in the Charts. This issue has been fixed.

#MW-3743

In the Master Planning workspace, in the Gantt side panel, when selecting a task, the detailed Health Score labels were too close to the score values, which could cause an overlap in languages other than English. This issue has been fixed.

#MW-3699

In the Portfolio Center workspace, Project Supervision tab, the project "Type" attribute could be modified when the "Use Read-only Project Type" setting was activated. This issue has been fixed.

Note: The setting aforementioned is available in the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab.

#MW-3698

In the Portfolio Dashboards workspace, Roadmap report, clicking on the Health Score was not opening the Health Score Details pop-up as expected. This issue has been fixed.

Note: The user can now open the Project Brief or drill down into the Project details (Full screen pop-up) from the Menu (1-49_img_1.png) button of the Gantt chart.

Administration

#MW-3721

In the System Settings workspace, Project Settings folder, Dashboards tab, the Dashboards could not be enabled for Natures. This issue has been fixed.

#MW-3693

In the Corporate Data workspace, Users tab, User Identification dialog box, the text below the Session Statistics spreadsheet was not centered. This issue has been fixed.