7.1t
This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1t either in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 7.1t is a maintenance release of ProjectAdvantage 7.1.
In the Core product, 5 enhancements have been implemented, and 20 issues have been fixed.
In the ProjectAdvantage Default Configuration, 15 enhancements have been provided and 28 issues have been fixed.
Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.
In order to access to the different sections, please click on the following links:
Important Reminders for upgrade
Default Configuration Enhancements
Default Configuration Corrected Issues
Important Reminders for upgrade
- Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
- As a reminder we only support SAML SSO since January 2019. Consequently we have removed "Windows SSO" and "CAS SSO" in the Designer in the list of Authentication type in this release. Please refer to #41724 for further information.
- Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs : we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
Core Product Enhancements
Built-in HTML5 Client
#41245
The content display on mobile devices was previously scaled down to 75%. This has been fixed so that the content on mobile devices will display the correct scale (100%).
Commands
#41960
There is now an option for popups to remove the built in margins around the displayed form in the popup. This means that the form or text in the popup can extend all the way to the edges of the popup dialog. This option is only available if the selected type of buttons is “None” and the option “Prevent popup closure when clicking outside the popup window or pressing the escape key” is selected as well.
#41002
File uploads did not have a limit in file size, which can be a security vulnerability. The maximum file upload size is now defaulted to 10 MB.
Designer
#42106
When a data view is merged from cfg and if there are fields in the existing version of the data view which do not exist in the cfg version of the data view, we will only keep the user defined fields but we will not keep the built-in reference fields.
Object Edits (Data Categories)
#40148
File uploads will now be limited by an internal black list which includes the following file extensions: “app,asp,bat,cmd,com,eps,exe,inf,js,jse,lnk,msi,msp,pif,ps1,ps2,psc1,psc2,reg,sh,vb,vbe,ws,wsf”
Core Product Corrected Issues
Commands
#42067
There was a bug where link commands that were defined in Named Command Lists (in the Designer) did not always navigate to the target workspace. This has been fixed.
#42043
The “Critical Chain Save Baseline” command was not properly handling tasks that were partially completed. For instance, the resulting “CC Baseline” on a 10-day task (that was 95% completed) was a baseline that was shorter than the task itself (depending on the option settings). This has been fixed.
Designer
#42140
When importing a data view from a cfg, with the Duplicate Data View Option of “Update” selected, it was possible to have duplicate fields in the data view after import. This has been fixed.
#42066
During cfg loading, the product was remapping View Definition IDs for ad hoc formulas in the selector, that could result to source formula not properly imported in the selector. This has been fixed.
#42063
When importing a cfg (which contained a data view with the Update option selected for Duplicate Data View Options in the cfg import dialog) or when importing a collection (which contained a data view), if the data view already existed and was being updated from cfg and the existing data view had fields that did not exist in the cfg version of the data view, then those fields were lost after cfg import. This has been fixed.
Field Edits (Field Types)
#41941
There was a bug where the Current Value column in the Fields view in the Designer was editable even when the Designer was not in Edit Mode. This bug made it seem as though edits to this column were accepted and saved to the database even when not in Edit Mode (which was not the case). This has been fixed.
#41281
There was a bug where changes were not always saved when editing a Field Cell using Internet Explorer. This has been fixed.
Gantt
#42133
An “Error 500” error was encountered sometimes when a user clicked on a button to bring up a command menu (in a Gantt block). It happened when the workspace was displaying a Selector cell (a cell with a hamburger button that when clicked, it displays a Selector dialog). This has been fixed.
Localization
#42099
Multiple INI files that was imported from the Localization dialog can cause Java Heap Space problems, causing the dialog to hang. This has been fixed.
Object Edits (Data Categories)
#42081
A project became corrupted when UnDo operation was used to undo the deletion of a work package. The user either get an error during the UnDo operation or they will get an error the next time they attempt to modify the project. This has been fixed.
Performance
#42103
A memory leak responsible for high memory usage related to Cost Categories has
been found. This has been fixed.
#38785
Performance was slow when users made changes to a project with a large number of work packages. This was because it took a long time to process all the work packages when the project was being saved to the database. This has been fixed.
Printing
#42055
In the Gantt printing dialog, entering a date directly into the text box (without selecting a date from the date picker) could result in an unformatted date, leaving the user unsure if their date input was accepted. This has been fixed, now the date input will be formatted once focus was lost.
#42029
A new mechanism, that purge old temporary Excel and PDF exports from the database daily, is now in place. This can be accomplished by deleting everything with the description “temporary data for download” whose filename starts with “projectadvantage-print” and whose age is greater than one day. This mechanism runs on the server and does its first cleanup five minutes after the server starts up.
Note: The temporary files for export are designed to be deleted when the browser downloaded the file, but if the tab was closed or the download was interrupted in some other way, there can be leftover temporary files in the database.
#41910
Some of the values generated when exporting to Excel or printing to PDF were incorrect (under certain conditions). This would most often happen when the report included a Date loop. This has been fixed.
Scripts/API
#42023
An API program that updates projects was causing an exorbitant amount of memory to be used on the server. A memory leak has been found and fixed which allowed the program to run without causing this high memory usage on the server.
#41931
API programs would not exit after a logout. This has been fixed.
UI Blocks
#42102
The Text Block’s context was lost if included in a Swimlane sub-form. This has been fixed.
#42085
Data labels in the pie chart, containing Hebrew characters, were often missing. This has been fixed.
#41871
Column headers were left-aligned in the Swimlane Block. This has been fixed.
Note: The header row is now consistent with the Grid Block and Text Block headers (styling and frozen).
Default Configuration Enhancements
Dependencies Redesign
In today’s world, most projects depend on other projects or contribute to larger initiatives. The challenge is to get all these projects and capabilities coordinated to minimize schedule slippage, reduce resource conflict, and prevent duplication of effort so that performance is optimized.
To provide these capabilities, we redesigned the Dependencies feature of the ProjectAdvantage Default Configuration.
Tickets that have been resolved with the Dependencies Redesign
| Jira Ticket # | Description |
|---|---|
| MW-3394 | Add alerts for the Dependency Synchronization. |
| MW-3195 | Add an Alert in the Scheduler’s Right panel for dependencies when the Task’s Source and the current task are desynchronized. |
| MW-3177 | Provide the ability to keep the Connections and Dependencies of a Business Case when turning it into a Project. |
| MW-3165 | Provide the ability to Synchronize all the Tasks at once. |
| MW-3090 | Integrate the Dependencies feature into the Scheduler workspace, Planner tab. |
| MW-2048 | Clarify the Dependency behavior when associating a “Copy” Mapping with a “Must Start On” date. |
| MW-1704 | Provide both dependency data and a visual indication that a Target Task has a Dependency directly in the Scheduler workspace, Planner tab, Gantt chart. |
| MW-1433 | Provide alerts to indicate that a Dependency Target Task has existing assignments. |
| MW-1430 | Provide the ability to create Dependencies from Connections and vice versa. |
| MW-1424 | Provide the ability to automatically create a Connection when creating a Dependency. |
| MW-221 | Display the Default Mapping when creating a Dependency. |
| MW-220 | From Dependencies, be capable to create a project to “delegate” a phase to a project manager. |
| MW-3511 | BUG - In some cases, when the task was completed, Dependencies synchronization did not work properly. This issue has been fixed. |
Note: For further information regarding the new features and redesigns provided with the 7.1t release, please refer to the corresponding Feature Presentation available in the Downloads section of the Customer Center.
Project*
#MW-3642
In the Project* Scheduler workspace, in the Gantt chart toolbar, upon clicking on the “Dissolve Buffers” command (available when clicking on the Critical Chain (
) icon), a confirmation will now be requested from the user.
#MW-3485
In the Project* Scheduler workspace, Resources tab, Resource Utilization Overview mode, a new “Selected Project(s) Total Effort” row is now displayed. It provides the Total Effort for the selected time-interval, taking into account Soft, Generic, and Hard Assignments.
Reminder: When multiple projects are selected at once, the Generic Assignments effort is displayed as Soft Assignments Effort.
#MW-3476
In the Project* Scheduler workspace, Planner tab, Scheduler mode, in the Project Problems panel, a new Transaction problems category has been added, with the following problems:
- Overdue Transaction(s) – Indicates the number of Transactions whose Date is in the past, and whose Status is other than “Actual”.
- Transaction(s) outside Project boundaries – Indicates the number of project Transactions whose Date is before the project’s Start date or after the project’s Finish date.
- Transaction(s) outside Task boundaries – Indicates the number of task Transactions whose Date is before the task’s Start date or after the task’s Finish date.
Note: A Filters popup has been added to the Project* Scheduler workspace, Transactions tab in the process.
#MW-3451
In the Project* Scheduler workspace, Status Reports tab, when the Phases & Gates feature is used, the Phases & Gates section will be displayed in the full version of all the Status Reports (rather than being available only in Gate Reports).
Note: This change only applies to newly created Status Reports. Existing reports will not show the section.
#MW-3448
In the Project* Scheduler workspace, Status Reports tab, the Tasks Actual and Remaining Effort and Cost will now be captured with the new Status Reports. These values will be displayed in the Macro-Schedule section of the full version of the Status Report.
Note: This change only applies to newly created Status Reports. Existing reports will not show the section.
#MW-3177
From now on, when creating a new project from an existing project, two new options are provided (when relevant): “Import Connections” and “Import Dependencies”.
Note: These options are also available when turning a Business Case into a Project* and when creating a Sub-Project.
#MW-3141
When using the default Business Case Workflow, the user will have the following options when turning a Business Case into a Project*:
- Do not move any Deliverable
- Move only the non-completed Deliverables
- Move all Deliverables
Portfolio
#MW-3501
In the Portfolio Dashboards workspace, Agile report, Roadmap view mode, when using the new Agile feature, the new right panel is now available when selecting an Agile object in the Gantt chart.
Administration
#MW-3542
In the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab, the “Enable Advanced Attributes Custom Folder” option has been added, allowing the user to add a Custom placeholder in the project Advanced Attributes dialog box.
#MW-3481
In the System Settings workspace, General Settings folder, Display Controls tab, the maximum number of displayed elements can now have one of the following values: 10, 25, 50, 75, 100, and 150.
#MW-3411
In the System Settings workspace, Project Settings folder, Project Creation Options tab, the "Enable Project Creation Button Filter" option can now be Enabled for User Roles. As a result, the “Create New Project” button can now be hidden for different user roles in all the views in which it is featured.
#MW-3410
In the System Settings workspace, Project Settings folder, Workflow Options tab, the “Enable Project Activate/Deactivate Commands” option has been added. This option can be enabled for User Roles. As a result, only the desired users can now Activate and Deactivate the projects.
#MW-3404
In the System Settings workspace, Administration Settings folder, Display Preferences tab, the “Enable Session Statistics” option has been added, allowing the user to display or hide the session statistics in the following views:
- Corporate Dashboards workspace, Session Statistics tab
- User Identification dialog box, Session Statistics section
#MW-3403
In the Corporate Data workspace, Users tab, the “Delete Session Statistics” command has been added to the main toolbar (upon clicking on the More (
) icon), allowing the user to reset to Session Statistics of the User Identification dialog box and of the Corporate Dashboards workspace, Session Statistics tab.
Work Package
#MW-3555
In the Work Package workspaces, in the Data Selector, the user can now enter “My Work Packages” in the filtering bar to only display the Work Packages for which he/she is defined as Manager 1, 2, or 3.
Default Configuration Corrected Issues
Project*
#MW-3651
In the Project* Scheduler workspace, Agile tab, it was possible to start a Backlog Item even if the Iteration to which it belonged was not started. This issue has been fixed.
#MW-3644
In the Project* Scheduler workspace, Resources tab, Resource Utilization Overview mode, in mono-project selection, the Soft Assignments were not displayed. This issue has been fixed.
#MW-3641
In the Project* Scheduler workspace, Resources tab, Resource Utilization Details view mode, the spreadsheet “Other Projects” label could not be localized. This issue has been fixed.
#MW-3632
In the Project* Finance workspace, Budget tab, Details view mode, in all languages except English, when adding multiple Cost Centers to the Direct Budget spreadsheet, an error occurred preventing the user from creating the new entries. This issue has been fixed.
#MW-3630
In the Cost Item Assignment and Resource Assignment dialog boxes, the Cost Center fields displayed all the Cost Centers of the system, regardless of whether or not they were assigned to the corresponding Portfolio Folder or project. In the same way, Inactive Cost Centers were available for selection. This issue has been fixed; from now on, only the relevant Cost Centers will be displayed.
#MW-3626
In the Create a New Project* dialog box, the message displayed in the bottom of the view for information purposes could be misleading. This issue has been fixed.
#MW-3619
In the Project* Scheduler workspace, Agile tab, in some cases, the Cycle Time could be negative. This issue has been fixed.
#MW-3618
In the Project* Finance workspace, Costs tab, Forecast view mode, Transactions sub-tab, the "Total" column of the "Total Forecast" row did not sum the Transactions Amount values. This issue has been fixed.
#MW-3607
In the Project* Dashboards workspace, when using the Report Launcher feature, the description of the Performance report was not updated with all available view modes. This issue has been fixed.
#MW-3603
In the Project* Dashboards workspace, Agile report (available for Product & Program Consolidation dashboards), the report was not updated with the new design and filter features. This issue has been fixed.
#MW-3599
In the Project* Center and Project* Scheduler workspaces, users with read-only access on a Project could still lock it. This issue has been fixed.
#MW-3597
In the Project* Center and Project* Scheduler workspaces, a user could Publish a project locked by another user. This issue has been fixed.
#MW-3592
In the Backlog Item Details dialog box, the Connections list was not sorted by Key. This issue has been fixed.
#MW-3573
In the Project* Finance workspace, Costs tab, Overview view mode, Performance Indicators banner, the warnings were not properly displayed in small resolutions. This issue has been fixed.
#MW-3571
In the Project* Scheduler workspace, Tracking tab, the "Approve" command remained in the command panel even if the setting "Enable Approve Command" was deactivated. This issue has been fixed.
#MW-3570
In the Project* Scheduler workspace, Theater tab, the Flag (
) icon only worked for the English language. This issue has been fixed.
#MW-3502
In the Project* Scheduler workspace, Agile tab, Edit Backlog Item dialog box, when clicking on the “Add Assignee” button, the list of users displayed was not following the rules properly. This issue has been fixed.
The rules are defined as follows:
- If the Backlog Item is linked to an Iteration, and if the Iteration Team is not empty, then the Users selector will show the list of the Iteration’s team members. Otherwise, it will show the list of the project team members;
- If the Backlog Item is not linked to an iteration, but a Team has been defined in the "Team" field of the Backlog Item Details, then the Users selector will show the list of the Backlog Item team members (as defined in the Structure full screen view, Teams tab);
- If the Backlog Item has neither an iteration nor a team defined, then the Users selector will show the list of the project team members.
#MW-3464
In the Project* Scheduler workspace, Planner tab, when using multiple “Scope” filters (available in the Gantt Filters dialog box and side panel), all the tasks that matched one or another filter were displayed, instead of only the tasks which met all the combined selected filters at once. This issue has been fixed.
#MW-3344
In the Notes dialog boxes, it was not possible to copy the text of an existing message. This issue has been fixed.
Resource
#MW-3624
In the Resource Allocations workspace, Team Assignments tab, the archived allocations were always taken into account when calculating the Allocated Effort of a resource. This issue has been fixed.
Note: The “Show Archived” () display option has been added, allowing the user to display or not archived allocations.
#MW-3575
In the Resource Dashboards workspace, Resource Capacity report, as well as in the Resource Brief dialog box, allusions to allocated, committed, or dedicated effort were still made when their corresponding settings were disabled. This issue has been fixed.
Portfolio
#MW-3611
In the Portfolio Dashboards workspace, Roadmap report, the "Problems" column was no longer available. This issue has been fixed; the spreadsheet now displays the new Health Score indicator, which provides more details on the project’s status and provides access to the Project full screen view (upon clicking on the score).
Note: While the Problems column is not displayed by default anymore, it has been added to the Field Set, allowing the user to take advantage of the spreadsheet customization options to add the column.
#MW-3606
In the Portfolio Dashboards workspace, Agile report, Releases view mode, when displaying the Backlog details (by clicking on the "View Backlog Details" (
) button, the wrong message was displayed if there was no Backlog Items. This issue has been fixed.
#MW-3605
In the Portfolio Dashboards workspace, Agile report, the "Agile Object Filter" filtering option was not properly named. This issue has been fixed.
Work Package
#MW-3623
In the Work Package workspaces, Template projects were available in the Data Selector. This issue has been fixed.
Administration
#MW-3580
In the System Settings workspace, Agile folder, when performing the migration process, Backlog Item tasks from the Legacy Agile did not inherit the Completed Date of the Backlog Item (when available) once migrated. This issue has been fixed.
#MW-3574
In the System Settings workspace, Project Settings folder, Dashboards tab, the label of the "Enable Project Status Overview" setting was not aligned with the rest of the settings available for the Program/Product Consolidation Dashboards. This issue has been fixed.
Note: The setting has been renamed "Enable Consolidation Project Status Overview".
#MW-3550
In the System Data workspace, Cost Centers tab, when the Type of a Cost Center was modified (from “Effort” to “Cost” for instance), this change was not reflected in the Project* Budget and Portfolio Budget views Cost Centers. This issue has been fixed.