7.1n
This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1n either in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 7.1n is a maintenance release of ProjectAdvantage 7.1.
In the Core product, 6 enhancements have been implemented, and 19 issues have been fixed.
In the ProjectAdvantage Default Configuration, 26 enhancement has been provided and 36 issues have been fixed.
Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.
In order to access to the differents sections, please click on the following links:
Important Reminders for upgrade
Default Configuration Enhancements
Default Configuration Corrected Issues
Important Reminders for upgrade
- Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
- Config Utility Backup files (CUB zip files) are used as a mean to backup a customer's databases into a .zip file so that it could be restored on another system regardless of the database vendor used in the source and target systems. Since January 1st, 2018 ProjectAdvantage exclusively supports Postgres SQL databases and therefore the need for having a capability to exchange data across different database vendors is no longer needed. As a consequence the CUB export capability is now deprecated, it will continue to work but will be removed in a future release. The CUB import capability will continue to be supported as it is a means to “import” databases from customers that are not currently using Postgres.
Core Product Enhancements
Designer
#40506
Workflow fields in the Data Views are now available as a Pick List option in the Fields view of the Designer. For example, if the “Add Workflow columns” option is turned on in the definition of the project Data View called “ProjectView”, then “ProjectView.Workflow” will be available as a Pick List option.
#41083
The formula functions DataStart() and DataFinish() now accepts one or two parameters. The first parameter is the data that should be analyzed when looking for the start date (DataStart) or finish date (DataFinish) of the existing time-distributed data. The second parameter (if provided) is a yes or no field that specifies whether zero values should be ignored when analyzing the data provided in the first parameter. If the second parameter is not provided, then the analysis will NOT ignore zero values.
Note: After upgrading, old formulas that used the multiple parameter version of these functions will become invalid.
Gantt
#41183
Additional logging has been put in place in order to determine the source of an error condition, this was seen in a customer log but not reproducible in a lab environment.
Performance
#41193
Internal server logging has been improved. Some error messages displayed on the client have been made more descriptive and easy to understand. Also, the “More” button now brings up information that help in reporting issues.
UI Blocks
#40973
For every series in a bar chart, if the field is of data type integer, then the y-axis labels will only show integer values.
#39684
Users can now set whether a data series in a chart is shown, based on a Global Yes/No type field. There is now a new column in the Series table in the Data tab of the Edit Chart Block dialog in the Designer. This new column is called “Display Filter”. The default value for this new column is an empty state, which is equivalent to “Yes”. This column has a drop down list that contains all the available Yes/No fields in the Global category. There are also options for no filter (always show the series) as well as a <Custom> option, where the user can define an ad hoc.
filter.
Core Product Corrected Issues
Built-in HTML5 Client
#41348
Logging into ProjectAdvantage while using Google Chrome browser caused a file called “ContentService” to be downloaded. This has been fixed.
Commands
#41310
If two users imported projects via XML at the same time, ProjectAdvantage server could get in a state where strange behaviors occurred. Such behavior included: buttons disappearing and selector favorites being mismarked. This has been fixed.
#41287
When a command was executed from a popup, ProjectAdvantage disallowed further input and showed a busy cursor while the command was executing. This has been fixed.
#40982
When a project manager submitted a request by using “Status Request” command (with “PM Approve Request” as the parameter) to approve a resource commitment, the suggested resources were not properly added or assigned to the project’s Performing Organizations or Performing Resources. This has been fixed.
Designer
#41280
If a new field was deleted right after it was created and saved, a NullPointerException was thrown. This has been fixed.
#41198
When a cfg file was imported (that contained a field and an alias map), the field was displaying the wrong alias for the imported alias map (after cfg import). This has been fixed.
#40939
When a new user role in Designer was added, System Settings changed and resulted to a different user role being displayed. This has been fixed.
Field Edits (Field Types)
#41339
An “Unexpected Exception” error occurred when Cost Storage (Cost field) was set to “As Input.” This has been fixed.
#41238
An error occurred while refreshing workspaces that contained fields with duration units. This error happened after the server was restarted and before any user refreshed their browsers or new users logged in. This has been fixed.
Gantt
#41272
When a Gantt block was used in a popup and the user performed a “quick” command, such as linking two tasks, an Unexpected Exception occurred. This has been fixed.
#40885
After a Gantt was exported to PDF, SVG, or PNG while using a custom date range (specified in the Export dialog), the on-screen Gantt's horizontal scroll range was not displaying correctly. This has been fixed.
Localization
#41152
Hebrew strings in the Gantt, including cells in the headers and cells in the Grid portion, were rendered in reverse when exported to SVG. This has been fixed.
Object Edits (Data Categories)
#41147 - Modified on March 20, 2019
After editing Organizations (in the Designer or in the HTML5 client) a filter based upon the fully qualified name of a user-defined Organization field that referred to those Organizations did not evaluate properly. This has been fixed.
Printing
#40977
When exporting a Text Block containing Form Cells to Excel, the export output was incomplete and the change in another workspace was no longer possible. This has been fixed.
Scripts/API
#41106
When transactions were created for a project, after API creation, pop-out details of the transaction were not displaying correctly. This behavior was due to the new transaction that had not been assigned internal IDs. This has been fixed.
UI Blocks
#41087
The expand or collapse state of “Group By” rows was not always maintained properly, such that on any refresh, rows that were collapsed could become expanded. This has been fixed.
#40419
Grouped graphs weren't reflecting all of the data (figures provided in the Text Block) which would normally be included. This has been fixed.
#41214
The Workflow Stage Change commands (on Task Level) that were placed in TextBlock loops were not initiated correctly. As a result, the buttons did not opened correctly and displayed an empty error message pop-up when clicking on a task workflow icon. This has been fixed.
#41080
ProjectAdvantage could become unusable, wherein user cannot perform any action, if the user made some extra clicks while opening a popup. This has been fixed.
Default Configuration Enhancements
Phases & Gates Feature
The Phases & Gates feature has entirely been reviewed in ProjectAdvantage 7.1n. Those improvements focus on the following areas:
- Make information related to Phases & Gates more available across the solution
- Provide better reporting and access to KPI like On Time Delivery (OTD) or Deliverable Completion
- Improve the integration of Deliverables within the Gate Review process to help approve Gates and move along the process
Note: For more information, please refer to the 7.1n Feature Presentation document, available on the Downloads page of the Customer Center.
Tickets that have been resolved with the Phases & Gates rework
| Ticket # | Description |
|---|---|
| MW-2454 | Make the Roadmap tab, Phases & Gates table printable |
| MW-2277 | Ability to link a Deliverable to both a specific Task and a Gate |
| MW-2196 | Ability to review Gate progress (OTD) in a multiple-projects environment |
| MW-1983 | Allow administrators to update the Workflow State of a Phase/Gate/Work Package task (default permissions) |
| MW-1912 | Identify the Current Phase/Gate of a project in the Roadmap tab |
| MW-1269 | When approving a phase, make it easy to update its % completed |
| MW-1033 | Ability to identify mandatory Deliverables for approving a Gate |
| MW-1004 | Provide a visual impression of the Product Portfolio Status |
Project*
#MW-2796
From now on, when Creating a Project from an existing project, the Manager 1 will be kept instead of being overwritten by the logged-in user.
#MW-2786
In the Labor Assignment and Cost Item Assignment dialog boxes, the baseline fields are now read-only.
#MW-2784
In the Project Information and Project* Brief dialog boxes, the project Deadline field has been added.
#MW-2782
From now on, the project Nature field will be read-only by default.
Note: The display preferences available in the System Settings workspace no longer impact the Template Scheduler and the Template Center workspaces, as Templates usually don’t have a specific Nature.
#MW-2765
In the Project* Scheduler workspace, Billing tab, Grid view mode, the task Billing Mode column is now only displayed if the project Billing Mode is set to “Hybrid”.
#MW-2650
In the Project* Scheduler workspace, Tracking tab, the Corrections are now displayed when the “Timesheet Corrections” setting is enabled.
Note: This setting is available in the System Settings workspace, Project Settings folder, Time Tracking Options tab.
#MW-2741
In the Project* Scheduler workspace, upon fulfilling a Soft Assignment, if the original Effort has not been completely fulfilled, a new dialog box will allow the user to specify whether the Soft Assignment should be preserved with the Remaining Effort (i.e., Gap) or completely replaced.
#MW-2585
In the Project* Resources workspace, Project Team tab, the “Create New Allocation Request” command is now available for allocated resources as well.
#MW-2548
In the System Settings workspace, Project Settings folder, Project Creation Options tab, some new settings have been added so that, upon creating a new project, a default Workflow can be defined based on the project's Nature.
#MW-2373
The Budget section has been redesigned in the full Status Reports. From now on, when a new status report is captured, ProjectAdvantage will display data for the “Previous Years”, “Current Year” (at the day of the status report submission) and “Future Years”.
>Note: These modifications will not impact Status Reports that have been created before the 7.1n release.
#MW-2321
In all Status Reports (Project, Gate, and Work Package), upon submitting a report, the Total Labor Effort, Baseline Effort, Total Cost, and Baseline Cost of the Tasks (as specified in the Status Report Preferences) will now be captured. In both the full Status Report and the Status Report History dialog box, the Macro-Planning section will feature these new attributes along with colored indicators to easily spot the discrepancies between the current and the baseline values.
Note: This modification has also been applied to the Project* Dashboards workspace, Project Dashboard tab.
#MW-1905
In the Project* Dashboards workspace, Project* Finance tab, Overview view mode, the Costs of the Transaction chart are now split by status.
#MW-1255
To facilitate the update of custom Project fields upon creating a project from an Idea, the "Idea - Connections - Create to Project - Update Project Fields - Placeholder" command list has been added to the Idea workflow and in the Idea Connections section, for the Administrator to overwrite.
Resource
#MW-2769
In the Resource Allocations workspace, the Team Assignments tab have been reworked to only compare the Total Effort with Allocated Effort. In addition, the colored indicators are managed by the Resource Utilization Preferences setting (available in the System Settings workspace, General Settings folder, Colored Indicators tab) and the corresponding legend has been implemented. Finally, the colored indicators have been added at the Project level of the spreadsheet as well.
#MW-2654
In the Resource Commitments workspace, Inbox view mode, in the Fulfill Resource Request dialog box, the user could delete an “Already Committed” resource but the “Done” button was not clickable (blue) and the workspace did not reflect the deletion after clicking on the “Cancel” button. As a result, the behavior has been reworked; the user is now prompted to Validate or Cancel the resource's removal, even if no new commitment is performed.
Note: This enhancement has also been implemented in the "Fulfill Allocation Request" dialog box (Resource Allocations workspace, Allocation Requests tab, Inbox view mode).
Administration
#MW-2845
When pre-approving a Business Case (workflow), the Business Case was published automatically. From now on, a new setting “Enable Business Case Automatic Publish On Pre-Approval” has been added, so that the administrator can choose to activate or not this feature.
#MW-2785
In ProjectAdvantage 7.1L, we introduced the Resources Origin parameters at the project level (None, Project Requests, WP Requests, Allocations).
In the System Settings workspace, Project Settings folder, Global Options tab, three new settings are now available to manage the Resources Origin:
- Set Default Resource Origin: The Resources Origin when creating a project (by default <No Override>)
- Enable Resources Origin Selection: This will display the Resources Origin parameters at the Project level in the Project* Resources workspace, Project Team tab, Advanced Options dialog box.
- Enable Resources Origin Selection in Project Creation (only available if the “Display Resources Origin” option is activated): This will display the Resources Origin parameters in the Project Team step of the Project Creation process.
#MW-2651
In the System Settings workspace, Project Settings folder, Time Tracking Options tab, new settings to enable or disable the Apply Actuals, Apply Remaining, Apply Both, Approve & Rework commands have been added.
Note: These commands are available in the Project* Scheduler workspace, Tracking tab.
Default Configuration Corrected Issues
Project*
#MW-2875
When assigning a resource for the first time in the system, the Usable Effort could be wrong. This issue has been fixed
#MW-2868
In the Template Center and Template Scheduler workspaces, when creating a new Template from an Existing Project, a Project would be created instead of a Template. It was caused by a problem on the version. This issue has been fixed.
#MW-2847
In the Project* Resources workspace, Resource Requests tab, when using the Simplified Build command, the values could sometimes be invalid, displaying "NaNh" instead of the Effort. This issue has been fixed.
#MW-2846
In the Project* Scheduler workspace, Billing tab, Grid view mode, when a project Billing Mode was set to “Hybrid”, the user still had the possibility to select the “Hybrid” Billing Mode at the Task level. This issue has been fixed.
#MW-2844
In the Project* Resources workspace, Resource Requests tab, when selecting a Request, it could be difficult to identify who was the Resource Manager. This issue has been fixed.
#MW-2819
In the Project* Resources workspace, Project Team tab, when using the “Set Unavailable Date” command, the vocabulary used in the popup could be confusing. This issue has been fixed.
#MW-2809
In the Project* Dashboards workspace, Allocations tab, Allocations view modes, several unwanted hamburger icons were displayed for read-only fields. This issue has been fixed.
#MW-2805
In the Business Case Dashboards workspace, the Allocations tab was not available when the selected Business Case was using the Allocation resource acquisition capability. This issue has been fixed.
#MW-2795
In the Project* Scheduler workspace, Theater tab, Display Options section, some option names were not consistent with the rest of the Solution.
This issue has been fixed.
#MW-2783
When reaching the final Workflow State of a Business Case, the Business Case was automatically published. This issue has been fixed; from now on, this will only be the case if the business case has already been published.
#MW-2763
When replacing a Resource/Cost Items, in some cases, the rate was overwritten by the previous resource rate. This issue has been fixed.
#MW-2776
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Filters dialog box and Gantt Filters panel, the "Only Elementary" option had several discrepancies in terms of behavior. The option has been kept in the Theater tab and in the Task Details view mode of the Scheduler. In all other cases, the option has been removed, including the following:
- Project* Dashboards workspace, Project* Performances tab
- Project* Scheduler workspace, Planner tab, Scheduler view mode
- Project* Scheduler workspace, Agile Tracking tab
- Project* Scheduler workspace, Dependencies tab
This issue has been fixed.
#MW-2756
In the Project* Dashboards workspace, Billing tab, the "Cumulated Revenues vs Costs" chart was not clickable (i.e., printing, series selection, and hovering information). This issue has been fixed.
#MW-2747
In the Project* Scheduler workspace, Status Reports tab, in the Status Report Preferences dialog box (accessible upon clicking on the Edit Status Report Preferences (
) button), the “Include Work Package Objects” tooltip did not take into account the Work Package Deliverables. This issue has been fixed.
#MW-2740
In the Project* Scheduler workspace, Resources tab, Details view mode, the Replace or Fulfill command was available even though the Resource/Generic Resource was not assigned on the selected Project. This issue has been fixed.
#MW-2512
In the Project* Scheduler workspace, in the Manage Baselines dialog box, the user could perform actions for read-only projects. This issue has been fixed.
Resource
#MW-2911
In the Resource Dashboards workspace, Resource Utilization tab, in some cases, after filtering on Job Classification, the total was not displaying the appropriate values. This issue has been fixed.
#MW-2848
In the Resource Validation workspace, Calendars tab, Details view mode, upon reviewing the Calendar popup, all the events (including the calendar requests) were shown as full day events. This issue has been fixed.
Please note that the colors used in this view and in the Execution Calendar workspace have been aligned as follows:
- Assignments: plain blue background, white font
- Approved Calendar events: plain green background, white font
- Pending Calendar events: white background, orange font and borders
#MW-2827
In the Resource Commitments workspace, in the “New Notes” folder, the Requests were still displayed for one hour after reading a note. This issue has been fixed.
Note: The “New Notes” folder for the Project* Resources workspace, Resource Requests tab has been updated as well.
#MW-2826
In the Resource Commitments workspace, in the Notes dialog box (accessible via the Notes icon), the label for the commands “Mark as Read” and “Mark as Unread” were reversed. This issue has been fixed.
#MW-2804
In the Resource Allocations workspace, Hard Allocations tab, when filtering the spreadsheet using both the “Display Resources” and “Projects” options (available in the Filters popup), the intersection of the result was not calculated correctly, resulting in too many records being displayed. This issue has been fixed.
#MW-2802
In the Resource Allocations workspace, Allocation Requests tab, Overview view mode, the Allocation Requests were displayed twice in the Top 10 section. This issue has been fixed.
#MW-2797
In the Resource Allocations workspace, Allocation Requests tab, Overview view mode, the Forecast chart was only taking into account Soft Assignments for which an Organization had been defined. This issue has been fixed; now, both Soft and Hard Assignments are taken into account in the Forecast chart.
#MW-2738
In the Resource Dashboards workspace, Report Launcher view, the Intervals and Number of Intervals displayed for the Team Status and Time Tracking Statistics reports were not the right ones. This issue has been fixed.
#MW-2734
In the Resource Allocations workspace, data could be displayed even if the user was not the manager of the organization. This issue has been fixed.
#MW-2653
In the Resource Commitments workspace, when fulfilling a request, if the “Set Requested Effort Format” setting was set to “Rate”, the rate and the fulfilled rate could be slightly different. This issue has been fixed.
Portfolio
#MW-2856
In the Portfolio Ranking workspace, when creating a New Project from the Business Case workflow, the other Business Cases could disappear. This issue has been fixed.
#MW-2854
In the Portfolio Center workspace, Project Supervision tab, the Status Report Indicator was taking into account the Trend indicator, which could result in a bad overall Status Report whereas all Indicators were green. This issue has been fixed.
#MW-2768
In the Portfolio Dashboards workspace, Controlling tab, when no value was selected in the “Cost Values” dropdown (available in the main toolbar), the “Cost Rolling 5 years” chart remained empty. This issue has been fixed.
Administration
#MW-2865
In the System Settings workspace, Portfolio Settings folder, Display Preferences tab, the "Enabled User Roles" field of the "Enable Portfolio Center Project Supervision Tab" option was displaying an empty list. This issue has been fixed.
#MW-2824
In the System Data workspace, Custom Reports tab, when leaving the “Enabled Natures” field empty for a Project* Dashboard, the report would not show in any Project* Dashboards workspace, Reports List panel (when the Report Launcher is activated). This issue has been fixed; leaving the field empty now displays the Custom Report for all natures, like any other “Enabled Natures” field.
#MW-2813
In the System Data workspace, Custom Reports tab, for Project* Reports, when setting the Enabled Natures field in a certain language, the report would only be available in this language. This issue has been fixed.
Agile
#MW-2841
In the Iteration workspace, Definition tab, a user could mark an Iteration as Completed whereas all the Backlog Items were not “Completed” or “Accepted”. This issue has been fixed.
#MW-2754
In the Agile Center workspace, Backlog tab, a Backlog Item already assigned to an iteration could still be attached to another iteration using the “Attach to Iteration” button. This issue has been fixed.
#MW-2753
In the Agile Center workspace, Backlog tab, the “Move” command displayed the same Flash Message regardless of whether the operation was successful or not. This issue has been fixed.
#MW-2748
In the Backlog Items workspace, when converting a Backlog Item Task to a Task, the command was not honoring the selected Parent Task. This issue has been fixed.