2024.06
This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2024.06, both in the Core product and in the ProjectAdvantage Default Configuration, in Vantage and in Deliver.
ProjectAdvantage 2024.06 is a maintenance release of ProjectAdvantage 2024.
In the Core product, 6 enhancements have been implemented and 21 issues have been fixed.
In the ProjectAdvantage Default Configuration, 5 enhancements have been provided and 27 issues have been fixed.
In Vantage, 1 enhancement has been implemented and 15 issues have been fixed.
In Deliver, 5 enhancements have been implemented and 2 issues have been fixed.
In order to access the different sections, please click on the following links:
- Important Reminders for upgrade
- Core Product Enhancements
- Core Product Corrected Issues
- Default Configuration Enhancements
- Default Configuration Corrected Issues
- Vantage Enhancements
- Vantage Corrected Issues
- Deliver Enhancements
- Deliver Corrected Issues
- System Requirements
Important Reminders for upgrade
- To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.
- From the 2023.01 version, to support the implementation of the new Vantage navigation and modules, the Project Dashboards workspace should be added again in the User Roles section of the Designer as the Dashboards workspace doesn't exist anymore.
Core Product Enhancements
Data Snapshots
#SCI-3955
A new feature has been added to the Cloud to allow data snapshots with more than 20,000,000 cells to be exported and downloaded.
Data Visualization
#SCI-4105
The search and filter control of a View Control block has been split into separate Search and Filters controls.

#SCI-3782
In the Projects Center, Actions Center, Deliverables Center, Change Requests Center, Issues Center, Risks Center, and Ideas Center workspaces, the Filters dialog box has been enhanced to allow users to benefit from a better experience while filtering the objects according to various criteria.

Upon clicking on the “+ Add Filter” button a drop down will appear enabling users to select all fields on which they can filter the object.
Predefined Filters

The “Predefined Filters” field enables users to select from a popup, a value which corresponds to a filter that has been created in the Designer.
Note: Predefined Filters will be added automatically in the popup as soon as they are Exposed field filters that have the “Selector Enabled” option checked in the Fields view of the Designer.
Other fields
Apart from the “Predefined Filters” field which is always visible, the other fields available in the picklist are displayed only if they are part of the “Project Filters Options” Field Set for the Projects Center, “Global Actions Filters Options” Field Set for the Actions Center, “Global Issues Filters Options” Field Set for the Issues Center, “Global Deliverables Filters Options” for the Deliverables Center, “Global Change Requests Filters Options” Field Set for the Change Requests Center, “Global Ideas Filters Options” for the Ideas Center and “Global Risks Filters Options” Field Set for the Risks Center.
Note: The fields displayed in the Filter popup accessible from the Selector popup in the Project Card are all Exposed fields.
Operators
Depending on the Field that is selected (Text, date, Numeric, etc…), different operators will be accessible.
Logic
The logic between the fields and values are the following :
- Predefined Filters: AND operator between the values
- Other Fields: OR operator between the values
- AND operator between the filters

In the example above, projects will meet the filters if they are “Active Working versions”, of “Projects” type, for which the Workflow State Vote is either “New” or “Ongoing”, and for which the Name contains “ALB”.
Search
A Search box is now available to ease the selection of a field or a value.

Designer
#SCI-4035
In the Designer, Fields view, for all categories, a “Selector Enabled” column is now available. An “Exposed Fields Filter” checkbox is now also available in the Edit Filter dialog box.
Object/Field Edits
#SCI-4106
In the Projects Center workspace, when clicking on the Columns button in the main toolbar, users now can visualize where a column will be dropped while dragging it.
REST API
#SCI-1560
In the REST API, Timesheet/Assignment endpoints now support User Defined Fields.
Core Product Corrected Issues
Data Visualization
#SCI-4118
In the Corporate Data workspace, Resources tab, when users were changing the “Last Name” ad “First Name” of any resource, the change was not immediately reflected in the Users tab. This issue has been fixed.
#SCI-4112
In the HTML5 Client, an error message was sometimes displayed when users were navigating from one workspace to the other. This issue has been fixed.
#SCI-4099
In some workspaces, when users entered a value with invalid data format, the “Duplicate date should not be entered” error was displayed. The issue has been fixed. From now on, when users enter a value with invalid data format, the “Data format error” error will be displayed.
#SCI-4007
In the HTML5 Client, when users were creating a Business Case that included Budget, Costs, and Forecast values, then were approving the Business Case as new project, the Budget, Costs, and Forecast values were not transferred to the new project. This issue has been fixed.
#SCI-3996
In the Projects Center workspace, when users were filtering the view by selecting an Owning Organization in the Filters popup, the view was sometimes empty and some matching projects could be missing. This issue has been fixed.
#SCI-3939
In the Projects Dashboards workspace, when users were launching reports in a new browser tab then were selecting the “Print” command, the printable version was not displayed correctly. This issue has been fixed.
#SCI-3876
In the Corporate Data workspace, Resources tab, Resource Identification dialog box, data could be lost in the History section when users were changing the Start and End dates. This issue has been fixed.
#SCI-3742
In the Corporate Data workspace, Resources tab, the Manager 1 displayed was not updated and incorrect when it had previously been changed in the System Data workspace, Organizations tab. This issue has been fixed.
#SCI-3718
In the Corporate Data workspace, when users were amending the organization for a resource in the Resources tab, the change was not immediately reflected in the Users tab. This issue has been fixed.
#SCI-3644
In the Projects Center workspace, when clicking on the Columns button in the main toolbar, users were not able to move columns to the last position of the “Shown Columns”. This issue has been fixed.
#SCI-3281
In the Home Page workspace, when users were navigating to the Benefits tab, an error message was displayed and the page was blank.This issue has been fixed.
#SCI-2518
In the PMO Supervision workspace, when users were navigating to the Analytics tab, an error message was displayed and the page was blank. This issue has been fixed.
Designer
#SCI-4046
In some scenarios, users were not able to log in to the Designer using the SSO. This issue has been fixed.
Object/Field Edits
#SCI-3962
In the Projects Center workspace, when users were connected in French, the "Search" text was not fully visible in the Search field in the main toolbar. This issue has been fixed.
#SCI-3846
Under certain circumstances, when users logged in and accessed the same project, it was possible that the Lock button was not accessible. The issue has been fixed.
#SCI-3665
In the HTML5 Client, in some cases, when users were trying to set a date using the date picker, the date was automatically changing to the date before or the date after the selected date. This issue occurred for any date field when the selected date was between 1st April and 1st October. This issue has been fixed.
Performance
#SCI-3165
Some reports in Dashboard workspaces could take a long time to display. To fix the issue, optimization has been done when looping through items.
#SCI-4053
In some cases, users could face a delay in accessing their environment at first login after the server had started. This issue has been fixed; the first login after starting the server has been optimized.
REST API
#SCI-4111 (*Added on 18/07/2024)
User defined field inputs were not as expected when the data was passed as string in the REST API. More particularly, previously when users were trying to change the values of unit rate, Boolean, or duration datatypes in the REST API, the behavior was not the same when the value was passed as double/Boolean and string. This issue has been fixed.
Timesheet (built-in)
#SCI-4107
In some scenarios, a security error could occur when users were logging in to ProjectAdvantage using Microsoft Teams. This issue has been fixed.
Scheduled Job
#SCI-3470
Under certain circumstances, the generation of Data Views from Scheduled Jobs was failing. This issue has been fixed. The generation of larger data sets has been enhanced and is now supported.
Default Configuration Enhancements
CCPM
#MIL-4781
In the Multi-projects Gantt workspace, the "Synchronize Projects" button has been removed as this button is now only available in the new Multi-projects CCPM workspace.

#MIL-4780
A new Multi-projects CCPM workspace has been created to deal exclusively with CCPM projects in multi selection. This new workspace offers a Gantt tab, a Chain Analysis tab and a Fever Chart tab.

Designer
#MIL-4792
In the Designer, new field sets have been created and linked to the View Controls to manage the search filter panel.
Resource Assignments
#MIL-4769
In the Projects Center workspace, Project Card, Gantt tab, once a generic resource has been assigned to a task, project managers are now able to fulfill generic assignments with hard assignments by doing a drag and drop of named resources directly from the Resource Panel to the task. The fulfillment behaves with effort split equally if multiple named resources are dragged and dropped at the same time. The feature is automatically available on projects on which generic assignments exist.
With this feature, users are able to:
- Add a hard assignment even if a generic assignment exists:

- Fulfill the generic assignment with one named resource:

- Fulfill the generic assignment with multiple named resources:

- In the case of multiple generic assignments, replace one generic assignment by one or multiple named resource(s):

Note: A new setting has been added to allow users to choose what behavior will be applied when doing a drag and drop of named resources on tasks already having generic assignments. The options offered are “Add Hard Assignments”, or “Fulfill Generic Assignments”. This setting is located in the System settings workspace, Projects Settings folder, Global Options tab, Miscellaneous sub-tab, Resource panel section.

This setting can be overridden by project managers in the Resource Panel, by clicking on the Gear (
) icon available on the right-hand side of the “Manage Project Resources” button.

Status Report
#MIL-4116
In the Projects Center workspace, Project Card, Overview tab, Status Reports sub-tab, Status Report Preferences dialog box, a new “Task Filtering rule” option has been added to let administrators choose between an “Or” or an “And” operator when using the Tasks related filter options that will influence which tasks are populated in the status reports.

Note: A new "Tasks filtering rule" setting has been added in the System Settings workspace, Project Settings folder, Status Report Options tab. When set empty, it will behave as if the "Or" option was set. The “Or” setting is the default value for status reports.
Default Configuration Corrected Issues
Agile Dashboards
#MIL-4800
In the Project Portal workspace, Agile tab, Project Dashboards full screen view, Activity Log tab, the table headers were not correctly aligned with the columns. This issue has been fixed.
Budget/Finance
#MIL-4782
In the Projects Center workspace, Project Card, Finance tab, Snapshot History popup, when users were capturing new snapshots, only the last project cost center's values were captured and displayed in the Snapshot Details popup, Budget tab. This issue has been fixed.
CCPM
#MIL-4758
In the Work workspace, Gantt tab, XML Updates view mode, the free float and total float bars were incorrectly displayed for CCPM projects. This issue has been fixed.
Execution
#MIL-4379
In the Timesheet workspace, it was not possible to enter actuals on originally non-working days that had been set as working days through a Calendar request. This issue has been fixed.
Idea/Business Case
#MIL-4812
In the Ideas Center workspace, it was not possible to display the charts in the Idea Cards. This issue has been fixed.
#MIL-4768
In the Ideas Center workspace, users were able to create new ideas, even when their user role was excluded for the creation of new ideas by the "Enabled User Roles for Idea Creation" setting. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Idea Center section.
Portfolio Ranking
#MIL-3250
In the Portfolio Ranking workspace, Budget view mode, the “Free” and “Available” Budget values were sometimes incorrect when the “Set Budget Type” setting was set to “Effort”. In addition, users were also not able to view the calculated values’ detailed breakdown. These issues have been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Budget/Finance Settings folder, Global Options tab.
Project Scheduler
#MIL-4786
In the Resource Dashboards workspace, Workload theme, Resource Utilization report, Project Brief dialog box, Gantt folder, generic assignments’ and generic resources’ labels were not displayed, even when the “Enable Gantt Labels Soft Assignments” and “Enable Gantt Labels Generic Resources” settings were enabled.
Note: The aforementioned settings are located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Work section, Gantt & Task List sub-section.
#MIL-4765
In the Project Center workspace, Project Card, Gantt tab, Manage Baselines dialog box, when users were selecting the “Copy” command, selecting a target baseline in the Copy Baseline popup then clicking on the “Cancel” button, the baseline was incorrectly copied. This issue has been fixed.
#MIL-4760
In the Projects Center workspace, Project Card, Task tab, XML Updates, Network and Outline sub-tabs were visible even when the “Enable Gantt XML, Network, and Outline View Modes” setting was disabled. This issue has been fixed.
Note: The aforementioned setting is located in the Systems Settings workspace, Project Settings folder, Display Preferences tab, Project Work section, Gantt & Task List sub-section.
#MIL-4500
In the Work workspace, Gantt tab, Scheduler view mode, the Gantt was not displayed according to preferences defined in the System Settings workspace, Project Settings folder, Global Options tab, Gantt Preferences sub-tab. This issue has been fixed.
Projects Center
#MIL-4811
In the Projects Center workspace, Project Card, Gantt tab, Task panel, Links tab, the page was not properly refreshed when users were deleting a link between tasks. This issue has been fixed.
#MIL-4803
In the Projects Center workspace, Project Card, the workflow state vote associated with the project was not correctly displayed. This issue has been fixed.
#MIL-4783
In the Projects Center workspace, the end-user was still able to create projects even if the "Enable Project Creation Button Filter" setting was activated and restricted to a specific User Role. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Project Creation Options tab, Nature Options section.
#MIL-4774
In the Projects Center workspace, Project Card, Gantt tab, resources whose status was “Inactive” or “Planned” were incorrectly displayed in the Resource Panel. This issue has been fixed.
#MIL-4767
In the Projects Center workspace, Project Card, the Task tab was still visible when none of its sub-tabs were enabled. This issue has been fixed.
Note: The aforementioned sub-tabs can be enabled in the system Settings workspace, Project Settings folder, Display Preferences tab, Project Work section.
#MIL-4763
In the Project Center workspace, Project Card, Gantt tab, Task panel, Dependency tab, when Project Managers unlinked a Project or Task dependency, the dependency remained displayed. This issue has been fixed.
Projects Dashboards
#MIL-4729
In the Project Dashboards workspace, Finance theme, Overview report, the Baseline Cost displayed in the chart was not matching the Baseline Cost displayed in the Key Facts panel. This issue has been fixed.
Resource Allocations
#MIL-4597
In the Resource Allocations workspace, Resource Allocations full screen view, Assignments tab, when users were updating direct allocations from assignments values, the resources could be allocated to deactivated projects if the projects’ names were similar to those of other active projects. This issue has been fixed.
#MIL-4518
In the Resources workspace, Project Allocations tab, the colored indicators were different from those displayed in the Project Allocations full screen view, Allocations tab, Resource Details sub-tab. This issue has been fixed.
#MIL-3819
In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Requests Inbox sub-tab, when filtering the view to display only allocation requests whose workflow state was “Answered”, Resource Managers were able to edit the allocations even after they had been submitted to the Project Manager.
Resource Assignments
#MIL-4795
In the Projects Center workspace, Project Card, Gantt tab, Resource Panel, the resources were not correctly listed when the “Use Resources From” setting was set to “Performing Organizations”. This issue has been fixed.
Note: The aforementioned setting is located in the Resource Management Advanced Attributes popup.
Resource Dashboards
#MIL-4785
In the Resource Dashboards workspace, for all reports under the Time Tracking theme, Filters dialog box, the "Hide Inactive Resources" option was not properly displayed and the "Utilization < %" option was not translated when users were connected in French. These issues have been fixed.
#MIL-4401
In the Resource Dashboards workspace, the “Reset Filters” button was not available if a custom filter was activated and if the "Enable Resource Dashboards Filters Custom Section" setting was set to "None". This issue has been fixed.
Important: This setting must not be empty so that the overwritable filters formula can be taken into account. If the setting is set to empty, this means no custom filter is used for the Resource Dashboards. If the setting is set to "None", this suggests a full custom Filters popup is implemented instead of the standard one.
Note: The aforementioned setting is located in the System Settings workspace, Resource Settings folder, Dashboards tab, Custom Placeholders section.
This behavior has also been rolled out to the Portfolio Dashboards workspace and the Gantt Filters dialog box with their respective settings ("Enable Portfolio Filters Custom Section" and “Enable Gantt Filters Custom Section").
Resource Management
#MIL-4263
In the Project Dashboards workspace, Allocations theme, Allocations vs Assignments report, the Effort values displayed could be incorrect for “Assigned” resources. This issue has been fixed.
Status Report
#MIL-4707
In the Home Page workspace, Status Reports tab, Section Selection popup, the options available under the Descriptions section were not matching the options set in the System Settings workspace, Project Settings folder, Status Report Options tab, Descriptions sub-tab, Descriptions Display Options section. This issue has been fixed.
Work Items
#MIL-3346
In the Work workspace, Work Items tab, Work Items full screen view, Inbox tab, the number of work items displayed in the Work Items List panel was different from the number set with the "Set Inbox Number of Cards" setting. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, General Settings folder, General Options tab, Display Controls section.
Vantage Enhancements
Data Connector
#VAN-479
In Vantage, a connector has been set up so that tasks synchronized from Deliver to Plan follow the same order.
Vantage Corrected Issues
Data Connector
#VAN-1134
In Vantage, when the user was creating a project and was selecting a type in the Create New popup, the newly created project did not have any type attached to it when the data connector was on. This issue has been fixed.
#VAN-1074
In the Work workspace, Gantt tab, tasks could be deleted with no apparent reason in Plan by the data connector while they were still present in Deliver. This issue has been fixed.
#VAN-1056 (*Added on 03/07/2024)
A field mapping verifier has been added in Plan. This verifier goes through every field declared in the data connector mapping, and checks if the declared field type in the mapping is consistent with the type declared in Plan. For each field, a log will be generated, whether the type seems consistent or not. This does not change anything in the workflow of the mapping configuration upload. The aim here is, for now, to be able to trace potential inconsistencies in the logs.
#VAN-788
In some cases, when users were synchronizing Deliver enum fields with Plan enum fields, the synchronization was unsuccessful. This issue was due to enum values being set as empty in Plan, therefore causing the value to not be updated to Deliver. This issue has been fixed.
#VAN-759
The data connector was not triggered when users were editing a field used in a filter but not mapped (e.g. when creating a “sync with Plan” field in Deliver but not in Plan). This issue has been fixed; from now on, when users update fields (whether mapped or not) in Deliver, the data connector is triggered to send the update to Plan. This means that if a "Sync with Plan" field and corresponding output filter appear in the mapping, when changing "Sync with Plan" to "yes", the update is immediately sent without having to edit a different field to trigger the data connector.
VAN-721 (*Added on 03/07/2024)
In Vantage, the character limit was different for the Project Name field in Plan (100) and in Deliver (255). This issue has been fixed; the limit has been set to 255 in Plan as well.
#VAN-679
In specific cases, certain processes (for instance "set-creation-default-value") were not applied in Deliver to updates received from Plan.This issue has been fixed.
#VAN-667
In the Designer, Scheduled Jobs view, when users were executing the “Vantage - DataConnector - Direct initial filling” Command List Job Type, the job was failing. This issue has been fixed.
Vantage Navigation
#VAN-1071
In Vantage, in some cases, users were unable to share views. This issue has been fixed; the view sharing link now displays the view in a separate tab instead of redirecting to the default workspace.
#VAN-918
In Vantage, when users were trying to share Deliver cards on Microsoft Teams, the operation was failing. This issue has been fixed.
#VAN-549
In some scenarios, after logging to Vantage, users could encounter an error message at the bottom of their screen. This issue has been fixed.
#VAN-437
In some scenarios, after logging to Vantage, users could encounter an error message at the bottom of their screen. This issue has been fixed.
Vantage SSO
#VAN-1061
In the APM, in some scenarios, users were unable to log out and were redirected to the Vantage navigation page. This issue was due to an expired certificate in the Deliver instance. This issue has been fixed.
#VAN-971
In Vantage, in some scenarios, users were not able to log out if they were using Microsoft Edge. This issue has been fixed.
#VAN-738 (*Added on 03/07/2024)
In Vantage, users could be prompted to log in again when they were navigating from Deliver to Plan. This issue has been fixed.
Deliver Enhancements
Gridboard
#DELIVER-629
In Deliver, 1,400 Gridboard views inactive since July 2023 have been deleted.
O3
#DELIVER-842
In the O3, a search bar has been added to allow users to filter the views.
#DELIVER-803
In the O3, users can now create more than 100 views for a project.
#DELIVER-743
In the O3, users are now able to search for a view with a search input in the Views panel.
#DELIVER-742
In the O3, there is now no limit on the number of views that can be displayed in the Views panel.
Deliver Corrected Issues
Gridboard
#DELIVER-834
In Deliver, in some cases, an error message was displayed and users were unable to access the boards. This issue has been fixed.
O3 Admin
#DELIVER-684
In the O3, there were no warning checkers informing users the O3 sequence functions could be used for servers in V1 sync when a configuration was pushed, which led full synchronizations to fail. This issue has been fixed; a checker has been added in the O3 help about the sequence functions to alert users about V1 syncs.
System Requirements
There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.
Servers
- Application Server: Apache Tomcat 9 with Oracle Java 8 or OpenJDK
- Data Server: PostgreSQL 12
HTML5 Clients
- Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
- Minimum of 4GB RAM allocated (8GB recommended).
- Browser
- Microsoft Edge
- Microsoft Internet Explorer 10 or 11
- Google Chrome
- Mozilla Firefox
- Apple Safari
ProjectAdvantage Designer
- Display resolution: 1366 x 768
- Minimum of 4GB RAM allocated
- Disk space: 200MB minimum available for ProjectAdvantage.
- Oracle Java 8 or OpenJDK 8
- Operating Systems:
- Windows 7, 8.1, 10 or 11
- Mac OS X Lion or newer
- Alpine Linux 3.16.1
Timesheets Mobile Application
- Being hosted by ProjectAdvantage
- Product version: 2022.08 and upper versions
Vantage platform
Users will need to enable third-party cookies to work within Vantage. For more information regarding third-party cookies, please refer to the following links:
- Firefox: https://support.mozilla.org/en-US/kb/third-party-cookies-firefox-tracking-protection
- Chrome: https://support.google.com/accounts/answer/61416?hl=en&co=GENIE.Platform%3DDesktop
- Brave: https://sigmaos.com/tips/browsers/how-to-manage-cookies-on-brave-browser
- Safari: https://help.apple.com/safari/mac/8.0/en.lproj/sfri11471.html
For customers who subscribed only to Plan
- Installation:
- POD 11 is required if hosted by ProjectAdvantage
- An Hydra server is required if on premise
- Product version: 2023.01 and upper versions
For customers who subscribed to Plan and Deliver
- Installation:
- POD 11 is required if hosted by ProjectAdvantage
- An Hydra server is required if on premise
- HPV2 activated on Deliver modules (activated by default for all new Deliver Clients after 2021 Q3)
- Product version: 2023.01 and upper versions
- Users will need to allow third-party cookies in their browser
Limitations
The data connector does not work in load balanced environments.