2022.11

This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2022.11 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2022.11 is a maintenance release of ProjectAdvantage 2022.

In the Core product, 2 enhancements have been implemented and 14 issues have been fixed.

In the ProjectAdvantage Default Configuration, 5 enhancements have been provided and 13 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.

Core Product Enhancements

Refactoring

#SCI-1980

The new Vantage platform UI has been updated with new CSS elements.

REST API

#SCI-382

New built-in hierarchical category REST API endpoints have been delivered for Job Classifications, Skills, Organizations and Portfolio Folders.

Core Product Corrected Issues

Object/Field Edits

#SCI-1997

Due to a regression, some data view fields could evaluate to an old value. This issue only affected fields that were associated with columns defined in the Data View definition (it was not affecting fields stored in the UserDataBlock column). This issue has been fixed.

Timesheet (built-in)

#SCI-1977

In the Timesheet built-in workspace, it was not possible to fill in decimal values. This issue has been fixed.

REST API

#SCI-1972 and #SCI-2030

DataSnapshots endpoints were not working in a few cases. This issue has been fixed.

#SCI-2028

Following an upgrade from 2022.07 to 2022.08, the date format had changed on fields. The hours were not displayed anymore after the date. This issue has been fixed.

#SCI-1961

The project “Save As” operation was failing if some of its associated data view records were stored in an external data view, namely a data view that is associated with a domain other than the main domain. As a result, an error message was appearing. This issue has been fixed.

#SCI-1300

In the Portfolio Dashboards workspace, Project Monitoring theme, Status Overview report, the “Open Status Report History” button was not working properly when opening in a new tab. This issue has been fixed.

Authentication

#SCI-1941

If the “Basis Field” for a column in a data view definition was a formula and if that formula referenced that column, a self-referential situation would occur where severe errors would be caused, preventing any users from successfully logging in. This issue has been fixed; self-referential data view columns can no longer be created and existing self-referential columns are fixed.

Data Visualization

#SCI-2021

Under certain conditions, newly copied data view records (following a project “Publish” or “Save as”) could incorrectly be accounted for. This issue was temporary and fixed upon the next server restart or any other operation that caused the cache to be repopulated. It was only happening if a formula that referenced those data view records was used in the project permissions or was a project exposed field. This issue has been fixed.

#SCI-1923

Data view records associated with a project were also copied when the "Save As" command was used to create a project’s copy. In rare circumstances, the UserDataBlock column was not properly copied during the copy of the source data view record. This issue only happened when the first data view record processed did not contain any data in the UserDataBlock column. This issue has been fixed.

#SCI-1347

Sometimes, the date format in the HTML5 client was randomly switching between English (MM/dd/yy) and French (dd/MM/yy). This issue has been fixed.

Legacy API

#SCI-1988

Saving a timesheet via the Java API engendered two different issues. Those issues have been fixed.

#SCI-1861

In ProjectAdvantage 2022.07 and upper versions, some performance issues could occur while extracting data views using Java API. This issue has been fixed.

Designer

#SCI-1753

User defined URL fields did not work if the project was published. This issue has been fixed.

#SCI-1645

In the Finance workspace, when the user was clicking on the “Manage Snapshots” button, Budget tab, the budget details were not available for published projects. This issue has been fixed.

Default Configuration Enhancements

Project Management

#MIL-3949

One new field has been created to be used through the API, to connect Plan with Deliver.

Designer

#MIL-3948

In the Designer, two new commands have been created to allow the Administrator to clean up or delete Data Connector Attributes.

CCPM

#MIL-3894

In the Work workspace, Gantt tab, it is now possible to create sub-projects using the CCPM methodology.

Note: A new "Create Critical Chain Sub-Project" option is available from the Gear icon if the "Activate CCPM" setting is activated. This setting is located in the System Settings workspace, General Settings folder, Meta Settings tab.

#MIL-3893

In the Work workspace, Gantt tab, a new way of calculation has been implemented to generate alerts on the Buffers Incursions for CCPM projects. This new method not only takes into account the original Buffer Incursion, but also weights it with the % Critical Chain completion to allow a more accurate status.

Resource Assignments

#MIL-3632

In the Work workspace, Gantt tab, Tasks Details side panel, Assignments sub-tab, a new "Replace" option has been added when clicking on the “More” button in Generic Resources cards to allow the user to replace the current Generic Resource with another one from the Team.

Default Configuration Corrected Issues

Execution

#MIL-3954

In the Timesheet workspace, after idling for a long time in the workspace (without clicking anywhere), when opening the Daily Notes dialog box, the date range was sometimes inaccurate. This issue has been fixed.

Contracts

#MIL-3934

In the Home Page workspace, Contracts tab, Budget section, it was not possible to enter Effort values to Effort Type Cost Centers when the "Enable Mixed Budget Type" setting was activated. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Budget/Finance Settings folder, Global Options tab.

Resource Assignments

#MIL-3924

In the Resources workspace, Resources tab, when replacing a resource by a Hard Assignment, the time distribution options were systematically modified. This issue has been fixed.

Note: A similar fix has been applied to Cost Items.

Designer

#MIL-3921

When importing the Out Of the Box Solution, some fields could be duplicated after every import. This issue has been fixed.

#MIL-3904

In the Designer, Fields section, Organization category, User Defined tab, the default formula for the "Managed By Logged In User With Parents User" field only listed the managers of the current organization, while it should also list the managers of the parent organizations. This issue has been fixed.

Work Items

#MIL-3853

For projects created from a template, in the Work workspace, Work Items tab, Actions connected to Deliverables were not correctly imported. This issue has been fixed.

Resource Allocations

#MIL-3799

In the Resource Allocations workspace, Resource Allocations full screen view, Soft Allocations tab, when the user was fulfilling a soft allocation with more than one resource then deleting a hard allocation from the New Allocations section, all the hard allocations were removed from the New Allocations section. This issue has been fixed.

#MIL-3776

In the Resources workspace, Project Allocations tab, Project Allocations full screen view, Requests tab, Requests Inbox sub-tab, the Project Manager was not able to modify the value of the Requested Effort when the request was in the "Rework" state. This issue has been fixed.

Project Dashboards

#MIL-3411

In the Dashboards workspace, Work theme, Effort Distribution report, the Baseline Effort data displayed in the chart was different from the Baseline data detailed in the table underneath. This issue has been fixed.

Dependencies

#MIL-3410

In the Home Page workspace, Dependencies tab, when a project included several tasks with dependencies on other projects, the loading performance of the tab could be exponential. This issue has been fixed.

Portfolio Center

#MIL-3224

In the Portfolio Center workspace, Budget tab, Budget Simulation popover, History tab, the effort values were not displayed if the "Enable Mixed Budget Type" setting was deactivated. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Budget/Finance Settings folder, Global Options tab.

Status Report

#MIL-2709

In the Home Page workspace, Status Reports tab, Last Submitted view, View Details dialog box, Budget section, the “Total Approved Budget” and “Total Variance” rows displayed Effort values when the project’s budget included both "Cost" and "Effort" types. This issue has been fixed.

Portfolio Dashboards

#MIL-3218

In the Portfolio Dashboards workspace, Controlling theme, Budget Controlling report, when the user was connected in French, the summary ​​for each department and the summary ​​for each project were not displayed when "Cost Center breakdown" was enabled. This issue has been fixed.

System Requirements

There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.

Servers

  • Application Server: Apache Tomcat 8.5 with Oracle Java 8 or OpenJDK
  • Data Server: PostgreSQL 10 to 12

HTML5 Clients

  • Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
  • Minimum of 4GB RAM allocated (8GB recommended).
  • Browser
    • Microsoft Edge
    • Microsoft Internet Explorer 10 or 11
    • Google Chrome
    • Mozilla Firefox
    • Apple Safari

ProjectAdvantage Designer

  • Display resolution: 1366 x 768
  • Disk space: 200MB minimum available for ProjectAdvantage.
  • Oracle Java 8 or OpenJDK 8
  • Operating Systems:
    • Windows 7, 8.1 or 10
    • Mac OS X Lion or newer
    • Alpine Linux 3.16.1

Timesheets Mobile Application

  • Being hosted by ProjectAdvantage
  • Product version: 2022.08 and upper versions