This document describes the enhancements, corrected issues, and new features that have been implemented in Vantage and in ProjectAdvantage 2022.12 both in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 2022.12 is a maintenance release of ProjectAdvantage 2022.
In Vantage, 5 issues have been fixed.
In the Core product, 2 enhancements have been implemented and 14 issues have been fixed.
In the ProjectAdvantage Default Configuration, 1 enhancement has been provided and 26 issues have been fixed.
In order to access the different sections, please click on the following links:
- Important Reminders for upgrade
- Vantage Corrected Issues
- Core Product Enhancements
- Core Product Corrected Issues
- Default Configuration Enhancements
- Default Configuration Corrected Issues
- System Requirements
Important Reminders for upgrade
- Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
- To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.
Vantage Corrected Issues
Timesheet (built-in)
#VAN-37
In the Timesheet (built-in) workspace, when the user was double-clicking on “Remaining Effort”, the page would freeze. This issue has been fixed.
#VAN-27
In the Timesheet (built-in) workspace, after a user had clicked on the “Submit Week” button, an incorrect error message was displayed if he was clicking on the “+ Task(s)” button. This issue has been fixed.
#VAN-11
In the Timesheet (built-in) workspace, when the user was clicking on the “+ Task(s)” button, it was not possible to add Non-project Tasks. This issue has been fixed.
#VAN-40
In the Timesheet (built-in) workspace, the assigned Tasks, Days and Effort were not displayed when the user was changing the language through the user settings. This issue has been fixed.
Timesheets Mobile Application
#VAN-28
In the Timesheets Mobile Application, there was an issue in all languages causing accents to display incorrectly. This issue has been fixed.
Core Product Enhancements
Authentication
#SCI-1980
We have moved the language selection to the user’s settings. This means the language selection will no longer be done from the login page but under Settings for the logged in user. With this new change, the first time a user logs in, any existing “gwtLocale” cookie will be used to set the locale; however, each user can also go to Settings and select his preferred language, which will then be saved to the database for future logins, as shown below:

REST API
#SCI-608
Previously, when the user was trying to create records for UserDataBlocks using the REST API, the primary keys were not generated for categories other than Global. Consequently, there was no way to link the record to the parent category object. REST API UserDataBlocks are now generated for categories other than Global.
Core Product Corrected Issues
Data Visualization
#SCI-1721
When we had resources with the same name, it was not possible for users to distinguish resources while selecting a Labor assignment. In order to fix the issue, an ID field has been added along with the Name to help user identifying as well as searching/allocating the correct resource.
#SCI-1804
Whilst in multi-project selection, in the Dashboards workspace, Controlling theme, an error message was displayed when launching the Performance report. This issue has been fixed.
#SCI-1355
In the Finance workspace, Cost Transactions popup, when creating Project Transactions or Project Distributed Transactions, monetary values were displayed in the currency of the entered values instead of the user’s preferred currency. This issue has been fixed; a new “As Client” format has been created to display Costs in the user’s selected currency.
#SCI-1858
In the System Data workspace, Custom tab, when the user was pasting (or entering) cost data in a blank row at the very bottom of a grid, the cost value was automatically converted using the reference currency and was displaying an incorrect figure. This issue has been fixed.
#SCI-1623 & SCI-1061
In the Dashboards workspace, Analytics theme, Tasks report, an error message was displayed when the user was launching the report. This issue has been fixed.
Object/Field Edits
#SCI-2112
When forcing specific dates format, it was possible that a screen couldn't be loaded anymore. This issue has been fixed.
#SCI-2081
When a project was published, if the working version had no records for a particular data view definition, the existing data view records (for that same data view definition) associated with the project were not deleted. This issue has been fixed.
#SCI-2080
An "Unexpected Exception" message was displayed when using the “Up” arrow key to move from one row to another in the Timesheets workspace. This issue has been fixed.
#SCI-1761
When the user was clicking on the Gantt icon to open the Gantt in a separate tab, neither the "Scroll into View" nor the "Summarize at Level" commands worked when a task was selected if the Gantt button had been created to be opened using the “Link” command. This issue has been fixed.
#SCI-1760
If the user was using the Selector’s path to select a resource before clicking on the Gantt icon to open the Gantt popover, the selection would be refreshed and the previous selection would be lost after closing the popover. This issue has been fixed.
Performance
#SCI-1998
A “NullPointerException” could occur if two users were accessing the same field at the same time. This issue has been fixed.
Scheduled Jobs
#SCI-1757
Cloud Scheduled Jobs creating data snapshots were not running properly and their status was not changing due to an intermittent concurrency error that would cause a deadlock. This issue has been fixed.
Designer
#SCI-1172
In the Designer, in the Organizations section, when the user was clicking on Tools then Initialize Reorganization, the “Pending Organization” tab was empty. This issue has been fixed.
Default Configuration Enhancements
Project Management
#MIL-3992
One new field has been created and another one has been updated to be used through the API, to connect Plan with Deliver.
Default Configuration Corrected Issues
Agile
#MIL-3142
In the Portfolio Dashboards workspace, Agile theme, Epics report, the toolbar did not react properly when a user tried to filter the report by clicking on a pie slice. This issue has been fixed.
Resource Allocations
#MIL-3705
In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Requests Inbox sub-tab, the Soft Allocations section was available even if the "Enable Resource Allocations Soft Allocations" setting was deactivated. A similar behavior was observed when the "Enable Resource Allocations Hard Allocations" setting was deactivated. These issues have been fixed.
Note: The aforementioned settings are located in the System Settings workspace, Resource Settings folder, Display Preferences tab, Tab Options section. The fix has also been applied to the Edit Allocation Request popup.
#MIL-3797
In the Resource Allocations workspace, Resource Allocations full screen view, Soft Allocations tab, Overview by Organization sub-tab, when fulfilling a Soft Allocation with more than one resource using the "Respect Usable Effort" option, a zero effort Hard Allocation was created. This issue has been fixed.
#MIL-3614
In the Resource Allocations workspace, Resource Allocations full screen view, Hard Allocations tab, Resources Details sub-tab, there was too much empty space between the header and the Total Allocation row in the main view. This issue has been fixed.
Resource Dashboards
#MIL-3575
In the Resource Dashboards workspace, the "Hide Inactive Resources" filter did not work as expected for reports under the Time Tracking theme. This issue has been fixed.
#MIL-3993
In the Resource Dashboards workspace, Workload theme, Effort Distribution report, some external resources’ names were unreadable. This issue has been fixed.
Projects
#MIL-3547
In the Work workspace, Gantt tab, Assignments Scheduling full screen view, Task-Driven Review tab, the “Search based on Resource Name” filter was not working. This issue has been fixed.
Portfolio Management
#MIL-3732
In the Portfolio Work Management workspace, the whole workspace was disabled if the "Enable Portfolio Work Items" setting was deactivated. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Work Management Settings folder, Display Preferences tab, Portfolio Work Management section.
#MIL-3787
In the Portfolio Center workspace, Project Supervision tab, the "Managed By" filter only showed projects based on Manager 1, ignoring Manager 2 and Manager 3. This issue has been fixed.
Project Scheduler
#MIL-4029
In the Work workspace, Task Tags colors could be not retrieved if the user was creating a project from an existing one which had previously been created from a template. This issue has been fixed.
#MIL-3743
In the Focus Mode full screen view, Dashboards tab, the content of the Baseline Comparison and Deliverable Supervision sub-tabs could not be displayed. This issue has been fixed.
#MIL-3996
In the Work workspace, Gantt tab, Theater view mode, Advanced Right Panel, Filters sub-tab, when launching the Full Screen view, the Project Manager was able to create new assignments after clicking on a task. This issue has been fixed.
#MIL-3944
In the Work workspace, Gantt tab, Scheduler view mode, Gantt Task Panel, Assignments tab, the Remaining Effort of Labor assignments was displayed when the "Enable Assignment Card Custom Section" setting was activated. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Work section, Gantt Right Panel sub-section.
Project Management
#MIL-3758
In the Administration workspace, Definition tab, Stakeholders section, the "Published By" field was not emptied when creating a new project from an existing one. This issue has been fixed.
#MIL-4024
When creating a new project from an existing project or a template that only had Actions, the import options were not available in the Project Creation popup. This issue has been fixed.
CCPM
#MIL-3789
In the Work workspace, Gantt tab, the "Insert a Template" button was missing for CCPM projects. This issue has been fixed.
Budget/Finance
#MIL-3856
In the Finance workspace, the loading performance could be slow if Savings were enabled. This issue has been fixed.
#MIL-4022
In the Finance workspace, Cost Transactions popup, when clicking on the “New” button in the toolbar, Project Distributed Transaction option, when the command list behind was overwritten, the behavior was not as expected; namely the Distributed Transaction popup was not opening and the new transaction could not be defined. This issue has been fixed.
#MIL-3991
In the Finance workspace, Cost Transactions popup, the position of the Custom section was not aligned in the Transaction Details dialog box for dated transactions and distributed transactions. This issue has been fixed.
#MIL-3986
In the Finance Workspace, the Custom tab was never displayed when the “Enabled Natures” filter of the “Enable Project Finance Custom Tab” setting was set with values. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Finance section.
#MIL-3696
In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, the amounts of the distributed Cost Transactions were incorrectly retrieved and different in the charts. This issue has been fixed.
Work Items
#MIL-3997
In the Work Items workspace, it was possible to create Portfolio related Work Items, even if the "Enable Portfolio Work Items" setting was deactivated. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Work Management Settings folder, Display Preferences tab, Portfolio Work Management section.
Project Dashboards
#MIL-3982
In the Dashboards workspace, for custom reports, the Description popup could not fully retrieve long text. This issue has been fixed.
#MIL-3556
In the Dashboards workspace, Analytics theme, Tasks report, the Tags column did not display the tag names. This issue has been fixed.
Status Reports
#MIL-3922
In the Home Page workspace, Status Reports tab, Status Report Details popup, the Budget section was not showing all cost centers from the project’s budget. This issue has been fixed.
Execution
#MIL-3735
In the Overview workspace, the “Link” button from the Rework Comments History popup did not redirect users to the Timesheet workspace. This issue has been fixed.
System Requirements
There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.
Servers
- Application Server: Apache Tomcat 8.5 with Oracle Java 8 or OpenJDK
- Data Server: PostgreSQL 10 to 12
HTML5 Clients
- Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
- Minimum of 4GB RAM allocated (8GB recommended).
- Browser
- Microsoft Edge
- Microsoft Internet Explorer 10 or 11
- Google Chrome
- Mozilla Firefox
- Apple Safari
ProjectAdvantage Designer
- Display resolution: 1366 x 768
- Disk space: 200MB minimum available for ProjectAdvantage.
- Oracle Java 8 or OpenJDK 8
- Operating Systems:
- Windows 7, 8.1 or 10
- Mac OS X Lion or newer
- Alpine Linux 3.16.1
Timesheets Mobile Application
- Being hosted by ProjectAdvantage
- Product version: 2022.08 and upper versions