2022.10
This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2022.10 both in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 2022.10 is a maintenance release of ProjectAdvantage 2022.
In the Core product, 3 enhancements have been implemented and 12 issues have been fixed.
In the ProjectAdvantage Default Configuration, 4 enhancements have been provided and 30 issues have been fixed.
In order to access the different sections, please click on the following links:
- Important Reminders for upgrade
- Core Product Enhancements
- Core Product Corrected Issues
- Default Configuration Enhancements
- Default Configuration Corrected Issues
- System Requirements
Important Reminders for upgrade
- Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
- To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.
Core Product Enhancements
REST API
#SCI-1593
A new /health REST API endpoint has been implemented to check the application’s health status.
#SCI-382
New built-in hierarchical category REST API endpoints have been delivered for Job Classifications, Skills, Organizations and Portfolio Folders.
Designer
#SCI-1551
In the Designer, the button to enable the new platform UI (renamed “Vantage”) has been moved from the Style Sheets view’s toolbar to inside the Style Sheets view and updated to reflect the new name. The button is enabled only when the user is in Edit mode.
Core Product Corrected Issues
Data Visualization
#SCI-1919
In the Dashboards workspace, some fields related to Deliverables could be empty if a “Related Task” was assigned. This issue has been fixed.
#SCI-1909
In rare circumstances, when attempting to access task data, the task would be properly loaded, but would not be properly processed, and the resulting behavior would be as though the task no longer existed in the system. Typically this would result in blank cells or improper data values. This issue has been fixed.
#SCI-1851
After upgrading to ProjectAdvantage 2022.07, some projects could not be published anymore and an error was displayed. This issue has been fixed.
#SCI-1796
Non blank Task reference fields could become blank for no apparent reason. The issue was due to concurrency problems where the interaction between two nearly-simultaneous requests from two different users could cause some internal data to be in an unexpected state. This issue has been fixed.
#SCI-1699
Errors could occur after updating from ProjectAdvantage 2021.11 to ProjectAdvantage 2022.07. The issue was because a null condition was failing in the FieldStringData method. This issue has been fixed.
Timesheet (built-in)
#SCI-1875
In the Timesheet built-in workspace, when a project/task is closed, the user will now be warned with a message indicating that it is not possible to import activity logs on projects/tasks that are closed.
Application bar
#SCI-1847
When connected in French, the names of the workspaces under the Built-in Workspaces label were not localized. This issue has been fixed.
Designer
#SCI-1753
In the Administration workspace, Attachments tab, the user defined URL field didn’t work if the project was published. This issue has been fixed.
Scheduled jobs
#SCI-1527
In a load balanced environment, it was possible for data view results on one server to differ from results on another server due to stale cache values. This issue has been fixed.
Security
#SCI-1454 (Modified on December 6, 2022)
When users configured Tomcat with the SSL certificate by updating the “server.xml” file in the “conf” folder, the certificate’s password was not encrypted in the “server.xml” file in the “keystorePass” parameter. This issue has been fixed.
To encrypt the Key Store Pass, please follow the procedure:
- Download the CryptoUtils.jar file available on the Customer Success Center, Release Folder, Developer documentation section.
- Encrypt the password and update the configuration file (server.xml)
- Run the following command with the password in the command line:
java -jar CryptoUtils.jar "<password>”
An encrypted password will be returned. - Update the encrypted password to keystorePass parameter and "com.sciforma.crypto.Http11Nio2Protocol" to protocol in the connector tag.
<Connector port="8443"
protocol="com.sciforma.crypto.Http11Nio2Protocol" SSLEnabled="true"
maxThreads="150" scheme="https" secure="true" sslProtocol="TLS"
keyAlias="tomcat" keystoreFile="C:/ProjectAdvantage/SSLCert/keystore.jks"
keystorePass="ENCRYPTED_PASSWORD" /> - Put the “CryptoUtils.jar” file in the Tomcat's lib folder.
- Start your server
REST API
#SCI-839
The REST API documentation has been updated to reflect the fact that projects and User Defined Category records can only be sorted and filtered by exposed fields.
Legacy API
#SCI-1766
Project publish was blocked in legacy api for projects which had data views with read-only fields. This issue has been fixed.
Default Configuration Enhancements
General
#MIL-3897
Three new fields have been created to be used through the API to connect Plan (ProjectAdvantage) with Deliver (One2Team).
Project Scheduler
#MIL-3877
In the Work workspace, Gantt tab, Scheduler view, the end-user now has the possibility to display the Calendar duration field in the Gantt spreadsheet. As a reminder, the Duration field equals the Duration of the longest assignment and is editable, whereas the Calendar duration equals the Completed Duration plus the Remaining Duration and is read-only.
Resource Allocations
#MIL-3835
In the Resource Allocations workspace, Assignment full screen view, Update Direct Allocations from Assignments popup, it is now possible to update the allocations for the Time Frame of the selected entire projects.
Note: The Entire Project mode will now consider the minimum Start and the maximum Finish within the selected projects to update the allocated effort.
Status Report
#MIL-3796
In the System Data workspace, Status Reports tab, Additional Descriptions sub-tab, a new column has been added to display additional comments depending on the Project Type.
Default Configuration Corrected Issues
Resource Assignments
#MIL-3895
In the Designer, Fields view, Fields tab, Labor Assignment category, Formulas sub-tab, the "Specific Baseline Effort" formula referred to the wrong Global field, resulting in an incorrect calculation of the Baseline Effort where the field was used (i.e. reports). This issue has been fixed.
#MIL-3834
In the Resources workspace, Resources tab, the Total Effort displayed on the selected project row was equal to the first task’s assignment only instead of the sum of all the corresponding task assignments. This issue has been fixed.
#MIL-3377
In the Resources Workspace, Resources tab, in some rare cases, the Total Effort at the resource level could be different than the sum of the detailed assignments. This issue has been fixed.
#MIL-3014
In the Resources workspace, Resources tab, clicking on the Details button for a Generic Resource, Assignment Details full screen view, it was not possible to see the details for the Generic Resource if other Generic Resources with the exact same attributes existed in the Project Team. This issue has been fixed.
Resource Allocations
#MIL-3878
In the Resource Allocations workspace, Resource Allocations full screen view, Soft Allocations tab, Overview by Organization or Overview by Project sub-tabs, if the selected organization(s) did not have any existing Soft Allocations, the table listed all the Soft Allocations from all the Organizations. This issue has been fixed.
#MIL-3829
In the Resources workspace, Project Allocations tab, Project Allocations full screen view, Requests tab, Requests Inbox sub-tab, when submitting an allocation request for a specific period by Project Allocation, the allocations were also added outside the requested period. This issue has been fixed.
#MIL-3529
In the Resource Allocations workspace, Resource Allocations full screen view, Assignments tab, updating allocations for a custom period only updated the values within the selected custom period but removed allocated effort outside the custom period. This issue has been fixed.
Work Items
#MIL-3873
In the Client Portal workspace, Actions full screen view, Grid tab, clicking on the Edit button prompted the Action Details popup twice. This issue has been fixed.
#MIL-3536
In the Work Items workspace, work items could not be related to completed tasks. This issue has been fixed.
#MIL-3136
In the Home Page workspace, Work Packages tab, Deliverables dialog box, clicking on the “New” button in the toolbar did not result in the creation of Deliverables at the Work Package level. This issue has been fixed.
Agile
#MIL-3863
In the Work workspace, Agile tab, Full Backlog full screen view, Move command, Move to another Iteration sub-command, when a user wanted to move a Backlog Item to another Iteration with the option to keep the Workflow State, the Workflow State was reset. This issue has been fixed.
Execution
#MIL-3859
In the Calendar workspace, when the user wanted to visualize his assignments by activating the switch button "Show Assignments:", nothing was displayed. This issue has been fixed.
#MIL-3775
In the Timesheet workspace, Daily Notes dialog box, the Team Member did not have the possibility to properly read the entire note. This issue has been fixed.
Resource Dashboards
#MIL-3854
In the Resource Dashboards workspace, Effort Distribution report, the colored indicators were sometimes incorrect. This issue has been fixed.
#MIL-3821
In the Resource Dashboards workspace, Resource Utilization report, Soft Assignments were filtered out when the "Resources" filter was used, even though the "Show Assignments" filter was set to "All Assignments" or emptied. This issue has been fixed.
#MIL-3827
In the Resource Dashboards workspace, Project Actuals report, the colored indicators were incorrect. This issue has been fixed.
Administration
#MIL-3824
In the Corporate Data workspace, Users tab, when creating users from resources, the Contract Type user attribute was empty. This issue has been fixed.
Portfolio Simulation
#MIL-3811
In the Portfolio Center workspace, Budget tab, the "Simulation Sandbox" button was available even if the setting "Enabled User Roles for editing Portfolio Budget" was filtered with a User Role. This issue has been fixed.
Note: The aforementioned setting is located in the System Settings workspace, Budget/Finance Settings folder, Global Options tab, Portfolio Budget section.
Finance
#MIL-3805
In the Finance workspace, Dashboards full screen view, Costs tab, Cost Center breakdown enabled, the Total Cost for the “No Budget” section could be empty, even if the Total Cost should have been displayed. This issue has been fixed.
#MIL-3684
In the Finance workspace, Snapshot History dialog box, Snapshot Details popup, data from the Budget, Outbound and Work Package sub-tabs did not have the same presentation as for the other sub-tabs. This issue has been fixed.
Designer
#MIL-3763
In the Designer, Email view, Template Lists tab, for Global Deliverables, the content of the email was incorrect and mentioned “issue” instead of “deliverable”. This issue has been fixed.
Project Scheduler
#MIL-3760
In the Work workspace, Gantt tab, Scheduler view mode, Advanced Right Panel, Links tab, it was not possible to create a new link with the button “New” in French because it was truncated. This issue has been fixed.
#MIL-3590
In the Work workspace, Gantt tab, when fulfilling a soft assignment with Distribution Type set to "Fixed Effort", the Total effort of the assignment changed if the selected resource had non-working days during the assignment’s time frame. This issue has been fixed.
#MIL-3558
In the Work workspace, Tracking tab, By Resources view mode, Timesheet Details full screen view, the "Rework" button was still visible even if the setting "Enable Rework Command" was deactivated. This issue has been fixed.
Portfolio Center
#MIL-3715
In the Portfolio Center workspace, Project Supervision tab, Filters popup, the Workflow States filter was missing from the popup when prompted right after logging into the session. This issue has been fixed.
Phases & Gates
#MIL-3671
In the Work workspace, Phases & Gates tab, Gate Status Reports full screen view, New Status Reports could be created even if the Gate was already approved. This issue has been fixed.
Work Package
#MIL-3923
In the Work Package Scheduler workspace, Gantt tab, Scheduler view mode, when the Work Package was locked, the Undo/Redo options did not work properly. This issue has been fixed.
#MIL-3664
In the Work Package Scheduler workspace, Gantt tab, Scheduler view mode, even if a user had write access to the Work Package, he was not able to add new assignments. This issue has been fixed.
Portfolio Dashboards
#MIL-3473
In the Portfolio Dashboards workspace, Capacity Planning report, the Day and Week intervals were missing. This issue has been fixed.
#MIL-3694
In the Portfolio Dashboards workspace, Capacity Planning report, when the user filtered out by parent Organization and no resource matched with this filter, data from children Organization were displayed. This issue has been fixed.
System Requirements
There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.
Servers
- Application Server: Apache Tomcat 8.5 with Oracle Java 8 or OpenJDK
- Data Server: PostgreSQL 10 to 12
HTML5 Clients
- Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
- Minimum of 4GB RAM allocated (8GB recommended).
- Browser
- Microsoft Edge
- Microsoft Internet Explorer 10 or 11
- Google Chrome
- Mozilla Firefox
- Apple Safari
ProjectAdvantage Designer
- Display resolution: 1366 x 768
- Disk space: 200MB minimum available for ProjectAdvantage.
- Oracle Java 8 or OpenJDK 8
- Operating Systems:
- Windows 7, 8.1 or 10
- Mac OS X Lion or newer
- Alpine Linux 3.16.1
Timesheets Mobile Application
- Being hosted by ProjectAdvantage
- Product version: 2022.08 and upper versions