;

Skip to main content

 

  • arrow icon

 

Planview Customer Success Center

7.1z

This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1z either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 7.1z is a maintenance release of ProjectAdvantage 7.1.

In the Core product, 2 enhancements have been implemented, and 11 issues have been fixed.

In the ProjectAdvantage Default Configuration, 14 enhancements have been provided and 45 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the different sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Built-in HTML5 Client

#39779

A new feature was added to the Selector which displays current selection at the bottom (if expanded) 1-54_img_0.png

and vertically above the collapsed button (if collapsed). 1-54_img_1.pngIf there are multiple selections, a "Multiple items selected" message will be displayed with a count of the number of selections. If the selection is a Project selection, there will also be a Project lock status next to the selection display in the form of a locked or unlocked icon.

If a selector is embedded in a report instead of controlling the report, it will no longer have an option to collapse.

Commands

#42588

There is a new option in the Edit Command dialog box (“Execute once by formula”) that allows the Designer to execute each command once on a set of items defined by a formula. The previously-existing “Loop based on formula” option has always allowed the Designer to process a set of items defined by a formula.The previous option will result in multiple executions of the command list (once for each item in the set) and therefore might have poor performance. There are some commands that only process one item, so a “Loop” command might be necessary if the Designer wants multiple items processed.

1-54_img_2.png

It should be noted that the three options (“Execute once by formula”, “Loop on selected” and “Loop based on formula”) all properly set the data context for the commands. For example, specifying a formula that evaluates to a set of Tasks in the “Execute once by formula” option, will allow the Designer to create task-oriented commands (e.g. a Set Field Values command that sets the Task.Duration field)

Core Product Corrected Issues

Built-in HTML5 Client

#42683

The “Generate View” Scheduled Jobs could end up referencing old or outdated Data View Definitions. This could lead to various problems when the Scheduled Job was generated (either through a trigger or when scheduled). As a workaround a customer can edit the definition of the Generate View and can re-select the Data Views (in the “View” column of the “Generate Data View” dialog box). This has been fixed.

Note: After upgrading, it may be necessary to recreate some of the rows in the “Generate Data View” dialog box for those “Generate View” schedule jobs that referred to old or outdated Data View definitions.

#42658

The login screen of the HTML5 Client is now using the new ProjectAdvantage logo.

Commands

#41451

When “All tasks” option was used in the Update Progress command, only one selected project would be honored. After the fix, the command now works with multiple selected projects. This has been fixed.

Designer

#42748

Unscheduling a running scheduled job would previously cause it to be "Stopped" and then show as "Interrupted", however as of 7.1x the status remains "Stopped" and the job continues to run without actually being interrupted. The issue has been fixed.

#42357

An error message was displayed when a block used an overwritten filter. This has been fixed.

Object Edits (Data Categories)

#42582

A user with no Object Edit Rights could possibly edit user objects and give themselves a Super User role. It was discovered that, while reviewing this issue, Object Edit Rights were not being enforced on a number of object types. This has been fixed.

Performance

#42668

The ProjectAdvantage server would hang (with some databases) while starting up. This has been fixed.

UI Blocks

#42489

The report selector collapsed state was not retained when closing a popup. This has been fixed.

#42478

A NullPointerException can occur when attempting to modify certain calendar data. This has now been fixed.

#42297

The NaN% values were possible to appear in time-distributed cells for user-defined fields under some circumstances. This was due to the data being internally corrupted. Code has been

added to load only the non-corrupted data from the database. This has been fixed.

#38372

The “Show Non-default Logic” feature was not implemented in the HTML5 client. This has been fixed.

Default Configuration Enhancements

Our users talked to us and we listened. We are happy to provide a series of improvements to make our support of Agile projects and products even better.

This initiative focuses on the following areas:

  • Bring key features where and when users need them
  • Provide more automation whenever possible (Agile templates, Backlog Items bulk-creation, etc.)
  • Continue developing the integration between the Agile and Waterfall worlds (better synchronization between Tasks and Iterations, Agile and Project Teams.)
  • Add Project-level options to allow Product Owners and Scrum Masters to customize their experience

Tickets that have been resolved with the Agile Phase 2 Redesign

Jira Ticket #Description
MW‑4584Clarify which resources can be added to the Agile Team.
MW‑3728Provide data about consolidated Effort in the Key Facts of the Product Backlog.
MW-3716Make the separation more obvious between the full screen view Name and the Back arrow.
MW-3713Provide the ability to create Iterations from the Home Page.
MW-3665Provide the Backlog Item Key in the Agile Dashboards full screen view, Team tab.
MW-3664Provide the Backlog Item Key in the Backlog Item selector popup when creating a dependency between two existing Backlog Items.
MW-3663Provide a tooltip for the Stretch Item checkbox available in the Backlog Item dialog box.
MW-3615Facilitate the creation from Project Team in the Structure full screen view, Teams tab.
MW-3590Display the newly created Backlog Item when converting a Checklist item into a Backlog Item.
MW-3568Sort the Iterations by number in the Iterations List available in the full screen views left panel.
MW-3564Add an empty state in the Iteration Board (“No Backlog Item corresponds to the selected filter(s)”).
MW-3536Provide an allocation indicator for Team Members in the Iteration full screen view.
MW-3506Provide the Accepted field (with the same rules as in the Full Backlog view) in the Iteration full screen view, Backlog tab, Grid view mode.
MW-3504Rename and Improve the Team Creation commands available in the Structure full screen view, Teams tab.
MW-3043Alert the user when a Backlog Item added to an Iteration has dependencies with other Backlog Items which are not planned yet.
MW-2401Show the Predecessors Iteration in the Backlog Item dialog box, Dependencies section.

Project*

#MW-4414

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Filters dialog box, a new “No Predecessor” filter has been added to the Outline section, allowing the user to only display the Tasks that do not have any predecessor.

Note: The “No Predecessor” filter is also available in the Gantt Filters panel, including for CCPM projects.

#MW-4352

In the Labor Assignment dialog box (available from the Gantt side panel Assignments tab, for instance), the “Scheduled Start”, “Scheduled Finish”, and “Remaining Delay” fields have been added.

In addition, these fields have been included to the corresponding Fieldset, allowing users to insert them in the Project* Scheduler workspace, Resources tab, Assignment List view mode spreadsheet, and in the Task Details dialog box, Labor Assignments sub-tab.

#MW-4345

In the Labor Assignment dialog box (available from the Gantt side panel Assignments tab, for instance), the “Closed” field has been made available, allowing the user to specify if Time Tracking is possible for a specific Labor Assignment.

In addition, the “Closed” field has been included to the corresponding Fieldset, allowing users to insert the “Closed” field in the Project* Scheduler workspace, Resources tab, Assignment List view mode spreadsheet, and in the Task Details dialog box, Labor Assignments sub-tab.

#MW-4344

In the Project* Resources workspace, Project Allocations tab, Allocations view mode, a new filter has been added to the Filters dialog box to allow the user to choose whether to display Soft Allocations, Hard Allocations, or both.

#MW-4289

In Program Scheduler and Product Scheduler workspaces, Planner tab, Scheduler view mode, from now on, when using the “Create Sub-Project” command available upon clicking on a Task Gear (1-54_img_3.png) button, the dates of the created project will be automatically set as follows:

- The Start Constraint will correspond to the Task Start Date,

- The Deadline will correspond to the Task Required Date.

#MW-4230

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Manage Baselines dialog box, if the user selects Tasks before accessing the dialog box, two new options will be displayed upon clicking the “Remove Baseline” (1-54_img_4.png) button:

  • Selected Project – Removes the Baseline for the whole Project
  • Selected Tasks – Only removes the Baseline for the currently selected Tasks.

#MW-3652

In the Project* Scheduler workspace, the Billing tab will now be available even when multiple Projects have been selected. It will then feature the Overview, Grid, and Transactions view modes (Purchase Orders and Kanban view modes are only available when a single Project is selected).

Portfolio

#MW-4108

In the Capacity Planning workspace, Resources tab, when using the “Resources” filtering option, from now on, the list of Resources available for selection will only display the Resources assigned to the selected project(s).

Note: A similar behavior has been implemented in the Cost Items tab.

#MW-4001

In the Portfolio Dashboards workspace, Billing report, a new Savings view mode has been added, allowing the user to review the Savings for each project belonging to the selected Portfolio Folder(s). A similar Billing report has also been implemented in the Product/Program Consolidation Dashboards.

In addition, a new “Enable Revenues for Reporting” setting has been provided, allowing the Administrator to display the Total Revenues in the following reports:

  • Project* Dashboards, Performance
  • Portfolio Dashboards, Performance
  • Product/Program Consolidation Dashboards, Performance.
Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Billing tab.

Administration

#MW-4512

In the System Settings workspace, Project Settings folder, Display Preferences tab, Project Scheduler - Other section, a new “Enable Purchase Order Custom Sub-tab” setting allows the Administrator to display a Custom Placeholder in the Project* Scheduler workspace, Billing tab, Purchase Orders sub-tab.

#MW-4132

In the System Settings workspace, Budget/Finance Settings folder, a new option has been added to manage the Cost Reallocation to a Cost Center: “Enable Project Cost Center Cost Reallocation in %”.

When the option is deactivated, the same behavior as before will apply:

  • In the Project* Finance workspace, Budget tab, Details view mode, the user will define the Cost Center allocation by entering monetary values for each Cost Center.
  • In the Project* Finance workspace, Costs tab, Outbound view mode, the % Reallocated field will allow the user to push a portion of the Project Cost (by taking into account any Cost not associated to a Cost Center) to a hierarchically connected source object.

When the option is activated, the following behavior will apply:

  • In the Project* Finance workspace, Budget tab, Details view mode, the user will define the Cost Center allocation by entering a “Reallocation %” value for each Cost Center.
  • The “Update from Total Cost” commands (1-54_img_5.png) will no longer be available in the Project* Finance workspace.
  • The % Reallocated entered in the Project* Finance workspaces, Costs tab, Outbound view mode will no longer be restricted to the costs that are not related to a Cost Center. Instead, it will apply to 100 minus the Reallocation % set in the Budget tab.

In addition, the “Enable Project Cost Center Reallocation in %” field will be available at the project level in the Advanced Attributes dialog box > Finance tab to define the option for each project. The Administrator can define in the System Settings whether this field should be activated by default or not.

Note: This new behavior has also been implemented for systems whose “Budget Type” is set to Effort.

#MW-4066

In the System Settings workspace, General Settings folder, Display Controls tab, a new “Time Distribution Format” setting is now available, allowing the Administrator to define if the “Week” format in time-distributed views should display the weeks’ number rather than the first day of the week.

Resource

#MW-4611

In the Organization Center workspace, Overview tab, the Key Facts section will now show the time period (number of days up to the beginning of the current week) considered by this view. It is managed by the “Timesheet Retrieval Time Frame” setting.

Note: The aforementioned setting is available in the System Settings workspace, Resource Settings folder, Global Options tab.

Work Management

#MW-4112

In the Program Work Management and Product Work Management workspaces, a new Project Monitoring tab is now available if the Program or Product has at least one hierarchically connected sub-project. This view allows the user to review the sub-projects' Work Items.

Default Configuration Corrected Issues

Project*

#MIL-20

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Filters dialog box (accessible upon clicking on the Filters (1-54_img_6.png) button of the Gantt toolbar and then selecting the “Open Filters Dialog” option), the “Problems” label of the Sections list (located on the right-hand side) could disappear if some filters were activated in the “Problems” section. This issue has been fixed.

#MIL-19

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Problems side panel, when activating a filter in the CCPM (Planning) problems panel and then selecting the “Reset Filters” option (available upon clicking on the Filters (1-54_img_7.png) button of the Gantt toolbar), the chip button for the corresponding filter was still displayed as activated although the filter itself was deactivated as expected. This issue has been fixed.

#MW-4635

In the Project* Finance workspace, Costs tab, Forecast view mode, when the project's “Forecast Labor Type” option was set to “Effort” and when no Pivot was selected, clicking on the “Update from Total Effort” command resulted in the creation of a row with no Effort values. This issue has been fixed.

#MW-4634

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Task Comments popup (accessible upon clicking on the Task Comments icon (1-54_img_8.png) available in the Gantt side panel header for instance), long comments were not properly displayed. This issue has been fixed.

#MW-4618

In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, when converting a Backlog Item into a Task, it was created at the end of the Tasks list rather than as a child of the selected task. This issue has been fixed.

#MW-4605

In the Project* Scheduler workspace, Tracking tab, Detailed Approval view mode, the “Show Parents” chip was too wide for the label. This issue has been fixed.

#MW-4581

In the Project* Scheduler workspace, Tracking tab, Approval Overview view mode, when the “Display Resources” option is deactivated, the “Applied Effort” indicator was red if all Timesheets were applied and some more actuals were entered manually. This issue has been fixed.

#MW-4572

In the Project* Dashboards workspace, when using the Report Launcher feature, the Deliverable Supervision report Details section did not display the proper title for the report. This issue has been fixed.

#MW-4568

In the Idea Center workspace, Analytics view mode, Indicator Matrix sub-tab, there was no empty state to indicate that no scoring values were entered for the selected Folder(s) Ideas. This issue has been fixed.

#MW-4567

In the Project Center workspace, Connections tab, scrollbars could appear in the cards when the Name of a project was too long. This issue has been fixed; from now on, the Name will be truncated.

#MW-4564

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Agile tab of the Gantt side panel, the font size of the empty states differed. This issue has been fixed.

#MW-4563

In the Project* Dashboards workspace, Project Dashboard report, Risks section, some column titles were not centered. This issue has been fixed.

#MW-4558

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when importing a new Iteration with Team Members assigned, the resulting assignment Rate did not match the “Default Assignment Rate” entered in the “Edit Team Member Information” popup (accessible from the Iteration full screen view, upon clicking on a Team Member card More (1-54_img_9.png) icon and then selecting the “Edit” option). This issue has been fixed.

Note: Similarly, the Default Assignment Rate of an Iteration Team Member was set to 0h/d by default; it has been modified to match the Resource Default Rate.

#MW-4550

In the Project* Scheduler workspace, Tracking tab, in the Time Navigation toolbar, the “Custom” interval option was displayed even when the “Enable Custom Interval” setting was deactivated. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Resource Settings folder, Global Options tab, Validation Options section.

#MW-4548

In the Project* Finance workspace, Connections popup (accessible upon clicking on the Connections (1-54_img_10.png) button in the Key Facts), an unwanted scrollbar was displayed when the Manager 1 Name was too long. This issue has been fixed; from now on, the Name will be truncated.

#MW-4546

In the Project* Finance workspace, Costs tab, Forecast view mode, the “Show Total Cost” display option label was displayed even if the Forecast Labor Type was set to “Effort”. This issue has been fixed.

#MW-4545

In the Project* Dashboards workspace, Budget report, Legend popup (accessible upon clicking on the Legend (1-54_img_11.png) icon located in the bottom right corner), the “Costs” chip was displayed even if the Budget Type was set to “Effort”. This issue has been fixed.

#MW-4516

In Program Scheduler workspace, Planner tab, Scheduler view mode, Gantt side panel, Dependency tab, when accessing the Project full screen view of a dependency (by clicking on the “Jump To” button), and then closing the full screen view, the user was brought to the Master Planning workspace instead of going back to the Program Scheduler. This has been fixed.

#MW-4511

In the Project Dashboards workspace, Baseline Comparison report, it was not possible to navigate through the view modes with the view mode icons. This issue has been fixed.

#MW-4504

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt side panel Problems section, Work Objects whose Estimated Date fell outside the Related Task boundaries, or with an Estimated Date falling before the Related Task Finish date, were not taken into account in the Work Objects problems. This issue has been fixed.

Note: Similarly, the Work Object card did not display a red dot when those problems occurred. This issue has been fixed as well.

#MW-4499

In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, the icons of the “Accepted” column were not properly displayed when the user was logged in German. This issue has been fixed.

#MW-4476

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when fulfilling Generic Resources by using the Gantt toolbar “Fulfill Generic Resource” command (available upon clicking on the Assign (1-54_img_12.png) button), if the selected Tasks had other assignments before the action, these assignments could be wrongly deleted during the fulfilling process. This issue has been fixed.

#MW-4454

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when selecting a Task linked with an Agile Iteration in the Gantt spreadsheet, the corresponding Iteration Team section in the Agile tab of the side panel could display an unwanted vertical scroll bar. This issue has been fixed.

#MW-4442

In the Project* Resources workspace, Project Allocations tab, if the allocations were set in FTE, after capturing snapshots, the data was not saved properly. This issue has been fixed.

Resource

#MW-4602

In the Resource Dashboards workspace, Time Tracking Statistics report, Time Tracking Details view mode, the first two rows of the spreadsheet were frozen, which included the Name of the first resource in the list, while only the header should have been frozen. This issue has been fixed.

#MW-4490

In the Resource Validation workspace, Timesheets tab, Details view mode, Timesheets on Closed Tasks with no Effort values were not displayed; it could be confusing if other Timesheets were Reviewed or sent back for Rework, because the Status of the whole Resource Timesheet, as shown on the left panel, was not aligned with the Status of the Timesheet on open Tasks displayed on the right section. This issue has been fixed.

Note: Closed Tasks will be labeled “(Closed)” to highlight them.

Portfolio

#MW-4641

In the Master Planning workspace, upon accessing the Project Details in the side panel (upon clicking on the “Details” label of a project card), a scroll bar was displayed if the name of the project was too long. This issue has been fixed.

#MW-4633

In the Portfolio Dashboards workspace, Filters dialog box, when adding a Custom section, the Fields could not be properly displayed. This issue has been fixed.

#MW-4526

In the Master Planning workspace, when creating a new Master Planning, the “Create” button in the creation popup had no effect if the “Enable Define Process” setting was deactivated. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Project Creation Options tab, Project Mode section.

#MW-4505

In the Portfolio Simulation workspace, when capturing a new scenario, the Project Nature Parameters Workflow State filters for each project Nature did not work properly. This issue has been fixed.

Execution

#MW-4637

In the Calendar workspace, when creating a new “Work” Type of event to replace a Non-Work event (vacation or else), and vice versa, two lines were displayed for the same event in the “Summary” spreadsheet of the Calendar Details popup (accessible upon clicking on the “View Details” button located in the top right corner of the view). This issue has been fixed.

#MW-4569

In the Overview workspace, the chart listed all the projects the logged-in user was assigned to, even if there was no Total Effort for the next three months. This issue has been fixed.

Work Management

#MIL-15

In the Work Package Center workspace, Contract tab, Contract Changes view mode, in the Deliverables popup (accessible upon clicking on the Deliverables (1-54_img_13.png) tile of the Info Stack), the Assignees view mode did not have an empty state when there was no Deliverable attached to the selected Work Package. This issue has been fixed.

#MW-4612

In the Project* Work Management workspace, Work Items tab, Work Items full screen view, an unwanted scrollbar could be displayed in the Quick Filters section when all the chips were activated in French, German, and Spanish. This issue has been fixed.

#MW-4559

In the Work Package Center workspace, Contract tab, Contract Changes view mode, the icon for Deliverables changes was not up-to-date with the new design. This issue has been fixed.

#MW-4557

In the Work Package Center workspace, Contract tab, Work Package Contract Details popup (accessible though the Contract History dialog box, upon clicking on the Details (1-54_img_14.png) button for an entry), the Deliverables section was not up-to-date with the latest Work Management design. This issue has been fixed.

Note: Deliverables from entries captured before 7.1z will not display the Key, Workflow State, and Assignee Picture values as they did not exist in the Work Package Deliverables History category prior to this version.

#MW-4543

In the Work Package Center workspace, Contract tab, Contract Changes view mode, Deliverables popup (accessible upon clicking on the “Deliverables” (1-54_img_15.png) tile of the Info Stack), there was no Empty State displayed if the selected Work Package did not have any Deliverable. This issue has been fixed.

#MW-4534

In the Project* Scheduler workspace, Status Reports tab, when displaying a full Status Report, the Risks section’s “Owner” field mistakenly displayed the name of the “Initiator”. This issue has been fixed.

Note: Only Status Reports submitted after 7.1z will benefit from the fix.

#MW-4527

In the Template Center workspace, in the Advanced Attributes dialog box, the “Work Items Attributes” section title was incorrect. This issue has been fixed.

#MW-4493

In the Project* Work Management workspace, Risks tab, Homepage view, Project Information panel, the “Cost Impact” value was taking into account the Cost values of Closed Risks. This issue has been fixed.

Administration

#MIL-18

In the System Data workspace, Work Objects tab, the Work Items sub-tabs were available even if the corresponding settings were deactivated. This issue has been fixed.

Note: The aforementioned settings are available in the System Settings workspace, Work Management Settings folder, Work Items tab.

#MW-4617

In the Designer, Forms view, when trying to edit the “Project Dashboards (Dashboards)” form, an error occurred and no preview was generated. This issue has been fixed.

#MW-4588

In the System Settings workspace, General Settings folder, Meta Settings tab, the “Activate Master Planning” setting was available even if the “Activate Dependencies” meta setting was deactivated. This issue has been fixed.

Note: The same issue has been fixed for the “Enable Dependency Creation” setting available in the Project Settings folder, Global Options tab, Connections sub-tab.

#MW-4571

In the System Data workspace, News Page tab, Activity Stream folder, the tooltips for the “New” and “Delete” commands mentioned the Cost Centers instead of the Activity Stream. This issue has been fixed.

#MW-4529

In the System Settings workspace, General Settings folder, Meta Settings tab, when deactivating the “Activate Status Report” setting, some Status Report-related elements were still available throughout the solution. This issue has been fixed.