This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1r either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 7.1r is a maintenance release of ProjectAdvantage 7.1.

In the Core product, 4 enhancements have been implemented, and 18 issues have been fixed.

In the ProjectAdvantage Default Configuration, 9 enhancements have been provided and 31 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the different sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
  • As a reminder we only support SAML SSO since January 2019. Consequently we have removed "Windows SSO" and "CAS SSO" in the Designer in the list of Authentication type in this release. Please refer to #41724 for further information.
  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs : we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Built-in HTML5 Client

#41724

Windows SSO and CAS SOO are no longer supported. Existing databases using these SSO authentication types will have SSO authentication disabled upon upgrade.

Field Edits (Field Types)

#41246

We now have a special processing to reduce the data usage and improve performance (when a JPEG or PNG formatted image was uploaded) in workspaces that contained images. A JPEG will now be downscaled to fit within a 1920x1080 pixel window, and then compressed to 50% quality. A PNG will also be optimized in the same way and converted to a JPEG, only if the size of the original image is greater than 500KB.

Performance

#40075

In addition to the blank row in the Gantt grid, there is a new button to aid in task creation: “+Add More Tasks”.

When this button is clicked, 10 new tasks are inserted at the end of the project. The insert is animated (similar to the Insert Before/After of the context menu), when the project is not empty.

When new rows are created, the hierarchical cell in the first new row created is selected. The hierarchy cell is usually the Name column, but when the Name column is not present, cell selection should default to whichever column has the expand/collapse controls. This smart cell selection only occurs when the project is not empty.

Keyboard navigation to and from the new button is also possible. When in the last row, pressing the down arrow from any cell will focus the button, and pressing the up arrow will return the cell selection to the cell that was previously selected. Using Tab from the last cell in the last row will focus the button and the Shift+Tab will return selection to the last cell in the last row.

Pressing Enter or Space when the Add More Tasks button is already focused will perform the button action. 1-46_img_0.jpg

UI Blocks

#41640

There is a new option in the Workflow dropdown of the Swimlane Block editor in the Designer for allowing the product to select which workflow to use for displaying columns in the Swimlane Block. This option is denoted as “<Data Driven>”. If multiple Workflows are detected in the data an error message will be displayed in place of the Swimlane in the HTML5 client. 1-46_img_1.png

Core Product Corrected Issues

Built-in HTML5 Client – Modified on Nov, 18 2019

#41798

There was an underlying problem in ProjectAdvantage which means that any given build could have unexpected behavior at runtime when using Firefox 67. The most extreme example of this behavior was, being unable to navigate to the login screen. This has been fixed.

#41000

Not individually salted but hashed passwords were stored locally. This has been fixed. Internally authenticated passwords saved in session storage are now individually salted/encrypted.

#41015

Environment information displayed on in the About Box could be displayed by any user. This has now been fixed and only users that can log into designer will have access to view and save the Environment information. This is either the built-in psnextadmin account or a user with the Configuration Object right.

Commands

#41860

Partial reload specified in the Designer was not taking into account the form overwrites. Prior to 7.1p, the only negative effect of this problem was that the entire workspace was reloaded when only a partial reload should have occurred. With the 7.1p release, the default behavior changed into no reload when trying to execute a partial reload on an overwritten form. This problem has been fixed so that the partial reload accounts for form will be overwritten.

#40993

The Auto Reset Passwords command did not check to make sure that the user (executing the command) actually had permissions to modify User objects. This has been fixed.

#39955

If a work package was selected (in a Selector) and no tasks were selected, the inserted template was added to the end of the project instead of being added at the end of the work package. This has been fixed.

Designer

#41865

If a form was imported via cfg, then it was possible that after cfg import the form used the wrong Honored Category. This has been fixed.

#41420

The “Type Filter” column (in the grid) of the Transaction tab in the Types view of the Designer did not provide a drop down list of choices and would not accept any input. This has been fixed.

Field Edits (Field Types)

#41864

If a value list was requested from a Pick List popup, selections were not being added to the request. This was important if the value list required selections to evaluate. This has been fixed.

Localization

#41557

Bidirectional (mixed right-to-left and left-to-right) text did not work properly in Chrome, and the left-to-right parts of the text would be displayed backwards. This has been fixed.

Object Edits (Data Categories)

#41799

An “ERROR: cross-database references are not implemented” error was encountered when a customer was using “external” data views (data views whose “Domain override” was set to something besides “<None>”). After a server restart, the error would not occur until the Designer application run. This has been fixed.

#41457

If performance logging was not turned on, the user may have encountered a NullPointerException error when executing a named command list (that could have been processed solely on the server). This has been fixed.

Performance

#41805

A regression in 7.1p caused a memory leak which had a tendency to grow as projects were edited. This has been fixed.

#41716

A regression caused some data view related command lists (Named command lists) to execute much slower. This has been fixed.

UI Blocks

#41876

Several issues have been fixed. The first one is a typo in the error message that occurred when a user pasted more than the required number of max rows. The second fix is related to Pasting into a gantt, that had refresh-on-select enabled Indeed, it caused an extra and unnecessary server request to be executed.

#41803

Under high concurrency, some workspaces (that were displaying assignment or task data, given a selected organization or resource) might have displayed incorrect values. This has been fixed.

#40960

When the collapsed state changed for an element in a Text Block, such that the vertical scrollbar was no longer required, the header for the Text Block was not being resized like the body (to account for the vertical scrollbar being removed). This has been fixed.

Default Configuration Enhancements

Agile Redesign

The Agile feature redesign is the flagship enhancement of ProjectAdvantage 7.1r default configuration. The Scheduler Agile tab offers a brand new experience for Product Owners, Scrum Masters, and Agile Team Members; Agile-related data and functionalities are where needed, when needed.

In addition to the previous version capabilities, we introduced new elements to offer a smart and proactive experience, where the User Interface adapts to the state of the selected objects:

  • All-in-one tab: All the Agile information, included Dashboards, are directly available in the Project* Scheduler workspace, Agile tab.
  • Smart Timeline: The Homepage displays an interactive timeline to always keep an eye on the previous and the upcoming iterations.
  • New KPIs: To help the Teams deliver on time, we now provide relevant alerts and indicators such as the Defect Removal Efficiency and Cycle Time.
  • Four Backlog Item Types: In addition to Stories and Defects, ProjectAdvantage now offers two new Backlog Item types: Issues and Tasks.
  • New Tools: Backlog Items can now benefit from the Checklist and the Connection features, making it easier to manage sub-elements.
  • Migration Tool: The Administrators will be able to transition from the previous Agile model to the new one whenever they are ready, directly from the System Settings workspace, Agile Settings folder.
Note: For legacy purposes, the previous Agile workspaces and functionalities are still available. Their use is conditioned by the “Activate Agile Legacy” meta setting.

Tickets that have been resolved with the Agile Redesign

Jira Ticket #Description
MW-2780Kanban: Provide condensed cards to see more items without scrolling
MW-2294Keep attached the Defects to a User Story in order to manage defects by user story if needed
MW-1871Give the capability to a team member to detail a user story in several tasks before auto-assign on this task and update activity log
MW-1835Provide a new project creation process for Agile project
MW-1531Define a default Iteration Duration at the product level so that the system suggests the Start and Finish dates upon creating an Iteration
MW-1533Provide the ability to import Agile Team Members from users that have been assigned to a Task that has been synchronized to an Agile object
MW-1532Provide a view to easily manage all Backlog Items assigned to a product backlog.
MW-1483Provide the ability to automatically import the Agile Team Members to create the Team (rather than selecting the users individually)
MW-1192Allow the user to update the Workflow State Vote of the Issues with a Kanban view
MW-1191Move a Backlog Item to another project
MW-1149Synchronization: Enhance the Details popups to always provide access to the relevant views
MW-657Update the filtering options design in the Dashboards
MW-275Provide the ability to create Task directly from the swimlane

Project*

#MW-3330

The Status Report Preferences previously available in the Project Information dialog box, Status Report Preferences sub-tab have been moved to the Advanced Attributes dialog box, Status Report Preferences folder.

#MW-3268

It is now possible to set the "Calendar" field during the "Basic Attributes" step of the project creation process.

#MW-3188

In the following views, the "Export to Excel" option has been disabled as the structure of these screens is not compatible with a spreadsheet structure:

  • Project* Dashboards workspace, Project* Dashboard, Evaluation, and Performance reports
  • Project* Center workspace, Evaluation tab, Descriptions sub-tab
  • Both Project* and Work Package Status Reports, printable version

#MW-1628

In the Assign Resources dialog box, a new Search (1-46_img_2.png) field has been added, allowing users to enter directly the name of a resource to filter the Resources list. Once a value has been entered, the "Enable Filters" button is activated (blue) and users can either click on the Active Filters "X" icon or remove the value in the Search field to display the full Resources list.

Note: This new feature has been implemented in the following dialog boxes: Assign Resources (multiple), Assign Cost Items (mono and multiple), Fulfill Allocation Request, and Fulfill Resource Request.

Portfolio

#MW-3242

In the Portfolio Dashboards workspace, all the Dashboards (with the exception of the Pipeline report) now feature two new filtering options in order to only display projects that would finish before or after a specific date. This change has also been applied to the Portfolio Simulation workspace, after playing a scenario.

#MW-2539

In the Portfolio Center workspace, Project Supervision tab, in the Portfolio Ranking workspace, Portfolio Simulation (Simulation view) workspace, and in the Portfolio Dashboards workspace, the Workflow State filter has been improved so that multiple states can be selected at the same time.

Administration

#MW-3240

In the System Settings workspace, Project Settings folder, Display Preferences tab, the "Enable Project Center Outcome" setting has been moved from the Project Scheduler - Roadmap section to the Project Center one. As a consequence, the Outcome section in the Project* Center workspace and the Outcome sub-tab of the Project Information dialog box are no longer conditioned by the "Enable Roadmap" setting but only the "Enable Project Center Outcome" one.

#MW-1810

In the Project Administration workspace, the "Locked" field is now available in the field set for the users to add to the spreadsheet. By using the "Locked" and "Locked by" fields, Administrators can now easily identify locked projects.

Note: This new "Locked" field being exposed, the user can now type "locked" in a project selector filter to only display locked projects in the selector.

Execution

#MW-3283

In the Timesheet workspace, there will now be a warning displayed at the bottom of the screen to let the user know that after entering Actual Effort at the weekly level, the values will be spread evenly across the seven days of the week. This warning will only be displayed if the corresponding settings have been set so that a user may switch between a daily and a weekly view.

Default Configuration Corrected Issues

Project*

#MW-3335

In the Project* Work Management workspace and Work Package Work Management workspace, Work Items tab, the display was not immediately refreshed after activating a filter (“Enable Filters” button). This issue has been fixed.

#MW-3315

In the Project* Finance workspace, Costs tab, Overview view mode, the spreadsheet Start and Finish distribution dates did not take into account Transactions which occurred outside of the project duration dates. It created a discrepancy between the Key Facts section and the spreadsheet Total Cost values. This issue has been fixed.

#MW-3307

In the Project* Finance workspace, in the Snapshot History dialog box and Snapshot Details popup, the Inbound and Outbound sub-tabs were still displayed even for projects with no Contract. This issue has been fixed.

#MW-3304

In the Template Center workspace, when creating a new template, in the "Create a New Template” popup, the "Next" button could remain unavailable under certain conditions, preventing the user from creating a new template. This happened when the "Enable Type Verification" option was activated. This issue has been fixed.

#MW-3295

When navigating in the Project* workspaces, a "Valid Values List Error" could occur randomly. This was caused by the fact that some temporary fields were not reset after creating a project, canceling a project creation, or closing the project creation popup at any step of the process. This issue has been fixed.

#MW-3272

In the Project* Scheduler workspace, in any Gantt charts and spreadsheets available in the workspace tabs, when inserting the "Flagged" column, a text field was displayed instead of a boolean one, forcing the user to enter the text "yes" to flag a task. This issue has been fixed.

#MW-3267

In the Project* Scheduler workspace, Planner tab, after creating a project from a template containing some Generic Assignments, when using the Gantt toolbar "Fulfill Generic Resource" command (available when clicking on the Assign Resources (1-46_img_3.png) icon), the prompted "Project Generic Resources" list did not display the Generic Resources from the Template. This issue has been fixed.

#MW-3223

In the Project* Dashboards workspace, Budget report, when the "Cost Centers" display option was activated, under some conditions, the summary line of a cost center could not be collapsed. This issue has been fixed.

#MW-3220

In the Program Finance workspace, Costs tab, the wrong tooltip was displayed for the Inbound view mode. This issue has been fixed.

#MW-3219

In the Project* Scheduler workspace, Theater tab, the Gantt view was displaying both the Start and Finish dates for Milestones. This issue has been fixed; from now on, only the Finish date will be displayed for milestones.

#MW-3218

In the Project* Finance workspace, Costs tab, the chart could display incorrect values when the "Cost Centers" display option was activated. This issue has been fixed.

#MW-3217

In the Project* Finance workspace, Costs tab, some refresh issues could occur when switching view modes. This issue has been fixed.

#MW-3215

In the Project* Finance workspace, Costs tab, Overview view mode, when exporting the spreadsheet to Excel, the content of the resulting Excel file could be incomplete. This issue has been fixed.

#MW-3206

In the Project* Finance workspace, Budget tab, Work Packages view mode, the Budget of a Work Package was still editable even if the Work Package Contract was not editable. This issue has been fixed.

#MW-3194

In the Project* Scheduler workspace, Dependencies tab, in some cases, the Synchronization command was still shown even if all values had already been synchronized. This issue has been fixed.

#MW-3137

In the Project* Scheduler workspace, Tracking tab, after applying actuals, if the timesheet was then sent to be reworked, and if the resource submitted zero effort instead of previously non-zero effort, applying these new actuals had no effect on the labor assignment actual effort, meaning that the previous actuals remain applied. This issue has been fixed.

#MW-3123

In the Project* Scheduler workspace, Planner tab, it was not possible to fulfill a soft assignment on a Hammock task. This issue has been fixed.

Resource

#MW-3326

In the Resource Dashboards workspace, Resource Capacity report, the "Hide Resources without Project Specific Capacity" switch button was always displayed, even if the all settings enabling the Resource Acquisition methods were deactivated. This issue has been fixed.

#MW-3309

In the Resource Allocations workspace, Hard Allocations tab, in the Edit Allocations dialog box (accessible upon clicking on a Gear (1-46_img_4.png) icon at the project level and selecting the Edit Allocations command), clicking on the "Allocations Details" (1-46_img_5.png) button of an Allocation Request prompted an empty popup. This issue has been fixed.

#MW-3291

In the Resource Allocations workspace, Team Assignments tab, in the Resource Allocations dialog box (accessible upon clicking on the "Manage" link), the "Show Availability" filtering option was not available, forcing users to go back and forth to "Hard Allocations" tab to modify the filter. This issue has been fixed.

#MW-3199

In the Resource Dashboards workspace, Cost Items Utilization report, when a Cost Item had a different unit than "ea", the summary line of the Cost Item was displaying the wrong unit. This issue has been fixed.

#MW-3166

In the Resource Commitments workspace, when trying to submit a RM submitted request, two successive product dialog boxes, as well as a green flash message, were incorrectly prompted. This issue has been fixed.

Note: Every flash message and dialog box throughout the Requests & Commitments process has been reviewed to prevent any confusion. Also, some flash messages were removed from the solution (for example in the Resource Allocations process, or in the Work Management workspaces); the rule established is that if a status change can be witnessed on screen, no flash message is needed.

#MW-3128

In the Organization Center workspace, the Overview tab has been optimized.

#MW-3047

In the Resource Dashboards workspace, Resource Utilization report, some performance issues could be encountered. This issue has been fixed; the view has been optimized.
>Updated: 07/03/2019

Portfolio

#MW-3297

In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, when displaying both Total Cost and Forecast Cost, there were two different sub-sections of Business Case Costs displayed (one for Business Cases with Forecast Cost, and one for Business Cases with Total Cost). This issue has been fixed; from now on, only one Business Case section per Cost Center will be displayed.

#MW-3290

In the Portfolio Dashboards workspace, Roadmap report, when clicking on the "Problems" icon for a project, the corresponding Project full screen view was not displayed. This issue has been fixed.

#MW-3252

In the Portfolio Dashboards workspace, Roadmap report, the Gantt chart displayed the “Baseline 1” instead of the “Current Baseline”. This issue has been fixed.

Note: A new "Baseline" display option has been added to the report, allowing the user to select the Baseline to be displayed in the Gantt chart. This option has also been added to the Report Launcher "Specific Filters" section.

Administration

#MW-3334

In the System Data workspace, Cost Centers tab, the "Monetized Amount" display option was not working. This issue has been fixed.

#MW-3274

In the System Data workspace, Cost Centers tab, when creating a new Cost Center, the "Type" field value automatically set for the new Cost Center was always the one set in the "Default Budget Type" option (System Settings workspace, Budget/Finance Settings folder), even if the "Type" filtering option was set to another value. As a consequence, the newly created line was not displayed until the user modified the "Type" filtering option. This issue has been fixed.

Work Management

#MW-3335

In the Project* Work Management workspace and Work Package Work Management workspace, Work Items tab, the display was not immediately refreshed after activating a filter (“Enable Filters” button). This issue has been fixed.

#MW-3319

In the Portfolio Work Management and Project* Work Management workspaces, Risks tab, the "Contingency Plan" field was misspelled. This issue has been fixed.

#MW-3294

In the Work Package Scheduler workspace, Planner tab, when creating a Deliverable from the Task panel, Deliverables tab, the Deliverable was not displayed in the Work Package Work Management workspace. This issue has been fixed.