This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 7.1L either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 7.1L is a maintenance release of ProjectAdvantage 7.1.

In the Core product, 2 enhancements have been implemented, and 9 issues have been fixed.

In the ProjectAdvantage Default Configuration, 34 enhancements are provided and 19 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the differents sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Looking forward to strengthening our Unique Technology Stack, we have decided to focus our quality, testing and support to the English version of Tomcat exclusively. While ProjectAdvantage will continue to work on non-English versions of Tomcat, we will no longer test those versions nor offer support in case issues occur. This decision is transparent for SNet and SVA users. IT departments that have deployed ProjectAdvantage on premise using a non-English version of Tomcat are invited to use an English version.
  • Config Utility Backup files (CUB zip files) are used as a mean to backup a customer's databases into a .zip file so that it could be restored on another system regardless of the database vendor used in the source and target systems. Since January 1st, 2018 ProjectAdvantage exclusively supports PostgreSQL databases and therefore the need for having a capability to exchange data across different database vendors is no longer needed. As a consequence the CUB export capability is now deprecated, it will continue to work but will be removed in a future release. The CUB import capability will continue to be supported as it is a means to “import” databases from customers that are not currently using Postgres.

Core Product Enhancements

Object Edits (Data Categories)

#40930

When setting Remaining Effort (which includes setting Total Effort), the Labor Assignment's Rate will be set from the Remaining Effort.

#40896

A designer can now add a managed Organization reference field to a Project data view. Project data view records with a managed Organization reference field will be automatically filtered when an Organization is selected. This is the same behavior that exists with a Global data view with a managed Organization reference field.

Core Product Corrected Issues

Commands

#40820

When setting Initial Values for a created hard Assignment including setting the Rate, the Rate was not taken and the Resource’s Default Rate was being used. This has been fixed.

#40676

Local selections were not made global when executing the link command. This was happening as expected when the link brought a user to a new workspace perspective, but not when the link navigated within the same perspective. This behavior only applied when the link's context parameters was set to “Update from click”. This has been fixed.

Localization

#40386

Text blocks could become incorrectly positioned upon clicking when logged in using Hebrew. This has been fixed.

#39798

When logged in to the HTML5 Client using the Hebrew language, the grid portion of some Gantt blocks was not displaying correctly and was blank. This has been fixed.

Object Edits (Data Categories)

#40978

When user was editing a value from a project dataview record, the value wasn’t correctly reflected in the published version of the project. Some data in the cache were not removed. This has been fixed.

Printing

#40793

When a user exported a gantt chart as SVG, a bit of the gantt chart span bar from the time axis overlapped with the task rows. This has been fixed.

#40698

Hovering over Workflow, Network, and Outline blocks in a popup provided a Gear icon for printing, even though we currently do not support printing blocks in popups. This has been fixed and the Gear icon no longer comes up.

#39999

When exporting very large Network diagrams to PDF, if the diagram was too large, then it will be exported on more than one page despite being specified to print on a single page. This has been fixed such that it will be downscaled to fit on one page.

UI Blocks

#40003

Global data view records with managed project reference fields would disappear from the display after any edit or a browser refresh. This would NOT happen if the designer deleted the “_Version_IID” column after adding the project reference field as a “managed” column (and this is commonly done because designers want the data view records associated with any version of a particular project instead of being associated with a particular version). This has been fixed.

Default Configuration Enhancements

Resource Allocations

The Resource Allocations feature is one of the three capacity acquisition capabilities provided by ProjectAdvantage, and it has been entirely reviewed in ProjectAdvantage 7.1L. The main modifications are the following:

  • New Resource Allocations workspace (to replace the Team Allocations and Project Allocations workspaces)
  • New Allocation Requests feature
  • Reviewed Project Resources workspace, Resource Allocations tab
  • New Request Mode field (renamed Resources Origin) for the selection of the capacity acquisition capability.

Tickets solved with the Resource Allocations review

MW-1777MW-1494MW-1486MW-1196MW-1066
MW-1065MW-1064MW-945MW-935MW-839
MW-248MW-45MW-2442 (Issue)

Assign, Fulfill & Replace Resources

#MW-2596

In the Project* Scheduler workspace, the Assign, Replace, and Fulfill Resources, and the Cost Items dialog boxes have been completely redesigned. Aside from a new look&feel, the main changes are the following:

  • To allow the user to edit the newly created Assignments directly from the dialog box
  • To allow the user to easily compare the original situation (for Replace and Fulfill) with the newly selected Resources/Cost Items
  • To access information from the Resource Brief
  • To provide smarter options when fulfilling Soft Assignments or replacing Hard Assignments with multiple Resources:
    • Split Effort equally: The Original Effort of the Allocation Request is split among all New Allocations
    • Respect Usable Effort: The new Allocation is created with Allocated Effort equal to the Usable Effort of the Resource
    • Remaining Original Effort: The new Allocation is created with Allocated Effort equal to the Gap
Note: Similar changes have been made to the dialog boxes to commit Resources from the Resource Commitments workspace.

Other tickets solved with the Assign, Fulfill, & Replace Resources dialog box review

MW-1627MW-1160MW-1238

Report Launcher

#MW-2595

Most of the Default Configuration Dashboards feature different filters and display options. Yet, the previous design was making it mandatory to run the reports once before taking advantage of these options. This was particularly problematic for dashboards allowing the selection of multiple objects and for views consolidating a lot of data (like Portfolio and Resource Dashboards).

To take into account these issues, it is now possible to activate Report Launchers in the Project* (*), Portfolio, and Resource Dashboards workspaces (upon switching on the corresponding setting for each one of them in the Dashboards tab of their respective Folders within the System Settings workspace).

When active, the Dashboard tabs are hidden and users have to go through the Report Launchers motion. They have been designed to guide the user through a four-step process:

  • Select the scope (Organizations or Portfolio Folders)
  • Select the report
  • Set the filters
  • Launch the report (or download them as XLS for Custom Reports)

Additionally, the Report Launchers allow for a seamless integration of the Custom Reports when defined from the next Custom Reports tab of the System Data workspace.

>Note: (*) The Program/Product Consolidation Dashboards workspaces reports have been integrated into the Program/Product Report Launchers. Furthermore, the CCPM Dashboards will also be available in the Project* Dashboards workspace > Report Launchers when a CCPM Project is selected.

New Display Options Pattern

#MW-2594

Across the Default Configuration, screens have been reviewed so that the following options are now consistently displayed as Chips, on the right-hand side of the main toolbar (top line):

  • 1-40_img_0.png Group By
  • 1-40_img_1.png Sort By
  • 1-40_img_2.png Show/Hide Completed/Closed/Archived Items
  • 1-40_img_3.png Show/Hide Parents
  • 1-40_img_4.png Show/Hide Charts

Aside from consistency, the new pattern offers the following advantages:

  1. Look & feel: The pattern feels much more modern and will be easily identified by the users
  2. Tooltips: They provide more info about each option
  3. Performance: As commands are involved with the Chips, partial loading has been implemented wherever possible
  4. Space: Compared to the previous format for the corresponding options, several dozens of pixels are saved thanks to the new approach

Billing Feature

The Billing feature aims at providing all the tools for managing the revenues from Billable tasks and transactions.

#MW-2593

The Default Configuration has been enhanced to support the following features:

  • Billable vs Non-billable Tasks
  • Billing modes: Time & Material, Fixed Price, or Hybrid
  • Project-specific Billable/Revenue Resource Rates
  • Manage Purchase Orders
  • Billing Forecast Reports

They have been made available through the following views:

  • Project* Scheduler workspace, Billing tab
  • Project* Dashboards workspace, Billing tab
  • Portfolio Dashboards workspace, Billing tab
  • Project* Center workspace, Definition tab, Billing section

The activation of these features is primarily controlled by a new meta-setting (Activate Billing) available in the System Settings workspace, General Settings section, Meta-Settings tab.

Note: This setting also conditions the Billing tab available in the Project Settings folder.

Project*

#MW-2599

In the Project* Scheduler workspace, Planner tab, in the Gantt toolbar, there were two different icons to use the link feature: Link (1-40_img_5.png) and Multiple Links (1-40_img_6.png). They are now merged into one.

#MW-2529

In the Project* Scheduler workspace, Status Reports tab, the Status Report History dialog box now takes advantage of the Display Control preferences. The “Set Max. Number of Advanced Cards” setting is now used to determine the maximum number of elements to display.

#MW-2446

In the Project* Finance workspace, a new Custom tab has been added so that Administrators can use Overwrites to display their own customized forms.

#MW-2244

In the Project* Scheduler workspace, Tracking tab, a warning flash message is now displayed when approving or applying a timesheet with Actual Effort entered on closed Tasks.

#MW-2208

In the Project* Scheduler workspace, Tracking tab, Overview view mode, the tooltip of the Applied Effort indicator has been reviewed and a new indicator has been created for Planned Effort comparison.

#MW-2207

In the Project* Scheduler workspace, Tracking tab, Overview view mode, the Actual effort header has been renamed “Total” to clearly indicate that this column represents the total actual effort entered on the timesheet.

#MW-2114

In the Project* Scheduler workspace, Planner tab, a new Custom button has been added to the Gantt toolbar so that the Administrators can use overwrites to provide access to their own commands.

Note: The Custom button will only be displayed if the corresponding setting has been activated in the System Settings workspace, Project Settings folder, Display Preferences tab.

#MW-1898

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Task side panel, Deliverables tab, the Deliverables are now sorted by Name.

#MW-1877

In the Project* Scheduler workspace, Theater tab, when the "Baseline" display option is enabled, the user is now able to specify the Baseline to be displayed.

Resource

#MW-2275

In the Resource Dashboards workspace, Resource Capacity tab, Overview view mode, the user can now display a chart showing the combination of Dedicated Effort, Allocated Effort, and Committed Effort compared to Available Effort and Total Effort for the Resources of the selected Organizations.

#MW-2244

In the Resource Validation workspace, Timesheets tab, a warning flash message is now displayed when submitting or reviewed a timesheet with Actual Effort entered on closed Tasks. >Note: A similar modification has been implemented in the Execution Timesheet workspace. A warning flash message is now displayed when submitting a timesheet with Actual Effort entered on closed Tasks.

#MW-2061

In the Resource Commitments workspace, Grid and Resource view modes, the filter options have been updated for a more consistent design.
>Note: The same modifications apply to the Project* Resources workspace, Resource Requests tab.

Portfolio

#MW-1963

In the Portfolio Dashboards workspace, Overview tab, a new “Show Closed” display option is available to allow the user to show or hide closed projects.

Administration

#MW-2486

In the Corporate Dashboards and System Dashboards workspaces, Custom tabs have been added so that Administrators can use Overwrites to display their own customized forms.

#MW-2350

In the Project Administration workspace, when adding new columns in the spreadsheet, the “Locked by” project field was not available. This change has been implemented.

Work Management

#MW-2475

In the Project* Work Management, Portfolio Work Management, and Work Package Work Management workspaces, the user can now show or hide closed items in the Overview view mode.

Default Configuration Corrected Issues

Project*

#MW-2506

In the Project* Scheduler workspace, Roadmap tab, Deliverables view mode, not all the deliverables were displayed. This issue has been fixed.

#MW-2439

In the Project* Dashboards workspace, Project Finance tab, the NPV and Payback values could be inaccurate if some Cashflow data predated the project’s Start Date. This issue has been fixed.

Resource

#MW-2605

In the Project* Resources workspace, Project Allocations tab, when using the Build Allocation Requests (1-40_img_7.png) command, the user is now notified when selecting a custom period with conflicting dates.

#MW-2552

In the Resource Validation workspace, Calendars tab, Overview view mode, the “Reject” labels were not consistent with the “Rework” command. This issue has been fixed.

#MW-2510

In the Resource Validation workspace, Timesheets tab, Resources starting after the selected time period or who left the company before (based on Start and End dates) were shown in both the Overview and Details view modes. This issue has been fixed.

#MW-2495

In the Resource Dashboards workspace, Time Tracking Statistics tab, the label of the Expected column was misleading. It has been renamed Working Days.

#MW-2427

In the Project* Resources workspace, Project Allocations tab, Allocations view mode, the flash message for individually adding an allocated resource to the Project Team was not displayed. This issue has been fixed.

Portfolio

#MW-2517

A user who did not have any token was could not access the Notes dialog box. This issue has been fixed.

#MW-2496

In the Portfolio Simulation workspace, in the Scenario Definition dialog box (accessible upon clicking on the Capture (1-40_img_8.png) command), an unwanted scrollbar could appear when modifying the Scenario Selection field. This issue has been fixed.

Administration

#MW-2600

In the System Settings workspace, General Settings folder, Meta Settings tab, the message at the bottom of the page was not referring to the relevant settings. This issue has been fixed.

#MW-2537

In the Corporate Data workspace, Users tab, when the "Enable Reset Password" setting was turned off, the "Auto Reset Password" option (accessible upon clicking on the More (1-40_img_9.png) button) was still displayed in the main toolbar. This issue has been fixed.

#MW-2531

In the Resource Validation workspace, Calendars tab, Details view mode, Requests tab, the chart was only displaying data from the Resource calendar for the current year. It has been changed to always show the upcoming, requested time off for the next twelve months (from the beginning of the current month).

Agile

#MW-2501

In the Backlog Item workspace, Tasks sub-tab, when converting a backlog item task (if available), an error occurred. This issue has been fixed.

Execution

#MW-2497

In the Execution Work Items workspace, in some cases, the work items were not displayed in the relevant Folders. This issue has been fixed.

Work Package

#MW-2493

In the Work Package Center and Work Package Scheduler workspaces, the user was not able to Lock or Unlock properly the selected work package. This issue has been fixed.