2026.06

This document describes the enhancements, corrected issues, and new features that have been implemented in Planview ProjectAdvantage 2026.06, both in the Core product and in the Default Configuration.

Planview ProjectAdvantage 2026.06 is a maintenance release of Planview ProjectAdvantage 2026.

In the Core product, 4 enhancements have been implemented and 28 issues have been fixed.

In the Default Configuration, 7 enhancements have been provided and 15 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • From the 2023.01 version, the Project Dashboards workspace should be added again in the User Roles section of the Designer as the Dashboards workspace doesn't exist anymore.
  • In order to complete the upgrade to newer Planview ProjectAdvantage versions, administrators must update the “Popup” column with the correct Forms in the Designer, Search view, as follows:
  • “Global Actions” Category → Popup - Action Card (Briefs)
  • “Global Change Requests” Category → Popup - Change Request Card (Briefs)
  • “Global Deliverables” Category → Popup - Deliverable Card (Briefs)
  • “Global Issues” Category → Popup - Issue Card (Briefs)
  • “Global Risks” Category → Popup - Risk Card
  • From the 2025.12 version, OpenJDK21 is required to launch the Planview ProjectAdvantage Designer and the Java Legacy APIs. For more information, please refer to the “Move to Java 21” product notice.

Core Product Enhancements

Designer

#SCI-9327 - Syntax highlighting added to Formula editor

In the Designer, Fields view, Fields tab, Formulas sub-tab, Edit Formula dialog box, the formula editor now displays syntax-highlighted formulas with IDE-style coloring:

  • Functions are displayed in blue,
  • Field references are displayed in dark cyan
  • String literals are displayed in green
  • Boolean/number constants are displayed in purple,
  • Operators are displayed in gray,
  • And matched parentheses are highlighted at the cursor’s position.

The “Highlight” button has been added to allow users to disable the highlighting for the session.

Note: The “Highlight” button is activated by default.
Important: Error states (unmatched parentheses, unclosed strings) are underlined in red.

1-135_img_0.png

#SCI-8543 - Possibility to add colors for non-distributed cells

In the Designer, Forms view, Edit Grid Properties dialog box, Field dialog box, it is now possible to add some colors for non-distributed cells.

1-135_img_1.png

1-135_img_2.png

#MIL-6162 - Favorite built-in field now activated for Global Lessons Learned & Backlog Items

In the Designer, Data View Definition view, Data View Definition dialog box, the “Add Is Favorite Built-in Field” checkbox is now checked by default for Global Lessons Learned and Backlog Items, eliminating the need to manually activate it after updating the solution.

1-135_img_3.png

1-135_img_4.png

Resource Forecast

#SCI-8906 - API Endpoints for Resource Forecast

The API now supports Resource Forecast operations, bringing it to parity with the existing Resource Allocation (UDC) API. Users can now programmatically create and update resource forecast data through dedicated API endpoints.

Capabilities Introduced

The new endpoints cover three main scenarios:

  • Resource Requests — Create and update resource requests via API.
  • Resource Commitments linked to a Request — Create and update commitments (generic or nominative) that are attached to an existing resource request.
  • Standalone Resource Commitments — Create and update commitments (generic or nominative) that are not linked to any request.

Supported Features

  • Time-distributed effort values for both requests and commitments
  • Effort formats: Days, Hours, FTE, and FTE%
  • Custom field support
  • Alternative key support (not limited to UID)
  • Optimized for performance with up to 500 records on a weekly basis

Core Product Corrected Issues

Authentication

#SCI-9280

In some scenarios, users were unable to connect to the Designer or the HTML5 Client. This issue has been fixed.

Build

#SCI-9498

In on-premise load-balanced environments, in some scenarios, the application could fail to start after upgrading to a newer version, preventing users from accessing the system entirely. This issue has been fixed.

Built-in Timesheet

#SCI-9436

In the Timesheet (built-in) workspace, in some scenarios, users could see rework comments belonging to other resources, and there was no way to hide those comments. This issue has been fixed.

#SCI-8180

In the Timesheet (built-in) workspace, when the Timesheet Modifiable Start date was set to a date falling in the middle of a week that crossed a month boundary, users were unable to submit the remaining days of that week. The “Submit” button would appear greyed out, preventing time entries for the days in the new month from being saved. This issue has been fixed.

Note: The Timesheet Modifiable Start date can be set in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Timesheet Options section.

Corporate Data

#SCI-9401

In the Corporate Data workspace, Resources tab, Resource Identification dialog box, Definition sub-tab, when users were opening the Availability popup, the date "1/1/70" could be displayed twice, with neither entry being deletable. This issue has been fixed.

Data Snapshots

#SCI-9397

In the Data Snapshots workspace, when a data snapshot report was named in Hebrew, attempting to download the generated Excel file resulted in an error and the file could not be saved. This issue has been fixed.

Data Visualization

#SCI-9390

In the HTML5 Client, when switching the display language to Hebrew, a large white rectangle appeared over all screens immediately after the language change, rendering the application unusable. The overlay could not be dismissed and persisted across all workspaces. This issue has been fixed.

Designer

#SCI-9449

In the Designer, Fields view, some commands were incorrectly enabled in the toolbar, even when the Edit Mode (1-135_img_5.png) was turned off. This issue has been fixed.

Home - My Home Page

#SCI-9418

When translations for Quick Actions were updated in the localization grid of the Designer, the changes were not applied on the My Home Page workspace. This issue has been fixed.

Language Packs

#SCI-9198

In on‑premises environments running version 2025.12 or later with Tomcat 10.1 and Java 21, switching the interface language to Hebrew caused labels to appear as ^tags^ instead of Hebrew text. This issue has been resolved.

Localization

#SCI-9462

In the Comments Thread panel and in the My Home Page workspace, Company news block, All company news popup, the "View More" and "View Less" buttons were always displayed in English, regardless of the logged-in user's language setting. This issue has been fixed.

Performance

#SCI-9457

In some scenarios, users could experience session disconnections, failed save attempts, and timeout errors during periods of high server load. This issue has been fixed.

Portfolio Dashboards

#SCI-9329

In the Portfolio Dashboards workspace, users were unable to launch reports in a new browser tab. This issue has been fixed.

Printing

#SCI-9389

In the legacy Timesheet workspace, when users were clicking on the Gear (1-135_img_6.png) icon, then selecting the “Print” command, resource icons were not displaying correctly for resources configured with large icons. This issue has been fixed.

Projects Center

#SCI-9129

In some scenarios, users without permissions on a project could still see and open it in the Projects Center workspace. This issue has been fixed.

Projects Center - Project Card - Gantt

#SCI-8160

In the Projects Center workspace, Projects Card, Gantt tab, when enabling or disabling the “Allow Splitting” option on a task, the task's finish date would unexpectedly shift to a different date. Tasks could also disappear from filtered views, and finish dates of completed tasks could change when a resource's calendar was later updated with holidays. This issue has been fixed.

Projects Center - Project Card - Overview

#SCI-9518

In the Projects Center workspace, Project Card, Overview tab, Definition sub-tab, Users with Permissions dialog box, Read tab, the permissions groups were not visible anymore and were replaced by user names. This issue has been fixed.

Projects Center - Project Card - Status Report

#SCI-8710

In the Projects Center workspace, Project Card, Overview tab, Status Reports sub-tab, when creating a new status report, duplicate fields were being created with pre-filled content. This issue has been fixed.

Projects Center - Project Card - Task

#SCI-8498

In the Projects Center workspace, Project Card, Task tab, Tracking sub-tab, By Resources view mode, an error message could be displayed when users were clicking on the Previous (1-135_img_7.png) and Next (1-135_img_8.png) buttons to navigate between time frames. This issue has been fixed.

#SCI-8109

In the Projects Center workspace, Project Card, Task tab, Tracking sub-tab, By Resources view mode, Outstanding Timesheets in the past popup, an error message was displayed when users were clicking on the “Jump to Timeframe” button. This issue has been fixed.

Projects Dashboards

#SCI-9459

In the Projects Dashboards workspace, Work theme, Effort Distribution report, an error message could be displayed when users were clicking on the Previous (1-135_img_9.png) and Next (1-135_img_10.png) buttons to navigate between time frames. This issue has been fixed.

#SCI-9396

In the Projects Dashboards workspace, when the application language was set to French, users were unable to launch certain custom reports. The operation failed with an error indicating that the "Fiscal Month" configuration item could not be resolved, due to an incomplete translation in the built-in command list used for date alignment during report launch. This issue has been fixed.

Resource Validation

#SCI-9227

In the Resource Validation workspace, Timesheets tab, an error message could be displayed when users were clicking on the Previous (1-135_img_11.png) and Next (1-135_img_12.png) buttons to navigate between time frames. This issue has been fixed.

REST API

#SCI-8750

When creating time-distributed Cost Rate entries for Job Classifications via the API, an unexpected extra rate entry was being generated, causing the API behavior to differ from the UI. This issue has been fixed.

#SCI-8738

In some scenarios, updating a Resource's Status field (Active, Inactive, Planned) via the REST API was returning an error. This issue has been fixed.

#SCI-8336

Previously, updating a resource's availability through the REST API would fail if no finish date was provided, making it difficult to manage availability for active employees with no planned termination date. This issue has been fixed.

Scheduled Jobs

#SCI-9305

In the Designer, Scheduled Jobs view, the "Extracts – SF_PROJECT_ASSIGNMENTS" scheduled jobs were failing with an “Out Of Memory” error when generating reports containing a large volume of cells. This issue has been fixed.

Usage Event

#SCI-8510

In some scenarios, usage event logs were not capturing all user transactions, resulting in incomplete activity data and inaccurate performance metrics calculations. Only a fraction of actual navigation and interactions were being recorded. This issue has been fixed.

Default Configuration Enhancements

Data Visualization

#SCI-9296 - Workflow State displayed as colored chip

In ProjectAdvantage, whenever a field value for Workflow State and Workflow State Vote appears, it is now displayed as a chip using the color defined in the Designer for that specific state.

1-135_img_13.png

1-135_img_14.png

1-135_img_15.png

#SCI-7724 - Projects Hierarchy and Data Consolidation

Some major improvements have been applied to introduce the Projects Hierarchy feature, designed to improve the overall user experience within ProjectAdvantage, and enabling organizations to consolidate project data across entire hierarchies of related projects. Specifically, instead of navigating individual Project Cards, users can now view consolidated metrics, including effort, cost, forecast, risks, and work items, from a single consolidated view.

Hierarchical Project Natures

Project Natures can now be structured hierarchically, providing greater flexibility in representing the organization's project portfolio.

1-135_img_16.png

The following Project Natures are built-in and can be modified as follow:

  • Business Case​​ – Cannot be deleted, but can be moved up, moved down, indented and outdented.
  • ​​Initiative​​ – Cannot be deleted, but can be moved up, moved down, indented and outdented.
  • ​​Program​​ – Cannot be deleted, indented or outdented, but can be moved up, moved down.
  • Product​​ – Cannot be deleted, indented or outdented, but can be moved up, moved down.
  • Project​​ – Cannot be deleted, indented or outdented, but can be moved up, moved down.
Note: Users can add some custom natures inside and outside of the built-in hierarchy. For example, they could add Sub-projects as a child of a Project.

Each nature includes a Visible toggle. When activated, the nature appears in all Nature drop-down lists across the application and in the “Enabled Natures” fields in the System Settings workspace. When disabled, the nature is hidden from all selection lists.

Consolidated mode

The Project Card now supports two display modes, allowing users to switch between a focused view of a single project and a consolidated view of the entire project hierarchy:

  • Standalone Mode – Displays the Project Card as it appears today, showing data for the selected project only. This is the default mode when opening a project from the Projects Center workspace.
  • Consolidated Mode – Aggregates data from the selected project and all its descendants, providing an executive-level view of the entire hierarchy.

The button enabling users to select one mode or the other is displayed to the left of the Undo button on the Project Card toolbar, and is only available when the selected project has a Parent Nature (i.e., a nature that can have child natures). Clicking the button switches between the two modes.

1-135_img_17.png

1-135_img_18.png

Consolidated mode – Tabs and views

When the ​Consolidated mode​ is activated, all the ​Project Card​​ tabs are updated to reflect consolidated data across the selected project and its entire descendant hierarchy.

Overview tab – Summary sub-tab

When in ​Consolidated mode​​, the ​Summary​ sub-tab available in the ​Overview​​ tab is the main dashboard for the selected project. It is an executive view where the stakeholders can review key information immediately.

1-135_img_19.png

It is read-only and presents the following sections:

  1. Main section – Includes the following sub-sections: Information, Progress, Health Score, and Status Report.
  2. Work Items
  3. Risks
  4. Labor Effort
  5. Finance
  6. Forecast Effort
  7. Forecast Cost
Main section

The main section is broken down into 4 sub-sections:

1-135_img_20.png

  1. The Information sub-section displays key attributes of the selected project, including: Manager, Start Date (hierarchy minimum), End Date (hierarchy maximum), Portfolio Folder, Nature, and Type.
  2. The Progress sub-section shows average completion, effort, and cost percentages aggregated across all projects in the hierarchy.
  3. The Health Score sub-section presents the average Health Score across the entire project hierarchy.
  4. The Status Report sub-section displays the indicators (Cost, Time, Scope, and Trend, plus up to two configurable additional indicators) as entered in the selected project's Status Report. An indicator is highlighted when the selected project's score is greater than or equal to the worst score among its direct descendants, ensuring that issues at lower levels remain visible.
Work Items section

The Work Items section displays consolidated tiles summarizing the total count of work items across the selected project and all descendants. Each tile is interactive: clicking on it opens a detailed popup listing the relevant items.

1-135_img_21.png

The following tiles are available (subject to the corresponding “Work Items” project settings being activated in the Project Card, Administration tab, Work Features section):

  • Overdue actions
  • Open issues in the month
  • Closed issues
  • Closed deliverables
  • Pending deliverables
  • Ongoing deliverables
  • Open change requests
  • Change requests cost impact

Clicking on the ​Work items​ (​​​1-135_img_22.png​​​) button switches the view to the ​Work items​ tab, ​Summary​ sub-tab in ​Consolidated mode​​.

Risks section

The Risks section displays consolidated risk metrics across the hierarchy, including:

1-135_img_23.png

  • Extreme/High risks count
  • Open risks with mitigation actions
  • Total Cost Impact of all open risks
  • Total Time Impact of all risks on the critical path
  • Risks by Risk Level chart
Labor Effort section

The Labor Effort section is always displayed. It shows the sum of Total effort, Actual effort, and Remaining effort across all projects in the hierarchy.

1-135_img_24.png

​Clicking on the ​​Resources​ (​​​1-135_img_25.png​​​) button switches the view to the ​Project Card​​,  ​Resources​​ tab.

Clicking on the ​​Report​ (​​​1-135_img_26.png​​​) button switches the view to the ​Project Card​​,  ​Dashboards​ tab, ​Consolidated Labor Effort​​ dashboard.

Finance section

The Finance section is always displayed. It shows the sum of Budget (if the “Budget” project setting is activated in the ​Project Card​​, ​Administration​ tab, ​Finance​​ section), Total cost, Actual cost, and Remaining cost.

1-135_img_27.png

Clicking on the ​Finance​ (​​​1-135_img_28.png​​​) button switches the view to the ​Project Card​​,  ​Finance​​ tab, ​Summary​​ sub-tab.

Clicking on the ​Report​ (​​​1-135_img_29.png​​​) button provides access to the following commands, enabling users to open two reports: Consolidated cost and Consolidated budget. Selecting a report switches the view to the ​​Project Card​​, ​Dashboards​​ tab.

Forecast Effort section
Important: The Forecast Effort section is displayed when the “Activate Forecast” meta setting is activated in the ​System Settings​ workspace, ​General Settings​ folder, ​Meta Settings​ tab, and if the “Commitments” or the “Requests & Commitments” project setting is activated in the ​Project Card​​, ​Administration​ tab, ​​Resource management​​ section.

It shows the sum of Request effort and the Commitment effort across all projects in the hierarchy.

1-135_img_30.png

Clicking on the ​Forecast​ (​​​1-135_img_31.png​​​) button switches the view to the ​Project Card​​, ​Forecast​ tab, ​Summary​​ sub-tab.

Clicking on the ​Report​ (​​​1-135_img_32.png​​​) button switches the view to the ​Project Card​​, ​Dashboards​ tab, ​Consolidated Labor Effort forecast​​ dashboard.

Note: The data format (Hours, Days, FTE and FTE%) is conditioned by the “Set requested/Committed Effort format” setting available in the ​System Settings​ workspace, ​Resource Settings​ folder, ​Allocations & Commitments​ tab, ​Requests & Commitments Options​​ section.
Forecast Cost section
Important: The Forecast Cost section is displayed when the “Activate Forecast” meta setting is activated in the ​System Settings​ workspace, ​General Settings​ folder, ​Meta Settings​ tab, and/or​ the “Expenditure” project settings are activated in the ​Project Card​​, ​Administration​ tab, ​Setup​ sub-tab, ​Resource management​​ section.

It shows the sum of Forecast cost, Expenditure cost, and Commitment cost across all projects in the hierarchy.

1-135_img_33.png

Clicking on the ​Forecast​ (​​​1-135_img_34.png​​​) button switches the view to the  Project Card,  ​Forecast​ tab, ​Summary​​ sub-tab.

Clicking on the ​Report​ (​​​1-135_img_35.png​​​) button switches the view to the  ​Project Card​​,  ​Dashboards​ tab, ​Consolidated Cost forecast​​ dashboard.

Overview tab – Definition and Status Reports sub-tabs

The Definition sub-tab displays the same content as in Standalone mode. The Status Reports sub-tab presents a read-only grid of all Status Report scores for the selected project and its direct descendants, with a “Direct descendants Status Report” view delivered by default.

Hierarchy tab

The Hierarchy tab is always visible in Consolidated mode and provides a central space for managing the project hierarchy. Users can create and review all descendants of the selected project directly from this tab.

1-135_img_36.png

The grid is editable and includes:

  • Two built-in views – All Descendants and Direct Descendants.
  • Search and Filters – Using the same field sets as the Projects Center workspace.
  • A "+ New Project" button – Opens the Create popup. The Nature pick-list is automatically filtered to show only child natures of the selected project's nature. The Parent field defaults to the selected project, but can be modified.
  • Quick-open navigation – Hovering over a project name in the grid displays the OPEN button to access the Project Card.
Resources tab

The Resources tab displays effort data broken down per project across the hierarchy.

1-135_img_37.png

It includes a default Labor Effort Breakdown view, with columns for Total, Actual, Remaining, and Baseline Labor Effort (each representing hierarchy sums). Hovering the mouse over a project row displays the ​OPEN​ button on the right-hand side of the ​Project Name​​. Clicking on the ​OPEN​​ button opens:

  • The ​Project Card​​, ​Resources​​ tab (Consolidated mode), for parent projects, i.e. if the project has descendants.
  • The ​Project Card​​, ​Resources​ tab, ​Resources assignments​​ sub-tab (Standalone mode), for projects at the latest level, i.e. if the project does not have any descendants.
Finance tab

The Finance tab consolidates all financial data for the selected project and its descendants.

1-135_img_38.png

It consists of three sub-tabs:

  1. Summary
  2. Cost
  3. Budget
Summary sub-tab

The ​Summary​​ sub-tab provides consolidated budget and cost information for the selected project and all its descendants. It is made up of four sections:

→ Budget vs. Cost – Tiles comparing the Budget against Total Cost, Actual Cost, and Forecast Cost. Color coding (blue for on/under budget, red for over budget) provides at-a-glance financial health.

1-135_img_39.png

→ Cost Breakdown – Tiles showing Total cost, Total actual cost, and Total remaining cost, each broken down by Labor, Transaction, and (if enabled) Cost Item.

1-135_img_40.png

→ Cost Analysis – A histogram comparing Budget, Total Cost, Actual Cost, and Forecast Cost.

1-135_img_41.png

→ Total Cost Breakdown – A histogram comparing Labor cost, Transaction cost, and Cost item cost.

1-135_img_42.png

Cost Sub-Tab

A read-only grid displaying consolidated cost data per project, with a default Cost Breakdown view.

1-135_img_43.png

Budget Sub-Tab

The Budget sub-tab displays budget and cost data per project. It displays fields for Budget vs. Forecast Cost, Budget vs. Total Cost, and Budget vs. Actual Cost, which are color-coded: orange when cost exceeds budget, green when under budget.

1-135_img_44.png

Note: The ​Budget​ sub-tab is displayed only if the "Budget" project setting is activated in the ​Project Card​​, ​Administration​​ tab.
Forecast tab
Note: The Forecast tab is displayed when the “Activate Forecast” setting is activated in the ​System Settings​ workspace, ​General Settings​ folder, ​Meta Settings​ tab, ​Meta Settings​ section. The "Commitments" or the "Requests & Commitments" and/or the "Expenditure" project settings must also be activated in the ​Project Card​​, ​Administration​​ tab.

It is made up of the following sub-tabs:

1-135_img_45.png

  1. Summary
  2. Labor
  3. Cost
Summary sub-tab

The ​Summary​​ sub-tab provides all the labor effort-, labor cost-, and project cost-related consolidated data for the selected project and all its descendants.

1-135_img_46.png

Labor sub-tab

The ​Labor​​ sub-tab displays Forecast labor data broken down per project. Color-coded fields highlight under- and over-commitment, providing immediate visibility into resource allocation gaps.

1-135_img_47.png

Cost sub-tab

The ​Cost​​ sub-tab displays Forecast cost data broken down per project.

1-135_img_48.png

Work Items tab

The Work Items tab consolidates all work item data across the hierarchy. It includes five sub-tabs:

1-135_img_49.png

  1. Summary
  2. Actions
  3. Issues
  4. Deliverables
  5. Change Requests
Note: For the ​Work Items​ tab to be displayed, the “Activate Work Management” setting must be activated in the ​System Settings​ workspace, ​General Settings​ folder, ​Meta Settings​ tab, ​Meta Settings​​ section. The ​Work Items​ project setting must also be activated in the ​Project Card​​, ​Administration​ tab, ​Work Features​​ section.
Summary sub-tab

The Summary sub-tab provides key information regarding the work items of the selected project and all its descendants. It includes tiles (Overdue, Linked to Risks, Linked to Change Requests, Related to Gates, With Cost Impact, With Time Impact) and progress indicators showing the proportion of closed work items and average cycle time across the hierarchy.

1-135_img_50.png

Work Items sub-tabs

The Actions, Issues, Deliverables, and Change Requests sub-tabs each include grid and board views, multiple views, grouping, filtering, and display column options, consistently with the existing Project Card experience. New items created from these tabs are automatically associated with the selected project's hierarchy.

Risks tab

The ​Risks​​ tab consolidates risk data across the hierarchy and provides all the tools needed to manage the risks of the selected project and all its descendants.

1-135_img_51.png

It is made up of the following sub-tabs:

  1. Summary
  2. Register
Note: For the ​Risks​ tab to be displayed, the “Activate Work Management” setting must be activated in the ​System Settings​ workspace, ​General Settings​ folder, ​Meta Settings​ tab, ​Meta Settings​​ section. The ​Risks​ project setting must also be activated in the ​Project Card​​, ​Administration​ tab, ​Work Features​​ section.
Summary sub-tab

The Summary sub-tab is made up of tiles for Extreme/High risks, Overdue risks, and Open risks without mitigation. It includes Time & Cost Impact aggregations, Mitigation & Contingency summary, and a consolidated Risks Matrix.

1-135_img_52.png

Register sub-tab

The Register sub-tab displays all the risks of the selected project and all its descendants, and provides all the relevant information and tools to manage the risks. It provides multiple views (including Extreme/High, Overdue, and Mitigation- and Contingency-based views), consistent with the Risks Center workspace.

Administration tab

The Administration tab displays the same content as in Standalone Mode, showing the selected project's configuration settings.

Dashboards tab

The Consolidation Dashboards section is now displayed for any project with a Parent Nature, expanding beyond the previous scope of Program and Product natures only.

1-135_img_53.png

A new Resource theme has been added, and several new dashboards are available:

  • Resource theme – Consolidated Labor Effort, and Consolidated Labor Effort Forecast.
  • Finance theme – Consolidated Cost, Consolidated Budget, Consolidated Cost Forecast, and Consolidated Labor Cost Forecast.

Filters popup

In the Projects Center workspace, new Hierarchy Display Options are available in the Filters popup, allowing users to manage hierarchy results.

1-135_img_54.png

If a project meets the selected filter(s), but has a parent project which does not meet the filter(s), the parent can be displayed using the “Show direct parent” option, or all parents can be displayed using the “Show all parents” option.

Similarly, if a project meets the selected filter(s), but has a descendant which does not meet the filter(s), direct descendants can be displayed using the “Show direct descendants” option, or all descendants can be displayed using the “Show all descendants” option.

Note: The aforementioned options are only displayed when the “Enable Projects Hierarchy” setting is activated in the System Settings workspace, Project Settings folder, Global Options tab, Hierarchy sub-tab.

1-135_img_55.png

For more information, please refer to the Projects Hierarchy documentation.

Projects - Projects Center

#VAN-1627 - Ability to add objects to/remove objects from favorites for read-only users

Users with read-only access can now add or remove objects from their favorites, regardless of their write permissions on the object concerned. This enhancement allows read-only users, such as stakeholders, observers, or external reviewers, to customize their workspace and quickly access the objects most relevant to their work.

An object can be easily added to the favorites by clicking on the Star (1-135_img_56.png) icon.

1-135_img_57.png

An object added to the favorites is displayed with a Yellow star (1-135_img_58.png) icon.

1-135_img_59.png

Note: As a reminder, the Favorite Objects feature is available for the following object types:

→ Projects

→ Work objects: Actions, Change Requests, Deliverables, Issues, and Risks

→ Ideas

#VAN-1587 - Fields icons enhancement

For selection fields, buttons, and text fields in grids and tree views, the generic Hamburger (1-135_img_60.png) icon has been replaced throughout the application with specific icons:

→ Selection fields and buttons display either a List (1-135_img_61.png) icon, indicating that a value can be selected from a dropdown list, or a Selector (1-135_img_62.png) icon, indicating that a value can be selected from a selector.

1-135_img_63.png

1-135_img_64.png

1-135_img_65.png

1-135_img_66.png

→ Rich text fields and text boxes display an Expand (1-135_img_67.png) icon, indicating that the field opens to a text editor popup.

1-135_img_68.png

1-135_img_69.png

Note: Date fields in dialog boxes, forms, and grids now display a Calendar (1-135_img_70.png) icon to the right of the input field, making it immediately clear that the field accepts a date. The date picker can be opened by clicking directly on the text box or on the calendar icon.

1-135_img_71.png

#VAN-1578 - New filters match dropdown list available in Filters popup

In all the Center (Projects Center, Actions Center, Change Requests Center, Deliverables Center, Issues Center, Risks Center, Ideas Center, and Templates Center) workspaces, Filters popup, users can now choose how to combine multiple filter criteria. A new dropdown list is available at the top, allowing users to switch between:

1-135_img_72.png

→ Results match all criteria — only items that match all filters are displayed (AND logic). This is the default option, which maintains the current behavior.

1-135_img_73.png

→ Results match at least one criterion — items that match any filter are displayed (OR logic).

1-135_img_74.png

Projects Center - Project Card - Phases & Gates

#MIL-5941 - Redesigned Phases-Gates experience

A fully redesigned Phases & Gates experience has been introduced, replacing the legacy phase-gate visualization with a richer, interactive model specifically designed for users who want to use the Phase/Gate methodology for product development.

Gantt tab & Task List sub-tab

A new Status column is now available both in the Gantt tab and in the Task tab, Task List sub-tab. The status is calculated automatically from each task’s % Completed and cannot be edited directly. Its value is defined as follows:

  • Draft – % Completed = 0. The task has not started yet.
  • In Progress – % Completed > 0 and < 100. The task is in progress.
  • Completed – % Completed = 100. The task is finished.
Note: For group tasks, the Status is calculated from the children tasks, based on the consolidated % Completed, so that the status of the parent task always reflects the aggregated status of its descendants.

A new Workflow Type column has also been added, allowing any task to be designated as a Phase or a Gate. The following values can be displayed:

  • None – The task has not been defined as a Phase or a Gate. This value is displayed by default.
  • Phase – The task represents a phase of the project lifecycle. This value must be associated with a group task (a parent task with children tasks). The phase spans the duration of the children's tasks.
  • Gate – The task represents a decision gate between phases. This value must be associated with a milestone, i.e. a task whose duration is zero.
Note: Once a task is set as a phase or a gate, it is displayed in the Phases & Gates flowchart in the Phases & Gates tab.

1-135_img_75.png

1-135_img_76.png

Phases & Gates tab

The Phases & Gates tab has been fully revamped to allow users to manage phases & gates from a single interface.

1-135_img_77.png

It is made up of the following elements:

  1. Phases & Gates flowchart
  2. Gates Review Management section
Phases & Gates flowchart

The ​Phases & Gates​​ flowchart is the primary visualization of the project's lifecycle.

When tasks have been identified as phases and/or gates, the ​Phases & Gates​​ flowchart offers a workflow of the phases and gates as a single horizontal sequence of shapes:

  • Phases are rendered as rectangles displaying the following attributes: Name, Start-Finish dates, % Completed, and Workflow State (color-coded).
  • Gates are rendered as diamonds (color-coded by their workflow state).

1-135_img_78.png

Note: For phases, the color displayed matches the task's status of the underlying group task:
  • Gray​​ – Draft (% Completed = 0).
  • Blue​​ – In Progress (% Completed > 0 and < 100).
  • Green​​ – Completed (% Completed = 100).

Once a gate reaches the ​Approved​ state, the workflow state of preceding phase(s) is automatically set to ​Completed​​.

Note: For gates, The color displayed matches the gate review workflow:
  • Gray​​ – Draft.
  • Blue​​ – Under Review.
  • Green​​ – Approved.
  • Red​​ – Rejected.
  • Orange​​ – Reworked.

Clicking on a phase opens the Task Card​​​, while clicking on a gate opens the Gate Card.

Gates Review Management section

Below the flowchart, a new Gates Review Management spreadsheet displays the project's tasks that have been identified as gates.

1-135_img_79.png

The following columns are displayed:

  • Gate Name – The name of the gate.
  • Gate Date – The start/finish date of the gate.
  • Submitted to Review Date – Automatically captured when the gate transitions from Draft to Under Review.
  • Days in Review – The difference between today's date and the ​Submitted to Review​​ date, giving an at-a-glance signal of how long a gate has been opened.
  • Workflow State – The current gate workflow state. It is the control by which the user transitions the gate through its lifecycle.
  • Gate Keepers – The gatekeepers previously identified in the Gate Card​​​, ​Gatekeepers​​ tab. Each gatekeeper's avatar is displayed, alongside a status icon indicating where the individual gatekeeper stands on his/her decision. The combination of the avatar and the status icon allows the gate manager to see at a glance who has made a decision and whose decision is still pending.
  • Deliverables % Completed – Displays a progress bar showing the ​% Completed​​ of the deliverables required to complete the gate, as well as the number of completed gates relative to the total number of gates.
  • Last Status Report – Opens the Gate Status Reports full screen view​​​, allowing to view the most recently created Gate Status Report.
Note: The available workflow states and transitions are:
  • Draft​​ (gray chip) – Initial state. The gate is being prepared and is not yet visible to gatekeepers for decision.
  • Under Review​​ (blue chip) – The gate has been submitted. Gatekeepers can make individual decisions.
  • Approved​​ (green chip) – Final positive decision. The gate is closed and the preceding phase is automatically completed.
  • Rejected​​ (red chip) – Final negative decision. The gate is closed without progression.
  • Reworked​​ (orange chip) – The gate needs additional work before it can be resubmitted for review.
  • Resubmitted​​ (purple chip) – The gate has been resubmitted. Gatekeepers can make individual decisions again.

Gate Card

The Gate Card is the single space for all gate activity, accessible from the Gantt tab, the Task List sub-tab, the Phases & Gates flowchart, or the Gates Review Management spreadsheet. It is organized into three tabs:

  1. Gatekeepers
  2. Deliverables
  3. Gate Status Report
Gatekeepers tab

The Gatekeepers tab allows users to add or remove gatekeepers and record individual Approve, Reject, or Rework decisions with comments. Review dates are captured automatically for each gatekeeper.

1-135_img_80.png

Deliverables tab

The Deliverables tab allows the user to view and validate gate deliverables. Mandatory deliverables must be completed before a gate can be Approved.

1-135_img_81.png

Gate Status Report tab

The Gate Status Report tab allows the user to create and manage status reports for the gate. Multiple reports can be created over the gate’s lifecycle; the most recent one is surfaced in the Gate Review Management spreadsheet.

1-135_img_82.png

Dashboards & Status Reports integration

The new Phase-Gate diagram replaces the legacy visualization across the following areas:

→ In the Project Card, Overview tab, Status Reports sub-tab, when using the Print command:

1-135_img_83.png

→ In the Project Brief dialog box, Phases & Gates folder:

1-135_img_84.png

→ In the Portfolio Dashboards workspace, Phases & Gates theme, Overview report:

1-135_img_85.png

System Settings

A new Gates Options section is available in the System Settings workspace, Project Settings folder, Global Options tab, Phases & Gates sub-tab, to allow administrators to configure the default workflow states applied to gates across projects.

1-135_img_86.png

For more information, please refer to the Phases & Gates documentation.

Projects Center - Project Card - Task

#MIL-6238 - Open button now available in Task List sub-tab

In the Projects Center workspace, Project Card, Task tab, Task List sub-tab, hovering the mouse over a task row now displays the OPEN button on the right-hand side of the Task Name. Clicking on the OPEN button opens the Task Card.

1-135_img_87.png

1-135_img_88.png

Default Configuration Corrected Issues

Budget/Finance

#MIL-6239

In the Projects Center workspace, Project Card, Finance tab, Transactions dialog box, the Custom section was not properly displayed when the “Enable Transaction Pop-up Custom Section” setting was activated.This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Finance section.

Corporate Data

#MIL-6254

In the Corporate Data workspace, Resources tab, the “Export current view to Excel” option was not available when clicking on the More (1-135_img_89.png) button in the main toolbar. This issue has been fixed.

Ideas Center

#MIL-6156

In the Ideas Center workspace, Idea Card, Attachments subtab, read-only users were incorrectly able to add and delete attachments. This issue has been fixed.

Localization

#MIL-6169

In the Corporate Data workspace, Resources tab, when users were clicking on the More (1-135_img_90.png) button, then selecting the "Forget selected Resources/Users" option, the message displayed in the "Confirmation Request" prompted popup contained an error when connected in French. This issue has been fixed.

#MIL-6163

In the Resource Forecast workspace, for requests whose workflow state is "To be committed", the Fulfill request, Commit, and To rework commands were incorrectly not displayed when connected in German. This issue has been fixed.

Projects Center - Project Card - Evaluation

#MIL-6141

In the Projects Center workspace, Project Card, Evaluation tab, Evaluation Trend dialog box, the Evaluation History was not properly copied in when a project business case workflow state was changed from Submitted to New Project. This issue has been fixed.

Projects Center - Project Card - Finance

#MIL-6171

In the Projects Center workspace, Project Card, Finance tab, Transactions dialog box, when the Transaction Mode was configured to a specific value (e.g., Distributed), the setting was not being respected when creating a new cost transaction. Both "Dated Transaction" and "Distributed Transaction" options remained available in the Create transaction dialog box. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Finance section.

Projects Center - Project Card - Gantt

#MIL-6170

In the Projects Center workspace, Project Card, Gantt tab, Task panel, Transactions & Cost Items tab, when the Transaction Mode setting was set to "Distributed", clicking the "+ New" button in the Transactions section had no effect, and users were unable to create new transactions. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Finance section.

#MIL-6167

In the Projects Center workspace, Project Card, Gantt tab, in multi-project selection, when users were creating a work item linked to an activity of the second selected project, the work item was incorrectly associated with the first selected project. This caused work items to be created under the wrong project. This issue has been fixed.

#MIL-6155

In the Projects Center workspace, Project Card, Gantt tab, Manage Baselines dialog box, when users were clicking on the Details (1-135_img_91.png) button to open the spreadsheet listing the project’s task, then compare the current and the baseline values, the Total Cost indicators were only taking into account the Labor Cost. This issue has been fixed.

Note: A Project summary row has been added in the top section.

1-135_img_92.png

Projects Center - Project Card - Work Items

#MIL-6071

In the Projects Center workspace, when users were creating a project from a template which included Actions or Deliverables, and were activating the “All” Import Actions and Import Deliverables options, the priority values were not properly copied. This issue has been fixed.

Resource Dashboards

#MIL-6179

In the Resource Dashboards workspace, when users were clicking on the Filters button for the Team Status report under the Team theme, two filters were missing in the Filters popup. This issue has been fixed.

Resource Forecast

#MIL-6174

In the Resource Forecast workspace, Fulfill request dialog box, performance issues could occur when fulfilling a request with a nominative resource if the number of resources displayed in the Resources sub-section was too large. This issue has been fixed; from now on, the number of resources displayed is conditioned by the "Set Resource Allocation/Forecast Views Max. Records" option. By default, the number of resources is set to 50.

Note: The aforementioned setting is located in the System Settings workspace, General Settings folder, General Options tab, Display Controls section.

Resource Validation

#MIL-6139

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, Rework Comments History dialog box, clicking on the Link (1-135_img_93.png) button switched the view to the Timesheet workspace, with an incorrect time period displayed. This issue has been fixed.

System Data

#MIL-6165

In the System Data workspace, Custom Reports tab, Basic Attributes section, the Nature field was pointing to the wrong pick list. This issue has been fixed.

System Requirements

There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which Planview ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.

Note: Users' system clocks must be regularly and accurately synchronized with the internet.

Servers

  • Application Server: Apache Tomcat 10.1, or 11 with Oracle Java 21 or OpenJDK21
Important: The use of OpenWebStart is mandatory to open the Designer.
  • Data Server: PostgreSQL 14, PostgreSQL16

HTML5 Clients

  • Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
  • Minimum of 4GB RAM allocated (8GB recommended).
  • Browser
    • Microsoft Edge
    • Google Chrome
    • Mozilla Firefox
    • Apple Safari

Planview ProjectAdvantage Designer

  • Recommended language: English
  • Display resolution: 1366 x 768
  • Minimum of 4GB RAM allocated
  • Disk space: 200MB minimum available for Planview ProjectAdvantage.
  • Oracle Java 21 or OpenJDK 21
  • Operating Systems:
    • Windows 7, 8.1, 10 or 11
    • Mac OS X Lion or newer
    • Alpine Linux 3.16.1

REST API

  • Supported language: English

Timesheets Mobile Application

  • Being hosted by Planview ProjectAdvantage
  • Product version: 2022.08 and upper versions

Planview ProjectAdvantage platform

Users will need to enable third-party cookies to work within Planview ProjectAdvantage. For more information regarding third-party cookies, please refer to the “How to allow third-party cookies” documentation.

For customers who subscribed only to ProjectAdvantage

  • Installation:
    • POD 11 is required if hosted by Planview ProjectAdvantage
    • An Hydra server is required if on premise
  • Product version: 2023.01 and upper versions

For customers who subscribed to ProjectAdvantage and Deliver

  • Installation:
    • POD 11 is required if hosted by Planview ProjectAdvantage
    • An Hydra server is required if on premise
  • HPV2 activated on Deliver modules (activated by default for all new Deliver Clients after 2021 Q3)
  • Product version: 2023.01 and upper versions
  • Users will need to allow third-party cookies in their browser

Limitations

The data connector:

  • Does not work in load balanced environments.
  • Is not compatible with Cloud Scheduled Jobs.
  • Is not compatible with dedicated API servers.
  • Is not compatible with the Java API.