Planview Customer Success Center

2026.01

This document describes the enhancements, corrected issues, and new features that have been implemented in Planview ProjectAdvantage 2026.01, both in the Core product and in the Default Configuration.

Planview ProjectAdvantage 2026.01 is a maintenance release of Planview ProjectAdvantage 2026.

In the Core product, 7 enhancements have been implemented and 30 issues have been fixed.

In the Default Configuration, 1 enhancement has been provided and 14 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.
  • From the 2023.01 version, the Project Dashboards workspace should be added again in the User Roles section of the Designer as the Dashboards workspace doesn't exist anymore.
  • In order to complete the upgrade to newer Planview ProjectAdvantage versions, administrators must update the “Popup” column with the correct Forms in the Designer, Search view, as follows:
  • “Global Actions” Category → Popup - Action Card (Briefs)
  • “Global Change Requests” Category → Popup - Change Request Card (Briefs)
  • “Global Deliverables” Category → Popup - Deliverable Card (Briefs)
  • “Global Issues” Category → Popup - Issue Card (Briefs)
  • “Global Risks” Category → Popup - Risk Card
  • From the 2025.12 version, OpenJDK21 is required to launch the Planview ProjectAdvantage Designer and the Java Legacy APIs. For more information, please refer to the “Move to Java 21” product notice.

Core Product Enhancements

Build

#SCI-7709 - Project Cost Forecast feature V2

A new Templates Center workspace has been implemented under the Administration module to ensure better consistency with the other Center workspaces available in the solution, thereby improving the overall user experience.

1-130_img_0.png

Users can now create and access templates through a unique entry point, the Templates Center workspace, which replaces the following workspaces:

  • Template Center
  • Template Scheduler
  • Template Work Management
  • Template Allocation Requests
Note: When the user creates a template by clicking on the + New Template button, if no type is selected in the Create a New Template popup, the template is now created as a “Template” version.

If the user selects a type in the Create a New Template popup, the template is created using the version defined as “Type”.

Hovering the mouse over a template row displays the OPEN button on the right-hand side of the Template Name.

1-130_img_1.png

Clicking on the OPEN button opens the Template Card, which includes a layout common to the Project Card. Specifically, information is organized in the form of tabs, which have been implemented to simplify the navigation.

1-130_img_2.png

The Forecast feature is now also implemented in templates through the Forecast tab, allowing users to manage labor and cost forecasts if the relevant project settings are activated.

1-130_img_3.png

Important:
  • If the “Requests & Commitments” project setting is activated in the Setup tab, Resource Management section, users are able to create requests. Those requests are defined as “In progress”, and they cannot be submitted.

1-130_img_4.png

  • If the “Commitments” project setting is activated in the Setup tab, Resource Management section, users are only able to create generic commitments.

1-130_img_5.png

  • If the “Expenditure” project setting is activated in the Setup tab, Forecast section, users are able to create expenditures.

1-130_img_6.png

In addition, it is now possible to create a project from a template that has some forecast data.

In the Create popup, once the From Template (1-130_img_7.png) option is selected, if the selected template has some requests and/or commitments and/or expenditures, the user will be prompted to decide whether these should be inserted or not.

1-130_img_8.png

If the “Insert Expenditures” switch button is activated, the expenditures coming from the template will be imported into the new project.

If the “Insert Labor Forecast” switch button is activated, the requests and/or the commitments coming from the template will be imported into the new project.

In the Create popup, once the From Existing (1-130_img_9.png) option is selected, if the selected existing project has some requests and/or commitments and/or expenditures, the user will be prompted to decide whether these should be inserted or not.

1-130_img_10.png

If the “Insert Expenditures” switch button is activated, the expenditures coming from the existing project will be imported into the new project.

If the “Insert Labor Forecast” switch button is activated, the requests and/or the commitments coming from the existing project will be imported into the new project.

Note: The requests’ workflow state will be reset to “In progress” and all the commitments which could have fulfilled requests will be removed.

Furthermore, in the Project Card, Forecast tab, Labor sub-tab, when the “Requests & Commitments” or the “Commitments” project setting is activated, a new Insert from template command is available when clicking on the + New commitment or the + New request button.

1-130_img_11.png

1-130_img_12.png

Note: The aforementioned settings are located in the Project Card, Administration tab, Setup sub-tab, Resource Management section.

Selecting the Insert from template command prompts the Project popup listing the templates that have some requests or commitments. After selecting the template, the requests or the commitments will be created in the project.

1-130_img_13.png

1-130_img_14.png

In the Project Card, Forecast tab, Expenditure sub-tab, when the “Expenditure” project setting is activated, a new Insert from template command is also available when clicking on the + New expenditure button.

1-130_img_15.png

Note: The aforementioned setting is located in the Project Card, Administration tab, Setup sub-tab, Forecast section.

Selecting the Insert from template command prompts the Project popup listing the templates that have some expenditures. After selecting the template, the expenditures will be created in the project.

1-130_img_16.png

Additionally, the Effort data format available in the Project Card, Forecast tab, Labor sub-tab, Snapshots popup, Comparison popup, is now aligned with the format selected in the “Set Requested/Committed Effort Format” picklist in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Requests & Commitments section. This means that the data available in the Comparison popup is now available in:

  • Effort in days
  • Effort in hours
  • FTE
  • FTE%

1-130_img_17.png

1-130_img_18.png

Moreover, a new Commitment vs. assignment dashboard has been created in the Projects Dashboards workspace, Resource theme. It allows the user to compare the Commitment effort and the Assignment effort.

1-130_img_19.png

1-130_img_20.png

Note: The Effort data format is aligned with the format selected in the “Set Requested/Committed Effort Format” picklist in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Requests & Commitments section. This means that the data available in the Commitment vs. assignment dashboard is available in:
  • Effort in days
  • Effort in hours
  • FTE
  • FTE%

In the upper section of the dashboard, the pivot allows the user to display all resources that have been committed to the project By organization or By job classification.

1-130_img_21.png

For each resource, the Assignment effort and the Actual effort applied to the project are also displayed.

1-130_img_22.png

Upon activating the Display comparison switch button in the upper right corner, two extra rows are displayed: Commitment vs. assignment, and Commitment vs. actual. They allow the user to compare the Commitment effort and the Assignment effort, as well as the Commitment effort and the Actual effort.

1-130_img_23.png

In the lower part of the spreadsheet, the Assigned resources without commitment section displays all the resources that have been assigned but not committed to the project. The Assignment effort and Actual effort applied to the project are displayed.

1-130_img_24.png

Previously, in the Forecast feature, only expenditures could be attached to a cost center. Now, commitments can be attached to a cost center, allowing users to analyze forecast costs by cost center.

Unlike expenditures, which are specifically attached to a cost center, attaching a cost center to commitments will automatically follow the rules below:

  • For generic commitments, cost centers will inherit the cost center of the organization branch which the generic resource is part of.
  • For nominative commitments, cost centers will inherit the cost center of the resource. If the resource is not attached to any cost center, the nominative commitment will inherit the cost center of the resource’s organization branch.

Consequently, it is now possible to create a budget coming from the Labor and Expenditure forecast. In the Project Card, Finance tab, Budget dialog box, the Update from Forecast button has been added.

1-130_img_25.png

Clicking on the Update from Forecast button opens the Update Budget from Forecast popup.

1-130_img_26.png

Note: Only Cost-type cost centers will be considered. Effort-type cost centers will not allow data relating to the effort to be retrieved.

Finally, in the Project Card, Finance tab, Dashboards full screen view, the charts displayed in Budget and Costs tabs have been enhanced to consider the Labor forecast.

Note: For projects whose “Requests & Commitments” project setting is activated in the Project Card, Administration tab, Setup sub-tab, Resource Management section, only the commitments fulfilling requests whose workflow state is “Committed” will be considered.
Note: For a commitment to inherit cost centers from an organization, these must first be attached to the organization prior to creating the commitments in the System Data workspace, Organizations tab.

Calendar

#SCI-7580 - Calendar now available in the HTML5 Client

A new Calendar workspace is now available under the Administration module, allowing administrators to create and modify calendars directly into the HTML5 Client.

1-130_img_27.png

The Calendar workspace is made up of two sections:

  1. Left panel
  2. Month view

Left panel

The left panel displays the list of existing calendars, with the currently selected calendar displayed with a light blue background.

1-130_img_28.png

The calendar set as default by the administrator is displayed with a “Default” tag.

1-130_img_29.png

Note: The following calendars are available by default:
  • 4 Day
  • All Period
  • All Period 8h
  • All Period Without Weekends
  • Default

Clicking on the + New Calendar button in the upper section of the left panel opens the Create new calendar popup, in which the administrator is prompted to enter a calendar Name. Once created, the calendar is added to the list of calendars in the left panel.

1-130_img_30.png

1-130_img_31.png

Note: When using the “+ New Calendar” button, the newly created calendar inherits the settings from the “Default” calendar.

Upon clicking on the horizontal More (1-130_img_32.png) button of a particular calendar, the following commands are available:

  • Set as Default (1-130_img_33.png) – Allows the administrator to set the selected calendar as default.
  • Duplicate (1-130_img_34.png) – Allows the administrator to duplicate the selected calendar.
  • Rename (1-130_img_35.png) – Opens the Rename calendar popup, allowing the administrator to rename the selected calendar.
  • Delete (1-130_img_36.png) – Allows the administrator to delete the selected calendar.

1-130_img_37.png

Note: Only one calendar can be set as default. Once set as default, the calendar cannot be deleted and the Delete (1-130_img_38.png) option is grayed out.

1-130_img_39.png

Note: When selecting the “Duplicate” command, the newly created calendar inherits the settings from the calendar it is duplicated from.

Month view

The Month view displays the current month for the selected calendar, in which the administrator is able to define and edit working and non-working time periods.

1-130_img_40.png

A message is displayed each time the administrator navigates to the Calendar workspace. It is removed when the administrator clicks on the Close (1-130_img_41.png) button or selects a day in the calendar on the left hand-side.

1-130_img_42.png

Clicking on the left (1-130_img_43.png) or right (1-130_img_44.png) arrows allows the administrator to navigate to the previous/following month/year.

1-130_img_45.png

Clicking on the Go to today button allows the administrator to go back to the current month in the calendar, with the current date selected and highlighted by a square.

1-130_img_46.png

1-130_img_47.png

Upon selecting a date in the calendar on the left-hand side, it is displayed with a blue border, highlighted in gray, and the Clear date (1-130_img_48.png) button appears at the bottom left of the calendar, allowing the administrator to deselect the date.

1-130_img_49.png

By default, when no date is selected, the administrator can visualize all the time periods set for the month on the right-hand side of the Month view.

1-130_img_50.png

The administrator can edit the Work and Non work days and ranges by clicking on the Edit (1-130_img_51.png) button displayed on the right-hand side when hovering the mouse over the defined time period.

1-130_img_52.png

Note: Working and non working days and hours can only be modified, not deleted.

Upon doing so, the Edit working days or Edit non working days popups are displayed.

1-130_img_53.png

1-130_img_54.png

The Edit working days and Edit non working days popups allow the administrator to define which days are to be selected as working or non working by ticking the relevant checkboxes in the upper section of the popup.

Ranges can be configured in the Configure ranges section, with the possibility to apply the same rules to all selected days by activating the Apply ranges to all selected days switch button.

New ranges can be added by clicking on the + Range button, while hovering the mouse on the right-hand side of a range displays the Delete (1-130_img_55.png) button, allowing the administrator to delete the selected range.

1-130_img_56.png

1-130_img_57.png

Note: A maximum of four ranges can be configured for a given day.
Note: Working and non working days are automatically repeated, with no end date.
Note: Different types of formatting are accepted when entering a range value. For instance, for 08:00, the following formats are accepted: 8, 8h, 8:00, or 8 AM. Once pressing “Enter”, the format is automatically normalized to HH:mm.

Clicking on the Add Exceptions button displays the Add Exceptions popup, which allows the administrator to set exceptions for the selected calendar.

1-130_img_58.png

The following information will need to be entered:

  • Type – Allows to select the exception type. The following types are available by default:
    • Non-Work
    • Work
    • Vacation
    • Holiday
    • Sick
    • Jury Duty
    • Other
  • Start Date – Allows to define the start date for the exception.
  • End Date – Allows to define the end date for the exception.
  • Range – Allows to select the range for the exception (“All day” or a custom range can be selected).
  • Repeat – Allows to define the occurrences for the exception.
Note: The Repeat section differs depending on the selected occurrence option (“Every”).

1-130_img_59.png

1-130_img_60.png

1-130_img_61.png

1-130_img_62.png

Once set, exceptions are highlighted in the calendar.

1-130_img_63.png

Exceptions can either be modified by clicking on the Edit (1-130_img_64.png) button, or deleted by clicking on the Delete (1-130_img_65.png) button displayed on the right-hand side when hovering the mouse over the defined exception.

1-130_img_66.png

Data Visualization

#SCI-7724 - Projects hierarchy navigation

The Projects hierarchy navigation feature has been improved to allow users to easily navigate from one project of the hierarchy to another using a breadcrumb in the Project Card.

The breadcrumb is displayed on the left-hand side, and the Workflow State Vote button has been moved to the right-hand side of the Project Card main toolbar.

1-130_img_67.png

In addition, the Undo (1-130_img_68.png) and Redo (1-130_img_69.png) buttons are always displayed. When the selected project is unlocked, the buttons are grayed out.

1-130_img_70.png

They are activated only when the selected project is locked.

1-130_img_71.png

Clicking on Projects Center in the breadcrumb allows the user to navigate back to the Projects Center workspace. It replaces the Back to Projects Center (1-130_img_72.png) button.

1-130_img_73.png

The last level of the breadcrumb displays the name of the selected project. Upon hovering over the project name and clicking on it, the project selector is displayed.

1-130_img_74.png

If there is only one level of hierarchy, the breadcrumb displays Projects Center (allowing the user to navigate back to the Projects Center workspace), and the selected project.

1-130_img_75.png

If there are two levels of hierarchy, the breadcrumb displays Projects Center (allowing the user to navigate back to the Projects Center workspace), the parent of the selected project, and the selected project.

1-130_img_76.png

If there are three levels of hierarchy or more, the breadcrumb displays Projects Center (allowing the user to navigate back to the Projects Center workspace), the More (1-130_img_77.png) button (indicating there are other levels in the hierarchy), the parent of the selected project, and the selected project.

1-130_img_78.png

When the user selects multiple projects in the Projects Center workspace, then clicks on the Open selection (1-130_img_79.png) button available on the left-hand side of the Main toolbar, the breadcrumb is displayed as follows.

1-130_img_80.png

Note: When the user selects multiple projects using the CCPM methodology, the Synchronize Projects (1-130_img_81.png) button is displayed on the left-hand side of the Undo, Redo, and Lock buttons.

1-130_img_82.png

Important: The breadcrumb is available in the Template Card.

1-130_img_83.png

GenAI

#AI-244 - Modified risk factors generation

In the Projects Center workspace, Project Card, Risks tab, Identified risks section, when users click on the Create Risk button, risk factors are now generated based on the actual cost, the baseline cost, the effort and the completed percentage.

#AI-197 - Enhanced AI project creation prompt

The AI project creation prompt has been enhanced to allow phases & gates to be defined and deliverables to be created while creating a new project using the With Anvi option.

In addition, a “Create Project with Deliverables” switch button has been added to the Create a new project popup.

1-130_img_84.png

Self-Service Reports

#SCI-7759 - Ability to have a dynamic Chart range selection

The chart creation feature has been improved to automatically align with filtered data.

Users can now create a chart by either clicking directly on the More (1-130_img_85.png) button in the column header or clicking on the dividing line between the column header and the first cell to select all data in that column. They must then right-click on the selected data (cells highlighted in blue) and select the Chart Range command.

1-130_img_86.png

1-130_img_87.png

1-130_img_88.png

When new rows matching the active filters are added, they are automatically included in the chart, ensuring that the visualization always reflects the most recent data without the need to manually reselect it.

Warning: If the selection is made in the header, the rows will be sorted.

#SCI-7758 - Ability to save the Chart section

In the Reports workspace, it is now possible to save the chart attached to the grid by clicking on the Save button located in the main toolbar.

1-130_img_89.png

The Save button is displayed when the user:

  • Selects a range of data in the grid and uses the Chart Range command to display the chart below the grid for the first time.
Note: If the user selects another report, then comes back to the initial report, the grid and the chart are displayed.
  • Modifies the selected range of data.
Note: The Save button is only displayed if the chart is linked to the grid.
  • Triggers an action from the Edit Chart command available when clicking on the More (1-130_img_90.png) button in the upper right corner of the Chart panel, for instance to modify the colors, etc.
  • Deletes the chart using the Delete Chart command available when clicking on the More (1-130_img_91.png) button in the upper right corner of the Chart panel.

Core Product Corrected Issues

Actions Center

#SCI-8041

In some scenarios, users were unable to create new actions in the Actions Center workspace. This issue has been fixed.

Authentication

#SCI-7191

When clicking on a deep link while not logged in to the platform, users were incorrectly landing on the default workspace when they were using the SSO login option, rather than the content of the deep link. This issue has been fixed.

Corporate Data

#SCI-7447

In the Corporate Data workspace, Resources tab, Resource Identification dialog box, Definition sub-tab, Cost & Availability section, when users were setting the “End Date” field to 01/01/2070, the date was automatically changed to 01/01/1970. This issue has been fixed.

Data Visualization

#SCI-4598

In the HTML5 Client, in grid tables with a horizontal scroll bar, when users were clicking on different cells or scrolling from left to right, the table was incorrectly jumping to the far right when connected in Hebrew.This issue has been fixed.

#SCI-3367

In the Home Page workspace, Home tab, Project Brief dialog box, data and icons were not correctly oriented when users were connected in Hebrew. This issue has been fixed.

Designer

#SCI-3005

In the Designer, Forms view, in some scenarios, an error was occurring when users were attempting to open a Formula (By Formula) field. This issue has been fixed.

Health Check

#SCI-8031

In some scenarios, health checks were failing due to concurrent modification exceptions. This issue has been fixed.

Overview

#SCI-7922

In the Overview workspace, data was not properly displayed when users were connected in Hebrew. This issue has been fixed.

Performance

#SCI-6944

In the Resource Dashboards workspace, Workload theme, Resource Utilization report, data loading could take a long time. This issue has been fixed.

Portfolio Dashboards

#SCI-7419

In the Portfolio Dashboards workspace, Project Monitoring theme, Roadmap report, columns could incorrectly be added twice in the Gantt spreadsheet. This issue has been fixed.

Power BI

#SCI-8095

In some scenarios, users were encountering an error when trying to connect the ProjectAdvantage connector in Power BI. This issue has been fixed. In addition, the "No valid data snapshot was found" message is now displayed in the error popup when there is no valid data snapshot.

Printing

#SCI-6666

In the HTML5 Client, in some scenarios, when users were printing reports in PDF format, the exported report was truncated and some columns were missing. This issue has been fixed.

Projects Center

#SCI-7653

In the Projects Center workspace, Project Card, locked projects were not automatically unlocked on session timeout or when users were manually logging out. This issue has been fixed.

#SCI-6293

In the Projects Center workspace, the projects selection was not consistent across all tabs and sub-tabs. In addition, when switching between projects, the UI was not refreshing correctly to display the currently selected project. These issues have been fixed.

Projects Center - Project Card - Finance

#SCI-8055

In the Projects Center workspace, Project Card, Finance tab, Transactions dialog box, Create recurring transaction dialog box, the “Saturday” and “Sunday” radio buttons were not displayed in the correct order. This issue has been fixed.

Projects Center - Project Card - Gantt

#SCI-7785

In the Projects Center workspace, Project Card, Gantt tab, when a resource calendar was modified to indicate that the resource was unavailable during a given period, the task end date and remaining duration of the assignment were not updated accordingly. This issue has been fixed.

#SCI-7313

In the Projects Center workspace, Project Card, Gantt tab, Gantt spreadsheet, when users were clicking on a column header and using the Equal (=) and “Not equal” (!=) Group by options applied to no value or a text value, no results were returned. This issue has been fixed.

#SCI-7311

In the Projects Center workspace, Project Card, Gantt tab, in some scenarios, when users were selecting the “Level Resources” command in the Gantt toolbar, the project start date could incorrectly be emptied. This issue has been fixed.

#SCI-1545

In the Projects Center workspace, Project Card, Gantt tab, when users were deleting tasks, the content of the deletion popup was different when selecting the “Delete” command from the Gantt toolbar and from the Gear button in the Gantt spreadsheet. This issue has been fixed.

Projects Center - Project Card - Overview

#SCI-5507

In the Projects Center workspace, Project Card, Overview tab, Definition sub-tab, when users were copying numbered text from Word and pasting it in the Description section, the copied numbering was not preserved. This issue has been fixed.

Projects Legacy - Work - Gantt

#SCI-8047

In the Gantt workspace, when users were locking a project to apply changes, an error message was displayed when they were using the Undo or Redo commands in the Gantt toolbar. This issue has been fixed.

Resource Dashboards

#SCI-4650

In the Resource Dashboards workspace, when users were launching reports in a new browser tab, then were selecting the Export to Excel command, some data could be missing from the exported file. This issue has been fixed.

Resource Validation - Timesheets

#SCI-7868

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, when users were clicking on the Submit button, pinned tasks were displayed with the status “Submitted”, even when no actuals had been previously entered. This issue has been fixed.

#SCI-7649

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, non-working days, previously submitted and approved in the Calendars tab, Calendar Details full screen view, Calendar tab, were not displayed. This issue has been fixed.

#SCI-6665

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, when users were clicking on the + Assignments button, the projects listed in the Project popup were incorrectly based on the access rights of the logged-in user, rather than those of the selected user. This issue has been fixed.

REST API

#SCI-7881

In the user-defined category REST GET API, if the name contained an underscore (_) in the middle, it was not mapped to the correct entry. This issue has been fixed.

#SCI-7843

In some scenarios, an error response was returned when users were trying to update the “ccbManagers” field for the organization through the REST API. This issue has been fixed.

Security

#SCI-7695 (*Added 02/02/2026)

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, after upgrading to version 2025.10, in some scenarios, an error message was displayed when users were submitting timesheets. This error was related to Content Security Policy (CSP). This issue has been fixed; a new environment variable (SCIFORMA_CSP_WHITELIST) has been introduced for configuring CSP settings.

The CSP domain whitelisting can be configured to allow trusted external domains.

For on-premises environments, this can be configured by adding the following property to the PSServer.properties file.

Example:

CspWhiteList.localhost.9090.sciforma=https://*.xyz.com https://*.abc.com

Format:

CspWhiteList.<domainName>=<whitelisted_urls_space_separated>

Note:
  • Replace <domainName> with server domain.
  • Specify one or more URLs separated by spaces.
  • The listed URLs represent the domains that will be whitelisted.

For hosted environments, customers must create a ticket and specify the URLs/domains to be added to the internal system.

Timesheet (built-in)

#SCI-7754

In the Timesheet (built-in) workspace, when users were clicking on the + Task(s) button to add new tasks to the timesheet, some tasks were not displayed in the Add to Timesheet popup as a maximum of 100 tasks could be displayed without applying filters. This issue has been fixed; the task limit has been removed.

#SCI-3059

In the Timesheet (built-in) workspace, users were incorrectly able to input data on Saturdays and Sundays when using a calendar which had weekend days set as non-working days. This issue has been fixed; Saturdays and Sundays are now not displayed when the “Hide Weekends” setting is activated.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Time Tracking Options section, Display Options sub-section.

Default Configuration Enhancements

Idea/Business Case

#MIL-5820 - Attachments now included when creating new Project from Idea

In the Ideas Center workspace, Idea Card, when the workflow state vote of an idea is changed to “New project”, the idea attachments are now included in the new project and displayed in the Project Card, Library Items tab, Attachments sub-tab.

1-130_img_92.png

1-130_img_93.png

Default Configuration Corrected Issues

Actions Center

MIL-5857

In the Actions Center workspace, Action Card, Comments dialog box, all comments could be edited, even when the logged-in user was not the author. The Comments dialog boxes in the Deliverable Card, Issue Card, Change Request Card, Risk Card, and Idea Card were also affected. This issue has been fixed.

Idea/Business Case

#MIL-5864

In the Portfolio Ranking workspace, Budget (1-130_img_94.png) and KPI (1-130_img_95.png) modes, when clicking on the + Work Item button at the bottom of the view to create a new Issue, a new Action, a new Change Request, or a new Deliverable, the buttons available in the bottom right section of the cards were incorrectly differing depending on the work item being created. This issue has been fixed, the buttons have been homogenized as follows:

  • Create – Allows the user to complete the Work Item creation and closes the card.
  • Cancel – Closes the card without creating the Work Item.
Note: This issue was also affecting the Work Item Cards when creating a work item in the Portfolio Work Management workspace, Work Items tab or in the Project Card, Work Items tab, or the Risk Cards when creating a risk in the Portfolio Work Management workspace, Risks tab.

Legacy Timesheet

#MIL-5886

In the legacy Timesheet workspace, a checkbox was displayed in the Pin column instead of the pin icon. This issue has been fixed.

Multi-projects CCPM

#MIL-5883

In the Multi-projects CCPM, Multi-projects Gantt, Projects Center, and Work Package Scheduler workspaces, Gantt tab, deleted tasks were still visible after the page had refreshed. This issue has been fixed.

News Page

#MIL-5880

In the News Page workspace, the product name was still referred to as ProjectAdvantage in the left panel. This issue has been fixed.

Overview

#MIL-5875

In the Overview workspace, a large blank space was displayed when users were scrolling to the bottom of the page. This issue has been fixed.

Portfolio Center

#MIL-5871

In the Portfolio Center workspace, Custom tab, when users were selecting a Responsible Organization, any changes made to the selected Responsible Organization was altering the order of the portfolio folders in the selector. This issue has been fixed.

Portfolio Dashboards

#MIL-5863

In the Portfolio Dashboards workspace, Project Monitoring theme, Roadmap report, columns could be added twice in the Gantt spreadsheet. This issue has been fixed.

Projects Center

#MIL-5872

In the Projects Center workspace, Project Card, Gantt tab, non-parent tasks were not aligned in the Gantt spreadsheet when users were connected in Hebrew. This issue has been fixed.

Projects Center - Project Card - Finance

#MIL-5885

In the Projects Center workspace, Project Card, Finance tab, when users were clicking on the Create snapshot in the left panel, the New Snapshot Definition popup could take a long time to be displayed. This issue has been fixed.

Projects Center - Project Card - Gantt

#MIL-5887

In the Projects Center workspace, Project Card, Gantt tab, Task Card, Transactions tab, an error message was displayed when users were trying to add new Cost Distributed transactions. This issue has been fixed.

#MIL-5870

In the Projects Center workspace, Project Card, Gantt tab, when users were connected in Hebrew, the main toolbar was not correctly aligned. This issue has been fixed.

Projects Center - Project Card - Task

#MIL-5869

In the Projects Center workspace, Project Card, Task tab, Tracking sub-tab, By Resources view mode, Outstanding Timesheets in the past popup, when users were clicking on the “Jump to timeframe” button, then were moving the time frame selection using the 1-130_img_96.png or 1-130_img_97.png arrow buttons, the previous or next time frame displayed was incorrect. This issue has been fixed.

Projects Legacy - Home Page

#MIL-5841

In the Home Page workspace, Monthly Status tab, the description displayed in the Accomplishments This Month section was truncated. This issue has been fixed.

System Requirements

There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which Planview ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.

Note: Users' system clocks must be regularly and accurately synchronized with the internet.

Servers

  • Application Server: Apache Tomcat 10.1 with Oracle Java 21 or OpenJDK21
  • Data Server: PostgreSQL 14, PostgreSQL16

HTML5 Clients

  • Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
  • Minimum of 4GB RAM allocated (8GB recommended).
  • Browser
    • Microsoft Edge
    • Google Chrome
    • Mozilla Firefox
    • Apple Safari

Planview ProjectAdvantage Designer

  • Recommended language: English
  • Display resolution: 1366 x 768
  • Minimum of 4GB RAM allocated
  • Disk space: 200MB minimum available for Planview ProjectAdvantage.
  • Oracle Java 21 or OpenJDK 21
  • Operating Systems:
    • Windows 7, 8.1, 10 or 11
    • Mac OS X Lion or newer
    • Alpine Linux 3.16.1

REST API

  • Supported language: English

Timesheets Mobile Application

  • Being hosted by Planview ProjectAdvantage
  • Product version: 2022.08 and upper versions

Planview ProjectAdvantage platform

Users will need to enable third-party cookies to work within Planview ProjectAdvantage. For more information regarding third-party cookies, please refer to the “How to allow third-party cookies” documentation.

For customers who subscribed only to ProjectAdvantage

  • Installation:
    • POD 11 is required if hosted by Planview ProjectAdvantage
    • An Hydra server is required if on premise
  • Product version: 2023.01 and upper versions

For customers who subscribed to ProjectAdvantage and Deliver

  • Installation:
    • POD 11 is required if hosted by Planview ProjectAdvantage
    • An Hydra server is required if on premise
  • HPV2 activated on Deliver modules (activated by default for all new Deliver Clients after 2021 Q3)
  • Product version: 2023.01 and upper versions
  • Users will need to allow third-party cookies in their browser

Limitations

The data connector:

  • Does not work in load balanced environments.
  • Is not compatible with Cloud Scheduled Jobs.
  • Is not compatible with dedicated API servers.
  • Is not compatible with the Java API.