This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2022.03 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2022.03 is a maintenance release of ProjectAdvantage 2022.

In the Core product, 4 enhancements have been implemented and 37 issues have been fixed.

In the ProjectAdvantage Default Configuration, 8 enhancements have been provided and 19 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.

Core Product Enhancements

Data Visualization

#SCI-879

In the Resource Validation workspace, Calendars tab, "The End date cannot be before the Start date" message has been enhanced. It is now displayed in a popup in the middle of the view.

#SCI-878

In the Calendar workspace, when a user clicks on a non-working day, the following message “Are you sure you want to edit a non-working day?” will now be displayed. Users will have to select either Yes or No.

Commands

#SCI-841

The capability to Undo/Redo changes on locked Work Packages (WP) has been added. The Undo and Redo commands now provide the ability to specify what category they operate on (Project or WP). Because of this new feature there are new limitations once a WP is locked. This limitation may affect Indent, Outdent, drag/drop of whole tasks, and cut/paste of whole tasks. In general, any operation that moves tasks into or out of a locked WP is not allowed because a subsequent WP Undo operation would either result in a loss of tasks or a duplication of tasks.

Designer

#SCI-783 (Added on 03/23/22)

Some users were unable to run the Designer when running a VPN and using a proxy. This issue has now been fixed.

#SCI-482

It is now possible to download the PSClient.jar using PSLauncher command line call.

Core Product Corrected Issues

Build

#SCI-962

Under certain situations, an Update Tables exception could occur from the Domain Config. Utility. This issue has now been fixed.

#SCI-833

In the About ProjectAdvantage dialog box, the Copyright Year was showing as the previous year. This issue has been resolved.

Commands

#SCI-677

The Completed date of a Transaction was displayed differently (one day later) in an exported Excel file than how it was displayed in the browser. This issue has been fixed.

Data Visualization

#SCI-1005

In the Task or Labor Assignment smart grids, a null pointer exception was thrown when effort and duration time scale were set to days. This exception was due to a cast issue when evaluating days. This issue has been fixed.

#SCI-923

In the Edit Calendar popup, duplicate work ranges were displayed if an approved vacation was converted from Vacation to Work. This issue has been fixed.

#SCI-906

In the Calendar workspace, the non-project tasks were not displayed correctly. This issue has been fixed. From now on, the event name will not be shown on the event but instead will be shown when the user hovers on the event.

#SCI-905

In the Calendar workspace, projects’ names were not always visible. This issue has been fixed. From now on, projects’ names will not be shown on the assignments but instead will be shown when the user hovers on the assignment.

#SCI-883

If multiple users accessed the selector in the same report and each used a text filter to filter the selector results, the filtered results could be incorrect due to a concurrency error. This issue has been fixed.

#SCI-880

In the Calendar workspace, Year view and Month view, the non working events were not displayed correctly. This issue has been fixed. From now on, only the events that will fit into the date cell will be displayed. If events do not fit into the date cell, a More… label will be available displaying few events. Also, the event name will only be shown when the user hovers on the event.

#SCI-859

When the "Show all tasks on the project row" Gantt option was selected, the Gantt labels were displayed too close to the bottom of the bar. This happened if the Project Gantt Bar definitions were short (e.g. using thin bars) and the Task Gantt Bar definitions were tall (e.g. using thick bars). This issue has been fixed.

#SCI-858

Tooltips being displayed when hovering over a Gantt bar improperly remained visible if the mouse was moved off the bar and into another panel (e.g. the grid panel to the left of the Gantt panel). This issue has been fixed.

#SCI-755

In the Designer Fields view, Default Formats tab, if Effort was set in Days, no data was displayed in the light client or an error was thrown. This issue has been fixed.

#SCI-754

It was possible for a customer to temporarily lose all their Overwrites (the problem was temporary because restarting the server solved the problem). It could occur when multiple users were performing certain operations at just the right moment. This issue has been fixed.

#SCI-689

The scale of the Allocated Effort field defaulted to "Day" when most effort fields defaulted to "Hour". Specifically, this happened when a user entered a "naked" number (a number with no time scale letter) into the Allocated Effort field when no data had ever been entered into that field (for that record) before. In that specific case (where the input didn't provide a scale and there was no existing data that provided a scale), the program picked the scale to use, but there was some inconsistency. This issue has been fixed. From now on, in this specific case, all fields of type effort will default to "Hour".

#SCI-668

An error was displayed when users clicked on the number of sessions displayed in the Sessions chart available in the Corporate dashboards workspace, Session Statistics tab. This issue has been fixed.

#SCI-649

Some deactivated projects could appear in some workspaces such as Timesheets and Validation when they should not have. This issue has been fixed.

#SCI-535

In the Calendar workspace, Year view, when a user clicked on a month name, the month that was displayed was not correct. This issue has been fixed.

Designer

#SCI-882

The error “Unexpected incompatibility... expecting 'old' and 'new' fields to access the same map value” could occur while trying to login to the Designer (or when trying to update the Default Configuration). This issue has been fixed.

Domain Config

#SCI-970

Domain Config utility is failing to launch due to new build infrastructure. This issue has now been fixed.

Legacy API

#SCI-887

In rare instances (dependent on the formulas defined in the system), processing that occurred during API session login caused a large number of errors and prevented the login from being successful. Additionally, all the errors caused the server to be busy and that may have prevented other users from successfully logging in. This issue has been fixed.

Localization

#SCI-384

The "31 Jan 03" date format was available in English but not in French. This issue has been fixed.

Object/Field Edits

#SCI-1017

The "Locked By" field in the Task category could not be used as a reference field to access "User" field values. In other words, the following Task formula was not accepted:

Locked By.Internal ID. This issue has been fixed.

#SCI-1004

A user could not specify the same vote a second time if they were using the drop-down in the Workflow State Vote field. Specifying the same vote again may be necessary in some cases. For instance, if the first vote displayed a dialog box that was canceled then a second vote would be needed (without canceling the dialog) to truly change the Workflow State. This issue has been fixed.

#SCI-1003

Data view records generated by the “Generate View” scheduled job might have incorrect data if that data depended on the Start and Finish dates specified in the Generate Data View dialog box or on the Start and Finish dates defined in the associated Data View Definition (where those dates are specified on a field-by-field basis). In other words, date range dependent data was likely generated incorrectly. This issue has been fixed.

Note: Start and Finish dates defined in the Data View Definition take precedence over the Start and Finish in the Generate View definition (which, by the way, can generate multiple sub-time-ranges depending on the value in the Interval column).

#SCI-921

The date format used for the Date column in the Organization History dialog was not honoring the default date format (as specified in the Default Formats tab in the Designer Fields view). This problem also sometimes resulted in a “Date Format Error” when the user edited a value in the Date column. This issue has been fixed.

#SCI-857

It was possible for a customer to lose all their system dashboard settings. This happened rarely and required multiple users to perform certain operations at just the right moment. This has been fixed.

#SCI-626

Under certain conditions, the Workflow State was not changing after a user "voted" for a new state, even though there was no error and no canceling of any pop-ups that may have been displayed (as part of the set of commands executed with the state change). The problem only seemed to occur when sending an email was one of the commands that got executed. This issue has been fixed.

Performance

#SCI-749

A small performance degradation appeared starting in build 2022.01. This has been fixed.

REST API

#SCI-901

When updating data for a task link with the REST API via a post or a patch request, if the schema contained a parameter for "predecessor_task_id" or "successor_task_id", then field data would not be updated. This issue has been fixed.

#SCI-875

Cost format entries which were deleted from the designer would reappear after using the REST API to create a new cost format entry. Under certain conditions, the REST API was using old data which contained the deleted entries causing them to reappear after a REST API save request. This issue has been fixed.

#SCI-824

When making a RESTAPI for user defined category records with a sort specified, the page of results returned may have contained the incorrect set of items for that page. This issue has been fixed.

#SCI-721

In the Designer Currency Format view, the Factor field could not be updated for a precise existing date. This issue has been fixed.

CFG Import/Export

#SCI-852

In some circumstances and after upgrading the Default Configuration, an error message could occur when changing User roles. This issue has been fixed.

Security

#SCI-894

There were some security vulnerabilities in the PSClient.jar. This issue has been fixed. The libraries in which vulnerabilities have been resolved are: commons-fileupload, jackson-databind, pdfbox ,jsoup ,commons-io , and commons-httpclient.

#SCI-738

There were some vulnerabilities in the jquery version. The issue has been fixed by upgrading the jquery version to v3.6.0.

Scheduled Jobs

#SCI-1022

"Update project permissions" and potentially other scheduled jobs failed when run as a “cloud scheduled job”. This was due to a timing issue on server start-up (the scheduled job shouldn’t have been started until a certain background task was completed). This issue has been fixed.

Default Configuration Enhancements

Designer

#MIL-3306

The External Applications workspace has been added to the Default Configuration (under the Built-in Workspaces label), allowing the "Super User" to create Application connections.

Projects

#MIL-3280

In the Work workspace, Tracking tab, a new By Tasks view mode has been implemented. With this new mode, the Project Manager will be able to manage his Project timesheets By Tasks instead of By Resources.

For that, a new global setting "Project Tracking Default View Mode" has been created to identify which view mode will be set by default in the ProjectAdvantage system.

The aforementioned setting is available in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Time Tracking Options section, Display Options sub-section.

Also, a new setting has been implemented to manage the default view mode at the Project level. This setting is accessible upon clicking on the Gear (1-85_img_0.png) button available in the Project Administration dialog box, Setup folder, Work Features section, Tracking feature.

In addition, a new setting has been implemented in the Display Options popup, enabling Project Managers to choose where the Remaining Effort value comes from. Two options are available: From Timesheet or From Labor Assignment.

#MIL-2944

In the Resources workspace, Resources tab, a new "Show Parent Tasks" option allows the user to display the Task hierarchy.

Note : This change has also been implemented in the Assignment Details Full Screen view.

#MIL-674

The workflow chip design has been homogenized in the following screens:

  • In the Work workspace, Agile tab, Activity Stream section in the Left Panel,
  • In the Work workspace, Agile tab, Dashboards full screen view, Activity Stream tab,
  • In the Work workspace, Work Items tab, Activity Stream section in the Left Panel,
  • In the Work workspace, Work Items tab, Dashboards full screen view, Activity Stream tab.

Execution

#MIL-3279

In the Timesheet workspace, it is now possible to display the full list of parent tasks. For that purpose, a new setting "Set Show Parent Task Scope", available in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Timesheet Options section, has been implemented.

Two options are available:

  • "One Level Only" – to display only the direct parent if the "Show Parent Task" option of the Timesheet is activated,
  • "All WBS Hierarchy" – to display the list of all the parents if the "Show Parent Tasks" option of the Timesheet is activated.
Note: This new behavior has also been rolled out in the Resource Validation workspace, Timesheet tab, Timesheet Details full screen view.

Portfolio Center

#MIL-3175

In the Portfolio Center workspace, Health Score tab, the Filters popup has been added to filter the list of Contributing Projects.

In addition, the Snapshots feature has been moved to the upper right corner of the view.

Administration

#MIL-2914

In the Resources workspace, a Custom tab can now be added. This tab is conditioned by the new "Enable Project Resources Custom Tab" setting.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Resources section.

Agile

#MIL-125

In the Work workspace, Agile tab, the Checklist icons have been updated to be more easy to understand.

Default Configuration Corrected Issues

Projects

#MIL-3352

In the "Project - Deactivate Project" command list, the ID was used instead of the Internal ID. This issue has been fixed.

#MIL-3307

In the Work workspace, Gantt tab, Scheduler view mode, in the Gantt Problems panel, the Allocation Requests section was displayed, even if the Resource Acquisition setup option was deactivated. This issue has been fixed.

#MIL-3200

In the Work workspace, Gantt tab, deleting a task could take an unusual amount of time. This issue has been fixed.

#MIL-3118

In the Resources workspace, Resources tab, the view could be empty if a Project had no Project Team defined and the "Performing Resources" setup was activated. This issue has been fixed.

#MIL-3099

In the Finance workspace, Transactions dialog box, when exporting the table to excel, the data in the Amount column was written with a text color in white and therefore were not readable. This issue has been fixed.

Resource Dashboards

#MIL-3327

In the Resource Dashboards workspace, Resource Utilization dashboard, Filters dialog box, the "Contract Type" filter did not work properly. This issue has been fixed.

Status Report

#MIL-3243

In the Home Page workspace, Status Reports tab, when creating a Status Report with the "External Resources" preference deactivated, blank rows were displayed. This issue has been fixed.

#MIL-3239

In the Home Page workspace, Status Reports tab, when creating a Status Report with the "Milestone Monitoring" Project setup deactivated, the Milestone Trend Analysis section was still displayed. This issue has been fixed.

#MIL-1524

In the Home Page workspace, Status Reports tab, Last Submitted view, it was not possible to select and copy data from the description sections. This issue has been fixed.

Resource Allocations

#MIL-3208

In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Requests Inbox sub-tab, for Requests linked to a Task, the user could allocate several resources (or make several Soft Allocations) to the same Task Allocation Request. This issue has been fixed.

#MIL-3184

In the Resource Allocations workspace, Resource Allocations full screen view, Hard Allocations tab, Resources Details sub-tab, the sorting options under the Matching Resources Requests section was incorrect. This issue has been fixed.

#MIL-3164

In the Resource Allocations workspace, Resource Allocations full screen view, Assignments tab, the tooltip for the Update button was missing. Besides, the text information in the dialog box did not emphasize the fact that this option targeted only Direct Allocations. Those issues have been fixed.

Resource Assignments

#MIL-3373

In the Work workspace, Gantt tab, Scheduler view mode, Labor Assignment dialog box, in some cases when the Project Manager wanted to edit an existing assignment, the interval and number of interval values were not displayed properly and it was impossible to navigate in the time frame. This issue has been fixed.

#MIL-3372

In the Work workspace, Gantt tab, Scheduler view mode, Assign Resource dialog box, it was not possible to remove a 0 value for the Already Assigned and New Assignments sections when the assignment was non-uniform. This issue has been fixed.

Note: The aforementioned behavior has also been rolled out for the Replace Resource dialog box as well as and in the Resources workspace, Resources tab, Grid view.

Portfolio Simulation

#MIL-3185

In the Portfolio Simulation workspace, when clicking on the Review (1-85_img_1.png) button to access the Review Scenario Projects dialog box, the view could take a lot of time to load, especially when charts were displayed. This issue has been fixed.

#MIL-3163

In the Portfolio Simulation workspace, after having played a scenario, in Analytics view mode, there were no Filters available in the External Workload folder in the Charts sub-tab. This issue has been fixed.

CCPM

#MIL-3054

In the Work workspace, Gantt tab, Scheduler view mode, symbols and bars representing dependencies were not available for CCPM projects. This issue has been fixed.

Template

#MIL-1997

In the Template Work Management workspace, a blank screen was displayed if the corresponding "Enable Template Actions", "Enable Template Deliverables" and "Enable Template Risks" settings were deactivated. This issue has been fixed.

Note: The aforementioned "Enable Template Actions", "Enable Template Deliverables" and "Enable Template Risks" settings are available in the System Settings workspace, Work Management Settings folder, Display Preferences tab, Template Work Management section.

Resource Validation

#MIL-3402

In the Resource Validation workspace, Calendars tab, Calendar Details full screen view, Calendar tab, the non-working days were not displayed correctly when the "Show Assignments" display option was enabled. This issue has been fixed.

Note: The behavior mentioned above has been rolled out at the Calendar workspace.

System Requirements

There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.

Servers

  • Application Server: Apache Tomcat 8.5 with Oracle Java 8 or OpenJDK
  • Data Server: PostgreSQL 10 to 12

HTML5 Clients

  • Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
  • Minimum of 4GB RAM allocated (8GB recommended).
  • Browser
    • Microsoft Edge
    • Microsoft Internet Explorer 10 or 11
    • Google Chrome
    • Mozilla Firefox
    • Apple Safari

ProjectAdvantage Designer

  • Display resolution: 1366 x 768
  • Disk space: 200MB minimum available for ProjectAdvantage.
  • Oracle Java 8
  • Operating Systems:
    • Windows 7, 8.1 or 10
    • Mac OS X Lion or newer
    • Linux