2020.07
This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2020.07 both in the Core product and in the ProjectAdvantage Default Configuration.
ProjectAdvantage 2020.07 is a maintenance release of ProjectAdvantage 2020.
In the Core product, 4 enhancements have been implemented and 20 issues have been fixed.
In the ProjectAdvantage Default Configuration, 13 enhancements have been provided and 40 issues have been fixed.
Note: Items with nearly identical features have been marked with an asterisk. For instance, if an issue was corrected for the Project* Center workspace, the correction would have been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.
In order to access the different sections, please click on the following links:
- Important Reminders for upgrade
- Important Notification
- Core Product Enhancements
- Core Product Corrected Issues
- Default Configuration Enhancements
- Default Configuration Corrected Issues
Important Reminders for upgrade
Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
Important Notification
Because ProjectAdvantage 2020.07 version comes with a critical correction for systems using the Risks feature, we strongly recommend to all Risks users to upgrade as soon as possible.
Please refer to the #42911 release note available in the Core Product Corrected Issues section for more information.
Core Product Enhancements
Designer
#42958
A new “Time Tracking” Category is now available, containing the “Timesheet Lock Date” field. The “Timesheet Lock Date” field is editable (unlike the Global field with the same name).
Note: The “Time Tracking” Category does not support User Defined Fields and none of its fields can be exposed.
Localization
#41185
In the HTML5 Client, the Data Snapshot feature is now available in Arabic.
Object Edits (Data Categories)
#40674
A new “Shift Distributed Data” command is now available for the “Data Update” command type. This new command only applies to User Defined time-distributed fields.

This new command provides the following parameters:
- Category
- Field – Indicates the time-distributed field the command is going to apply to.
- Split Date – Defines the date (with a Formula) from which the time-distributed data will be moved (i.e., all data following this date will be postponed).
- Interval – Indicates the time frame that will be taken into account to postpone the time-distributed data. The Interval can be defined with the values available in the drop-down or with a Formula (upon clicking on the More (
) button).
Note: When values have been both defined with the drop-down and a Formula, the Formula takes precedence and will be the only value taken into account. - # Intervals – Indicates the number of intervals the data is going to be postponed for.
Example: For a Split Date set to January 1st, 2019, defining a “Year” interval and a # Intervals of “1” will result in the time-distributed data being postponed to January 1st, 2020.
In addition, entering a negative value in the “# Intervals” parameter will indicate a backward shift to a date falling before the defined “Split Date”. In such a case, past data will be overwritten with the shifted values.
#40052
There is now a new “Hammock” yes/no field at the assignment level (for both labor and cost item assignments). A “Hammock” assignment duration will always be recalculated such that it corresponds to the existing time frame of the task (while honoring its calendar).
There is also a new “Hammock Assignment Mode” field at the task level; upon setting this field to “yes” for a given task, new assignments made to the corresponding task will automatically be “Hammock” assignments.
The “Hammock Assignment” complies with the following rules:
1) Display in the Gantt
A Task with at least one Hammock Assignment will be displayed in the Gantt graphic pane in the same way as if the user turned on the “Show non-parent tasks as a span bar” option (available in the Edit Gantt Block popup, Gantt tab). In other words, there will be no gap in the visual representation of the task, even if some non-working days exist for the assignment.
2) Hammock field update
Changing an Assignment “Hammock” field value (yes/no) can result in a modification of the Task.Duration, Task.Start, and Task.Finish fields value if there are some non-working days within the Task time frame. However, the Assignment Effort distribution will remain the same.
3) Duration modification
Previously, the Task.Duration field represented the maximum of all the assignments' durations and when the Task.Duration field was modified, all the corresponding assignments' durations were set to that value.
Now, Task.Duration will represent the maximum duration of all non-hammock assignments (and if all the assignments are hammocks it will represent the time between the task Start and Finish date, taking into account the Task's calendar). If the Task.Duration is modified only the duration of non-hammock assignments are set to that value and the task is then rescheduled based upon those new durations and the hammock assignments (if any) will "fill in" the task's new time frame (while honoring their calendars).
4) Task splitting
A Task with Hammock Assignments:
- Cannot be split during the Resource Leveling process
- Cannot be split by delaying the remaining portion of the Task
5) Hammock Task and Hammock Assignments
A Hammock Task is not compatible with Hammock assignments. As a consequence:
- It is not possible to perform a Hammock Assignment on a Hammock Task
- The “Scheduled Type” of a Task with at least one Hammock Assignment cannot be set to “Hammock”.
Core Product Corrected Issues
Commands
#42821
The “CC Save Baseline” command was not working correctly when the “Buffer Calculation Method” was set to “Percent of Duration”. This issue has been fixed.
#42220
Previously, when a grid provided information from a hierarchical User-Defined Category, using the “Indent” and “Outdent” commands to organize the grid rows was highly dependent on the selection order, which could cause some unexpected behaviors. This has been fixed; from now on, the “Indent” and “Outdent” commands will take into account the order displayed.
Important: This behavior only applies when the looping option for the “Indent” and “Outdent” commands are set to “None”. Otherwise, the selection order will still be taken into account.
Designer
#43191
In the Designer, Scheduled Jobs view, in a load balanced environment, if a Scheduled Job was disabled by unchecking the corresponding checkbox, the Scheduled Job status could keep displaying “Stopped” rather than “Interrupted”. This issue has been fixed.
#43190
In the Designer, Scheduled Jobs view, in a load balanced environment, modifying a Scheduled Job could result in all Scheduled Jobs marked as “ASAP” for next execution not starting. This issue has been fixed.
#43109
When a workspace contained a “Form Cell” embedded in a Text Block, it was possible to get inconsistent results each time the workspace was refreshed. This behavior was more likely to occur when the corresponding Forms were recently edited in the Designer Forms view. This issue has been fixed.
#43032
In some cases, Overwrites were not properly applied to values set by the “Set Field Values” command or to new Objects whose initial values were specified in a “Create” command. This issue has been fixed.
#42444
In the Designer Forms view, when importing a Form which was not part of a collection, in some cases, some blocks within the Form would not be imported correctly. This issue has been fixed.
#40747
When a Global Data View Definition was deleted, the corresponding “[Selected XXX]” reference field remained available as an “unknown” view instead of being deleted. This issue has been fixed.
#39378
In the Designer Forms view, when the user saved some modifications made to a Form, and then brought up the “Form Properties” dialog box without leaving the “Edit Mode”, after clicking on OK, all the subsequent changes made to the Form would fail to save properly upon using the “Save” command again. This issue has been fixed.
Object Edits (Data Categories)
#43085
Under rare circumstances, a “Task” User Defined Field was set in such a way that it pointed to a Data View record instead of a Task. As a consequence, the formulas that used this User Defined Field were incorrect, which led to the following behaviors: a “ClassCastException” error was logged into the server, and workspaces calling these formulas were not properly generated. This issue has been fixed.
#42911
When a reference field was used in a “view-to-view” relationship definition, if a “ParentView” data view record had a blank “Name” field, then when trying to access to the “ChildView” data records from this record, the result incorrectly included all the “ChildView” data view records whose “ParentView” reference field was not initialized. This issue has been fixed.
Important: This issue could cause the deletion of all existing Actions upon clicking on the “Cancel” button when creating a Risk.
#42692
When a user was automatically logged out (due to session Timeout), or when he/she logged out manually with multiple browser tabs open, some internal “clean-up” operations were not properly performed. As a consequence, Scheduled Jobs triggered by a logout were not executed and some data that should have been deleted after an “Undo” operation were not properly purged from the database. This issue has been fixed.
#41850
Some discrepancies could be encountered regarding Data Views and Permissions. For instance, users could create a data view record even if he/she did not have “write” access. This issue has been fixed; from now on, ProjectAdvantage will check the permissions prior to the data view record creation.
Please note the following rules:
- If a Data View does not have a Permissions column – The user’s permission on the “owner” (if any) controls the permissions on that Data View. In other words, permissions are inherited from the Data View’s Parent.
Example: If a project Data View is associated with project “Proj123” and a particular user does not have “Write” permissions for that project, then that user will not be able to create, edit, or delete project Data View records associated with that project. - If a Data View has a Permissions column – The permissions from the Permissions column (or the permissions defined at the Workflow level, if any) controls the users’ access to the Data View records. The “Owner” permissions (if any) are ignored.
Note: Because Global Data Views have no owner, any user would be able to create, edit, or delete records in a Global Data View with no Permissions column.
Performance
#43189
Some performance issues could be encountered when using the Publish command. This issue has been fixed; the command has been optimized.
#42080
In the Designer Forms view, when a Form had some “Form Cells” embedded in a Text Block, it could take a long time for the Form to be displayed after being selected. This was due to data being loaded from the server in order to display the value of the cell. This issue has been fixed; from now on, Form Cells are displayed as light blue rectangles, in which the label includes the field Name.
Printing
#41709
In some cases, Cost Item Units were not properly exported to Excel. This issue has been fixed.
UI Blocks
#43050
Upon using the new Project Selector Filters (introduced in the ProjectAdvantage 2020.05 version) in the Project Data Selector, the selected filters were automatically applied to all project selectors or fields based on the Project Category (e.g., popup selectors). This issue has been fixed.
#43027
In the HTML5 Client, in the Calendar Block (available in the Execution Calendar workspace for instance), Edit Calendar dialog box, upon changing the event type (Vacation, Jury Duty, etc.) in the Work Day field, all the entries of the Work Ranges section were cleared out. This issue has been fixed; from now on, upon selecting a value in the Work Day field, the Work Ranges entries will be replaced by the default work day ranges (with each work range drop-down updated accordingly).
#43012
In the HTML5 Client, the Calendar Block (available in the Execution Calendar workspace for instance) did not show the Non-Working days as greyed out when the “Day” interval was selected. This issue has been fixed.
#38493
In the HTML5 Client, using the “Delete” key of the keyboard to remove information from a cell located in a grid’s first row could result in an “IndexOutOfBoundsException” error. This issue has been fixed.
Default Configuration Enhancements
Multi-project Management (Phase 1)
This release provides a series of enhancements to introduce ProjectAdvantage multi-project management. The following new multi-project workspaces are now available under the “Projects” label:
- Home Page – Allows the user to review the News Feed and Critical Alerts on multiple projects at once.
- Scheduler – Same as the previous Scheduler workspaces.
- Work Management – Same as the previous Work Management workspaces.
- Administration – Allows the user to supervise and perform bulk-actions (Activate/Deactivate, Publish) on the selected projects.
- Dashboards – Existing multi-project dashboards that have been adapted for the new multi-project views: Status Overview, Project Effort Breakdown, Performance, Baseline Comparison, Phases & Gates, Agile, Billing, and Milestone Trend Analysis.
- Master Planning – Existing Master Planning workspace moved from the Portfolio label.
In addition, Nature-specific workspaces have been merged into a new set of workspaces available under the Planning label. Those new Planning workspaces only allow the users to select one project at a time. As a consequence, the Idea Center workspace has been moved under the Portal label.
Note: Nature-specific workspaces will still be available to allow our customers to move to the new workspaces at their own pace.
Administration
#MIL-223
In the Corporate Data workspace, Users tab, the new “Last Login Date” formula has been made available in the corresponding Field Set so that it can be added to the spreadsheet.
#MIL-221
The “Custom” filters can now be implemented in the following Portfolio workspaces:
- Portfolio Center workspace, Project Supervision tab
- Portfolio Ranking
- Portfolio Simulation
- Capacity Planning
Note: The “Enable Portfolio Filters Custom Section” setting is available in the System Settings workspace, Portfolio Settings folder, Display Preferences tab.
#MIL-215
In the System Data workspace, Custom Reports tab, it is now possible to define for which Organizations a Custom Report is available.
Note: In the event no Organization is selected, all Organizations will have access to the report.
Portal
#MIL-425
In the Project Portal workspace, the Project Data Selector now allows multi-project selection.
#MIL-424
In the Project Portal workspace, Planner tab, a new “Portal” Field Set has been associated with the Gantt view.
Portfolio
#MIL-423
In the Portfolio Simulation workspace, Simulation view mode, Workload chart, there are now two “Total Effort” series, allowing the user to make the distinction between the Soft Assignments’ effort and the Hard Assignments’.
#MIL-222
In the Portfolio Dashboards workspace, Phases & Gates report, Gantt view mode, a new “Summarize” option is displayed in the Gantt toolbar allowing the user to specify the level of detail (number of levels of descendant tasks) to display.
Project*
#MIL-626
The Chat Notifications feature (which is defined from the Project* Center workspace, Advanced Attributes dialog box) now supports pushing notifications to Microsoft Teams.
As a reminder, the following elements can be pushed through Webhooks:
- Project: Workflow Update, New Note, and Work Package Workflow Update
- Phases & Gates: Workflow Update
- Agile: Iteration Workflow Update, Release Workflow Update, Backlog Item Creation, Backlog Item Workflow Update, and Backlog Item Accepted
- Work Items: Creation, Workflow Update, and New Notes (for each category)
- Risks: Creation, Workflow Update, and New Notes
#MIL-360
In the Project* Scheduler workspace, Agile tab, the following changes have been implemented regarding the Backlog Item Effort values:
- The “Estimated Effort” and “Remaining Effort” fields (available in the Backlog Item dialog box, Planning section) can now be hidden depending on the Backlog Item Type. The Administrator can do so using the “Enable Estimated and Remaining Effort” setting located in the System Settings workspace, Agile Settings folder, Global Options tab.
- The “Estimated Effort” and “Remaining Effort” fields have been added to the Backlog Item dialog box, Tasks section.
- When the “Enable Activity Log” option (available in the Advanced Attributes dialog box, Agile folder, Backlog Item Sections Options section) is deactivated, the “Actual Effort” field becomes editable in the Backlog Item dialog box, Planning section.
Note: In the event no Backlog Item Type has been selected in the “Enable Estimated and Remaining Effort” setting, the “Estimated Effort” and “Remaining Effort” fields will be available for all Backlog Item Types.
#MIL-278
In the Project* Resources workspace, Dedicated Resources tab, the time distributed values will now be shown on non-working days.
#MIL-108
In the Gantt Filters dialog box, Status section, the user can now select multiple filters that are ruled by an “OR” mechanism. This enhancement has also been provided for the Gantt Filters panel (Project* Scheduler workspace, Planner tab, Scheduler view mode).
Resource
#MIL-220
From now on, when a Resource will submit his/her Timesheet, a new email notification will be sent to the Manager 1, 2, and 3 of the corresponding resource’s Organization.
Note: The email has been created in the Designer Email view, Triggered Messages tab.
Work Management
#MIL-193
The new Risk Monitoring view is now available, allowing the user to get a quick overview of the Risks (Status, Risk Level) and their corresponding Mitigation/Contingency Actions for multiple projects at once.
This view can be encountered in the following workspaces:
- Portfolio Work Management workspace, Project Monitoring tab
- Project* Work Management workspace, Risks tab (when selecting multiple projects)
- Project* Work Management workspace, Project Monitoring tab (when selecting a Program or Product)
Default Configuration Corrected Issues
Administration
#MIL-634
In the Gantt Filters dialog box, the Custom section did not display properly its content. This issue has been fixed.
Note: The Gantt filters Custom placeholder is displayed upon activating the “Enable Gantt Filters Custom Section” option available in the System Settings workspace, Project Settings folder, Display Preferences tab.
#MIL-545
In the Data Snapshots workspace, by default, none of the Reports were available. This issue has been fixed; the access rights for the “Entire Organization” have been set to “Download”.
Note: As before, only the “Administrator” user will be granted the “Delete” permissions on all reports included in the Default Configuration.
#MIL-490
In the System Data workspace, Idea & Business Cases tab, Value Lists sub-tab, upon creating a new Value in the Values dialog box (accessible upon clicking on the Gear (
) icon for a specific value), the value was still considered as selected after closing the dialog box. As a consequence, deleting a Value for another Value List also deleted the previously created Value. This issue has been fixed.
Execution
#MIL-465
In the Timesheet workspace, the Activity Logs could not be imported if the Timesheet was already partially submitted. This issue has been fixed.
Portfolio
#MIL-569
In the Portfolio Center workspace, Project Supervision tab, projects that did not meet the “Enable Health Score Project Type Filter” and “Enabled Types” settings were still sorted by the “Least Healthy First” and “Most Healthy First” sorting options, even though they displayed an “N/A” value. This issue has been fixed; all projects displaying an “N/A” value will be listed at the end of the list.
Note: The aforementioned settings are located under the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab, Health Score section.
#MIL-568
In the Portfolio Center workspace, Project Supervision tab, using the “Earliest First” or “Latest First” sorting options could be confusing as the projects Start dates were not displayed. This issue has been fixed.
#MIL-543
In the Portfolio Center workspace, Project Supervision tab, Notes dialog box (available upon clicking on the Notes (
) icon), the icon still displayed a red dot (
) even when there were no unread notes. This issue has been fixed.
#MIL-508
In the Portfolio Center workspace, Budget tab, Project Budget view mode, the Budget, Total Cost and Forecast Cost values displayed depended on the time navigation toolbar selection. This issue has been fixed; from now on, the overall values will be displayed, and the time navigation toolbar has been removed.
#MIL-507
In the Portfolio Dashboards workspace, Controlling report, the Overview and Cash Flow view modes did not display the same list of projects as in the Earned Value view mode. This issue has been fixed.
#MIL-453
In the Portfolio Dashboards workspace, Roadmap report, the Filters popup “Workflow States” filtering option did not work. This issue has been fixed.
Project*
#MIL-608
In the Advanced Attributes dialog box, Chat Notifications folder, Webhooks section, there was no default Workflow provided to define whether a Webhook was active or not. This issue has been fixed.
#MIL-604
In the Idea Center workspace, Details view mode, Scoring sub-tab, clicking on the Question Mark (
) icon displayed the Comments popup instead of the additional information regarding the indicator. This issue has been fixed.
#MIL-594
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Task Panel, Assignments tab, the “Not Synchronized” alert was not displayed in the event a task with an Allocation Request shifted in time. This issue has been fixed.
#MIL-580
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Project Gantt side panel, Problems section (when no task is selected), the “Planning” problems did not include parent tasks with no Baseline. This issue has been fixed.
#MIL-579
In the Project* Center workspace, Connections tab, Parent connections cards, the Delete (
) icon did not have a tooltip to clarify the action. This issue has been fixed.
#MIL-577
In the Business Case Center workspace, Definition tab, when selecting the “Approve as New Project” option as the final Workflow State, the project created from the Business Case was not automatically published. As a consequence, users could be confused as the “Free Budget” and “Available Budget” values displayed in the Portfolio Ranking workspace were not updated, since only data from published projects are taken into account. This issue has been fixed; the new “Enable Publish New Project when created from Business Case” setting has been provided.
Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Workflow Options tab, Project Workflow section.
#MIL-565
In the Project* Scheduler workspace, Status Reports tab, printable report (displayed in a new browser tab upon clicking on the “Full Report” button), Flagged tasks were not displayed in the Macro-Planning section, even when the “All Flagged Tasks” option was activated. This issue has been fixed.
Note: The “All Flagged Tasks” option is located in the Status Report Preferences dialog box, Tasks sub-tab.
#MIL-564
In the Project* Scheduler workspace, Tracking tab, when the “Enable Approve & Apply” setting was activated, the “Approve & Apply” button was displayed twice for Timesheets whose Status was “Submitted” or “Reviewed”. This issue has been fixed.
Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Time Tracking Options section, Commands Options sub-section.
#MIL-558
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when creating, synchronizing, or unlinking a dependency, if the user did not have the “Write Cost” permissions on the selected project, errors occurred. This issue has been fixed.
#MIL-544
In the Project* Scheduler workspace, Planner tab, a specific Distribution Type of a soft assignment was replaced by the default Distribution Type when it was fulfilled. This issue has been fixed.
#MIL-524
In the Project* Scheduler workspace, Agile tab, the “Not Accepted” filtering chip of the Iteration Full Screen view and the “Accepted” filtering chip of the Backlog Full Screen view were linked while they should not have. This issue has been fixed.
#MIL-518
In the Project* Resources workspace, Project Allocations tab, Allocation Requests view mode, the “Changes” button was no longer red when changes occurred. This issue has been fixed.
#MIL-505
In the Project Data Selector, the “Unread Notes” preset filter was erroneously available and was therefore confusing for the users as it did not work as expected. This issue has been fixed; this filter is no longer available.
#MIL-501
In the Project* Scheduler workspace, Tracking tab, Resource Details Full Screen view, the “Apply” button displayed a dropdown list for “Apply” options, even if only one option was available. This issue has been fixed.
#MIL-489
In the Project* Dashboards workspace, for Product and Program Natures, after selecting a “Custom” report from the Consolidation Dashboards section, going back and selecting a “Built-in” report displayed the same content as the “Custom” report. This issue has been fixed.
#MIL-456
Performing an Agile Migration (to use the new Agile feature introduced in ProjectAdvantage 7.1r) and then updating the Backlog Items Key (by using the corresponding Update (
) button available in the Advanced Attributes dialog box, Agile folder) could generate duplicates of existing Backlog Items. This issue has been fixed.
Note: The Migration tool is located in the System Settings workspace, Agile Setting folder if the “Activate Agile Legacy” setting is deactivated and the “Activate Agile” setting is activated. Both settings can be found in the System Settings workspace, General Settings folder, Meta Settings tab.
#MIL-454
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Project Problems panel, Allocation Requests Problems, it was not possible to click on the “Accept” button for Tasks belonging to a Work Package, and if the Allocated Resource did not belong to the Work Package’s Performing Resources. This issue has been fixed; from now on, the Resource will be automatically added to the Work Package Performing Resources.
#MIL-451
In the Project* Finance workspace, Budget tab, Snapshot History dialog box (accessible upon clicking on the “Manage Snapshots” button), Snapshot Details popup (available upon clicking on the “Details” (
) button for a given snapshot), the Comparison and the Total Cost sub-tabs provided different “Total Cost” values. This issue has been fixed; from now on, both the Overall Total and the Total for the period displayed will be available.
#MIL-450
In the Project* Scheduler workspace, Agile tab, Home Page view, the Burndown chart did not show any progress when set in “Effort”. This issue has been fixed.
Note: The user can display the Burndown chart with “Effort” values by setting to “Effort” the “Burndown Data” option available in the Advanced Attributes dialog box, Agile folder.
#MIL-442
In the Project* Center workspace, Connections tab, when creating a new connection to an existing project (upon clicking on the “New Connections” button, and selecting one of the “Connect to” options), no dependency was created, even if the proper settings were activated. This issue has been fixed.
Note: The aforementioned settings are “Activate Dependency” (System Settings workspace, General Settings folder, Meta Settings tab) and “Enable Dependency Creation” (System Settings workspace, Project Settings folder, General Options tab, Connections sub-tab, Dependency upon Creation section)
#MIL-395
In the Project* Scheduler workspace, Planner tab, Labor Assignment and Cost Item Assignment dialog boxes, Time Distribution section, the non-working days relative to the Project Calendar, the Resource Calendar, or the Cost Item calendar (depending on the case), were not correctly displayed. This issue has been fixed.
#MIL-69
In the Project* Scheduler workspace, Planner tab, Scheduler view mode, the “Remove Actuals” command (available upon clicking on the More (
) button of the Gantt toolbar) was still available even if the “Actuals from Tracking Source Only” was associated with a project Type. This issue has been fixed; the Administrator can now use the “Enable Remove Actuals Command” setting to prevent the users from accessing the “Remove Actuals” command. This setting can be enabled for User Roles and Natures.
Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Scheduler - Planner section.
Work Management
#MIL-589
In the Project* Work Management workspace, Risks tab, Risk Simulation Full Screen view, Simulation Scenarios tab, the “Projected Slippage” value was computed by taking into account the Default Calendar instead of the Project Calendar. This issue has been fixed.
#MIL-574
In the Project* Work Management workspace, Work Items tab, Work Item dialog box, Connections section, closed Backlog Items or close Work Items were available for selection when using the “Connect to Existing” command. This issue has been fixed.
#MIL-557
In the Portfolio Work Management workspace, Risks tab, Risks dialog box, Actions section, clicking on the “Create & Connect” command resulted in an unexpected exception. This issue has been fixed.
#MIL-539
In the Project* Work Management workspace, Risks tab, Risk dialog box, Mitigation Plan and Contingency Plan dialog boxes, Action-related information was still displayed when the “Enable Actions” setting was deactivated. This issue has been fixed.
Note: The aforementioned setting is available in the System Settings workspace, Work Management folder, Work Items tab, Actions section.
#MIL-510
In the Project* Work Management workspace, in multi-projects selection, the context of the selected projects was lost once any item Full Screen view was closed. This issue has been fixed.
#MIL-492
In the Work Items workspace, Change Request, Deliverable, and Issue dialog boxes, Actions section, when creating an Action using the “Create & Connect" command, the newly created action did not inherit the Parent of the Work Item it was created from. This issue has been fixed.
#MIL-469
In the Project* Work Management workspace, when creating a Work Item with an Assignee defined, an email was sent to the Assignee even if the creation was cancelled. This issue has been fixed.
Note: Email notifications are sent when the “Enable Email notifications” setting is activated (System Settings workspace, Global Options tab, Global Options section) and if the email feature is enabled in the system.
#MIL-466
In the Project* Work Management workspace, Risks tab, Notes dialog box, the note’s creator initials were not correctly displayed. This issue has been fixed.