This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2020.05 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2020.05 is a maintenance release of ProjectAdvantage 2020.

In the Core product, 7 enhancements have been implemented and 9 issues have been fixed.

In the ProjectAdvantage Default Configuration, 27 enhancements have been provided and 38 issues have been fixed.

Note: Items with nearly identical features have been marked with an asterisk. For instance, if an issue was corrected for the Project* Center workspace, the correction would have been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Designer

#42842

The “IN” operator is now supported when creating an Exposed Fields Filter in the Designer Fields view. As a consequence, in the Edit Filter dialog box, Row Entry tab, the “IN” option will now be displayed in the “Test” column drop-down and the “mismatched field types” warning will only be prompted when appropriate.

#42722

In order to allow Administrators to use Exposed Fields Filters to improve performances in certain situations, the Data View definitions now support Basis Fields from their own category. With this feature, it is now possible to create Exposed Fields based on Formulas.

Example: A project Data view called “ProjectView” which contains a Resource field can now have another Basis field for the Resource field’s “Internal ID”.

The new “Update DV same-category Basis Cols (internal)” Scheduled Job will automatically run upon importing a CFG file to update the DataView corresponding column.

Note: The “Update DV same-category Basis Cols” Scheduled Job used to update fields that depend on data from the same category (previously known as “Update Reference Field Columns”) has been enhanced accordingly.

#41975

The installation of the Default Configuration has been improved for better performances; from now on, the configuration will exclusively load on the server.

Gantt

#42786

The Gantt printing feature has been enhanced to provide a third option for the PDF Output. Indeed, from now on, the following options will be made available:

  • Single Page: The Gantt chart fits in a one-page document.
  • Actual Size: The Gantt chart is printed on several pages that can then be put together (assembled side-by-side on a board, for instance).
  • Custom fit (NEW): The Gantt chart is printed on a number of pages defined by the user.

1-56_img_0.png

Upon selecting the new “Custom fit” option, the user will be able to select the number of pages he/she wants to print the Gantt chart on:

1-56_img_1.png

Note: The input boxes can only contain integers from 1 to 99, otherwise the “Export” button will remain unclickable. If the integers specified exceed the 100% scale of the Gantt chart, then only pages corresponding to the scale of the Gantt will be printed.

Performance

#42869

Internal data structures enhancements have been provided to reduce the overall memory footprint.

UI Blocks

#42776

In the Edit Network Block and Edit Outline Block dialog boxes, Style tab, a new option has been added to specify whether to show or not a colored border around each cell contained in a Node.

1-56_img_2.png

Upon ticking the corresponding checkbox, the user can click on the More (1-56_img_3.png) button to select the color for the border.

In the HTML5 Client, the borders will separate the various contents of the Node:

1-56_img_4.png

#31962

New filtering capabilities have been provided for Project Data Selectors. Upon clicking on the Filters (1-56_img_5.png) icon of the Selector Search bar, a new panel is displayed, allowing the user to quickly filter the list of projects based on the following criteria: Presets, Versions, Types, My Filters, Managers, Owning Organizations, and Team Members.

1-56_img_6.png

Note: Presets will only be available if the corresponding filters have been defined as “Selector Enabled” in the Fields view of the Designer. To do so, the filter must first be marked as “Exposed” and “Searchable”.
Important: The “Type”, “Manager 1, 2, 3”, “Owning Organization” and “Performing Resources” fields need to be exposed for the corresponding categories to be available in the panel.

Core Product Corrected Issues

Commands

#42877

When a blank row was available at the bottom of an Assignment grid even if no Task was selected (due to unusual specific configuration), entering data on that blank row resulted in a “NullPointerException” error. The same type of error occurred whenever a user created an Assignment immediately after another user deleted the corresponding Task. This issue has been fixed; instead of the “NullPointerException” error, a “No items selected” message will be prompted, as a Task needs to be selected for the operation to be successful.

#42837

When a user whose login name differed from his/her official Login ID (due to upper/lower case differences) invoked a command that created a new tab in the browser, the new tab did not honor the global values that were in effect in the tab it was created from. This issue has been fixed.

Designer

#42939

When including a date with a specific time in a Formula, the time information was lost upon editing the Formula. For instance, the “Finish = 04/30/2020 05:00 pm” formula turned into “Finish = 04/30/2020” when editing it. This issue has been fixed.

Field Edits (Field Types)

#42797

When the resource “Organization History” dated field was displayed in the HTML5 Client, the field displayed the current Organization Name instead of the historical Name (as of the date for the entry). This issue has been fixed.

#42553

Some user-defined Rich Text fields had invalid data; this could cause “NullPointerExceptions” errors when attempting to display these fields in the HTML5 Client workspaces. This issue has been fixed.

#42227

The daylight savings time calculation for determining entered dates were not correct for the southern hemisphere. This issue has been fixed.

Object Edits (Data Categories)

#42941

In the Designer Fields view, Default Formats tab, when the user selected a default date format that was near the end of the drop-down list, the server could become unstable. As a consequence, the following could occur:

  • Sometimes, users were unable to log in to ProjectAdvantage (the “Unable to construct session” error would be logged on the server).
  • Running an “Update Project Permissions” Scheduled Job could cause some data loss for the Project Fields which had pick-lists.

This issue has been fixed.

UI Blocks

#42878

When a Gantt Block “Refresh on selection or update” option (available in the Edit Gantt Block dialog box, Gantt tab, Display section) was set to update a Form in which the Gantt was embedded into, a “Failed to update content” message could be displayed upon modifying data in the Gantt. This issue has been fixed.

#42855

When a lot of data was created over the years (causing unique ID values to be very large numbers), the default sorting of Data View records by unique ID could fail, which resulted in a “Comparison method violates its general contract!” error. This issue has been fixed.

Default Configuration Enhancements

Timesheet

This release comes with a series of enhancements that aim at providing a better Timesheet experience for Team Members. While new capabilities were added to the Timesheet, we also took the opportunity to upgrade the design as well.

MIL-256

In the Timesheet workspace, a new Filters popup provides the following filtering options:

  • Hide Corrections: Allows the user to temporarily remove the Corrections rows when the corresponding feature is activated.
  • Hide Planned Values: Allows the user to temporarily remove the Planned Values rows.
  • Hide Zero Effort Assignments: Allows the user to temporarily remove the Assignments rows for which he/she has no Effort values.

MIL-149

In the Timesheet workspace, the project Name has been made overwrites-friendly. The Administrator can now provide some additional information to the end-user by overwriting the “Overwritable Project Name” field.

MIL-148

In the Timesheet workspace, and in the Resource Validation workspace, Timesheets tab, the Submit buttons have been enhanced to be overwrite-friendly. The user can now overwrite the new “Timesheet Submit Filter Overwritable” filter available at the resource level to add conditions for the Submit button to be displayed.

MIL-114

In the Timesheet workspace, upon submitting a Timesheet, a flash message is now displayed to confirm the success of the operation. The display of the flash message is conditioned by the “Enable Timesheet Submit Flash Message” setting.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Time Tracking Options tab.

MW-4462

In the Timesheet workspace, the “Hide” feature has been extended to the Project level, allowing the user to hide a project with all its underlying tasks that are available in the Timesheet.

MW-3234

In the Timesheet workspace, the Non-Project Tasks have been separated from the project Tasks; they are now displayed in the top rows of the Timesheet, with a distinct color.

Note: The same changes have been implemented in the Resource Validation workspace, Timesheets tab, Detailed view mode.

MW-2664

In the Timesheet workspace, the Total row has been moved up to the top of the Timesheet, for a better visibility.

Note: The same changes have been implemented in the Resource Validation workspace, Timesheets tab, Detailed view mode.

MW-2536

In the Timesheet workspace, a new command has been added to facilitate the addition of Non-Project Tasks to the Timesheet. Therefore, the Non-Project project is no longer available for selection upon using the “Add Assignments” command.

Note: The same changes have been implemented in the Resource Validation workspace, Timesheets tab, Detailed view mode.

MW-1692

In the Timesheet workspace, upon hiding all the Tasks of the same project, the corresponding project row will be hidden as well.

Project*

MIL-291

In the Project* Resources workspace, Project Team tab, when adding a new Team Member, the Selector popup will now display the Job Classification of each Resource.

Note: This also applies to the Project Creation process.

MIL-254

In the Project* Scheduler workspace, Task Details dialog box, Scheduling & Tracking sub-tab, a new Owning Organization field has been created, allowing Project Managers to work with an Organization Breakdown Structure (OBS) in the Gantt chart.

Note: When the Owning Organization has been defined for at least one project Task, the corresponding filtering option will be available in the Gantt Filters dialog box, Outline section.

MW-4644

In the Project* Scheduler workspace, Status Reports tab, Status Report History dialog box, a new “Print All” command is now available in the toolbar, allowing the user to generate a printer-friendly version of all the previously submitted Status Reports. In addition, both the “Print All” and “Print Selected” commands provide now the following options:

  • All Sections: Opens the integrality of the Status Report versions in a new browser tab for printing,
  • Specific Sections: Opens the Print selection popup allowing the user to select which sections of the Status Report will be available in the printable version.

MW-4593

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Filters dialog box (accessible upon clicking on the Filters (1-56_img_7.png) icon available in the Gantt toolbar), two new filters have been added allowing the user to only display Tasks which are “Closed” or “Not Closed”.

Note: Those filters are also available when using the CCPM methodology.

MW-4590

In the Project* Dashboards workspace, the Baseline selection mechanism has been enhanced. When the user wants to compare two Baselines or select a specific Baseline for filtering purposes, from now on, the Name and the Baseline date will be displayed.

Note: Report properties have been updated accordingly.

MW-4076

In the Task Details dialog box (accessible from the Project* Scheduler workspace, Planner tab, Scheduler view mode for instance), Cost Items & Transactions sub-tab, a new Details (1-56_img_8.png) button allows the user to access the corresponding Transaction and Cost Item Assignment dialog boxes.

MW-4043

In the Project* Center workspace, Definition tab, and in the Project Information dialog box, the Stakeholders section now indicates when and by whom the project has been created, modified, and published.

Note: From now on, the Project Brief dialog box will also indicate the name of the user who last published the project.

MW-3952

In the Program/Product Consolidation Dashboards workspaces, Controlling report, Financial Overview view mode, the breakdown by Cost Center is now supported.

MW-1221

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, in the Gantt Task side panel, Task Form tab, the Finish Date and Required Date fields are now available.

Resource

MW-4578

In the Resource Validation workspace, Calendars tab, Details view mode, when the Resource's Calendar Status is “Working” or “Rework”, the Resource Manager has now the capability to either “Submit” or “Submit & Approve” the Calendar by selecting the corresponding option in the Submit button dropdown.

MW-4576

In the Resource Validation workspace, Calendars tab, Overview view mode, the following columns have been added:

  • 1-56_img_9.png Details: Provides quick access to the Calendar Details popup
  • 1-56_img_10.png Submit: Allows the user to directly Submit the calendar instead of the Team Member
Note: The Calendar Details (1-56_img_11.png) access has also been made available in the Details view mode.

Portfolio

MIL-267

In the Portfolio Center workspace, Project Supervision tab, Filters popup, a new filtering option has been added to only display projects with no Status Report created yet.

MIL-61

In the Portfolio Dashboards workspace, Status Overview report, a new Custom section placeholder has been added for the project Cards. It is managed by the new “Enable Project Status Overview Cards Custom Section” setting available in the System Settings workspace, Portfolio Settings folder, Dashboards tab.

Note: The Custom placeholder is also available for the Status Overview report cards of the Product/Program Consolidation dashboards. This Custom placeholder is managed by the same setting, which has been duplicated in the Project Settings folder, Dashboards tab, Program/Product Consolidation Dashboards section.

MW-4574

In the Portfolio Work Management workspace, Project Monitoring tab, the “Project Nature” and “Project Type” filters are now supporting multiple selections.

Note: This enhancement has also been implemented in the Portfolio Dashboards workspace, and in the Portfolio Center workspace, Supervision tab.

MW-3873

The Resource Allocation feature has been enhanced to allow Project Managers to convert Soft Assignments into Allocation Requests from the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Task Panel, Assignments tab.

This request will be associated to the Task to which the Soft Assignment was made, and this Soft Assignment will be automatically fulfilled with the Allocated Resource (only one Resource can be allocated for a Request Associated to a Task).

Note: This feature is only available if the “Enable Convert Assignment Into Request” option is activated in the System Settings workspace, Resource Settings folder, Allocations & Commitments tab.

Execution

MIL-62

In the Overview workspace, Assignments (Next 3 months) spreadsheet, a new Availability row is now available.

Note: The chart section has been updated accordingly.

MIL-49

In the Overview workspace, Assignments (Next 3 months) spreadsheet, two new columns have been added to enhance the visibility:

  • Period Effort: Indicates the Total Effort for the three months displayed
  • Remaining: Indicates the Remaining Effort from Today's date to the end of the Assignment

Work Management

MIL-32

In the Project* Work Management workspace, Work Items tab, when selecting multiple projects, the List view mode has been replaced by an Overview view mode, similar to the Portfolio Work Management workspace, Project Monitoring tab.

Default Configuration Corrected Issues

Project*

MIL-363

In the Project* Scheduler workspace, Status Reports tab, the submission of a Status Report could fail if some overwrites were performed on the “Actual Cost”, “Remaining Cost” or “Total Cost” built-in fields. This issue has been fixed.

MIL-315

In the Assign Cost Items dialog box, when accessing the Assignable Cost Items dialog box (by clicking on the More (1-56_img_12.png) button and selecting “Manage Assignable Cost Items” command), adding or removing a Cost Item from the Assignable Cost Items list did not refresh the corresponding Cost Items list in the Assign Cost Items dialog box. This issue has been fixed.

MIL-305

In the Project* Scheduler workspace, Tracking tab, “Outstanding Timesheets in the past” popup, (accessible upon clicking on the “Details” label of the corresponding alert), when only the “Timesheets not approved” alert was found, the “Show Applied” chip button was not activated. This issue has been fixed.

MIL-302

In the Project* Scheduler workspace, Tracking tab, when multiple projects were selected, Impact Management full screen view, the cards of the “Attention Points” section of the left panel displayed an unwanted scrollbar. This issue has been fixed.

MIL-299

In the Project* Scheduler workspace, Tracking tab, Timesheet Details full screen view, the “Not compliant with Activity Logs” filtering option was not working properly. This issue has been fixed

MIL-298

In the Project* Scheduler workspace, Tracking tab, in the prompted popup asking the user whether he/she wants to access the Impact Management full screen view after applying the Timesheets, the “Don't ask again for this session” option was not working properly. This issue has been fixed.

MIL-289

In the Project* Scheduler workspace, Tracking tab, Timesheet Details full screen view, after opening the Planned Effort tooltip form (by hovering the Alert button (1-56_img_13.png)), the Timesheets could no longer be displayed properly. This issue has been fixed.

MIL-286

In the Project* Scheduler workspace, Roadmap tab, Gate Review view mode, the options “From Last Submitted” and “From Blank” were not available when creating a new report, even if at least one project status report existed. This issue has been fixed.

MIL-280

In Time Navigation toolbars, activating the “Custom” switch button (when available) resulted in the deactivation of the “Today”, “Jump To”, and “Presets” buttons throughout the solution. This issue has been fixed.

MIL-273

In the Project* Scheduler workspace, Tracking tab, when accessing the Impact Management full screen view with multiple projects selected, if a task was selected from a project, then changing to another project would keep the previous task selection. This resulted in the display of the previously selected task data in the Gantt side panel of the current project. This issue has been fixed.

MIL-252

In the Project* Dashboards workspace, Project Dashboard report, Risks section, the “High” Risk Level was not colored as it should have been. This issue has been fixed.

MIL-251

In the Project* Resources workspace, Project Allocations tab, Allocation Requests view mode, Allocation Request Details dialog box (accessible upon clicking on the Gear (1-56_img_14.png) button and selecting the “Edit Allocation Request Details” option), the Allocated Effort could be modified by Project Managers. This issue has been fixed.

MIL-248

In the Project* Scheduler workspace, Tracking tab, the “Last Impacts” button was always available, even if Timesheets were never applied. This issue has been fixed.

MIL-245

In the Project* Scheduler workspace, Planner tab, Filters dialog box, when the “Completed” filter was activated, it was not possible to deactivate it by using the “Reset Filters” command available in the Gantt toolbar and in the Gantt Filters panel More (1-56_img_15.png) menu. This issue has been fixed.

MIL-243

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, the “Create Dependency” command was still available when the “Activate Dependencies” meta setting was deactivated. Similarly, the “Create Sub-Project” command was also still available when the “Activate Connections” meta setting was deactivated. This issue has been fixed.

Note: The aforementioned settings are available in the System Settings workspace, General Settings folder, Meta Settings tab.

MIL-240

In the Project* Resources workspace, Project Allocations tab, the Build Allocation Requests feature was sometimes not working properly if the “Update Existing Open Allocation Requests” option was turned on. This issue has been fixed.

MIL-235

In the project* Advanced Attributes dialog box, Finance folder, the Forecast Labor Type field was not hidden when the “Activate Forecast Cost” Meta-Setting was disabled. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, General Settings folder, Meta-Settings tab.

MIL-230

In the Project* Scheduler workspace, Status Reports tab, Status Report History dialog box, Status Report Details popup, Budget section, the Transactions outside the project boundaries were not taken into account. This issue has been fixed.

MIL-224

In the Project* Scheduler workspace, Status Reports tab, “Phases & Gates” flow charts were not sorted in the same way in the printable Status Report and the History Status Report. This issue has been fixed.

MIL-219

In the Project* Resources workspace, Project Team tab, the “Add my Team” command was still available when the “Set Project Team Add Resource Scope” setting was empty. The same issue occurred during the Project Creation process and in the Manage Project Team & Generic Resources dialog box. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Global Options tab, Project Team and Dedicated Resources section.

MIL-207

In the Project* Scheduler workspace, Agile tab, Full Backlog full screen view, when adding the “Assignee” field to the spreadsheet, all Users were available for selection instead of the restricted list of users corresponding to the project's Team Members or the related Iteration's Team Members. This issue has been fixed.

MIL-191

In the Assign Resources dialog box (accessible from the Project* Scheduler workspace, Planner tab, Scheduler view mode for instance), performance issues could occur if the Project Team was composed of a significant number of Team Members. This issue has been fixed; the Assignable Resources list (left panel) is now limited by the “Set Max. Number of Advanced Cards” display control setting.

Note: The aforementioned setting is available in the System Settings workspace, General Settings folder, Display Controls tab.

MIL-189

In the Assign Resources dialog box (accessible from the Project* Scheduler workspace, Planner tab, Scheduler view mode for instance), the upper-right header could display an unwanted scrollbar if the Project and/or Task name were too long, or if the Start or Finish dates were too long as well. This issue has been fixed.

MW-4517

In the Assign Cost Items dialog box, (accessible from the Project* Scheduler workspace, Planner tab, Scheduler view mode for instance), after assigning a Cost Item, the time-distributed values shown in the right panel of the dialog box would display erroneous values when the Cost Item did not have any availability for a given period. This issue has been fixed.

Work Package

MIL-263

In the Work Package Scheduler workspace, Roadmap tab, Deliverables view mode, the “New” button was not available to create Deliverables. This issue has been fixed.

Portfolio

MIL-239

In the Portfolio Center workspace, Project Supervision tab, Status Report popup, Macro-Planning section, the “% Completed” column was too small to display a “100%” completed value, making the spreadsheet difficult to read when multiple tasks were fully completed. This issue has been fixed.

MIL-214

In the Portfolio Dashboards workspace, Phases & Gates report, Supervision view mode, the Legend popup did not contain information about the Status Report and Health Score indicators. This issue has been fixed.

MIL-213

In the Portfolio Dashboards workspace, Phases & Gates report, Supervision view mode, the Status Report “Overdue” indicator was missing. This issue has been fixed.

MIL-205

In the Portfolio Dashboards workspace, Roadmap report, the “Drill down to see the project details” command no longer made sense, since it opened a read-only project full screen view. This issue has been fixed.

MIL-204

In the Portfolio Dashboards workspace, Controlling report, Overview view mode, projects with negative Total Cost values were not displayed. This issue has been fixed.

MIL-101

In the Portfolio Simulation workspace, Compare Projects popup (accessible by clicking on the “Review Scenario Projects” button (1-56_img_16.png)), when the Show Charts display option was activated, an unwanted scrollbar could be displayed. This issue has been fixed.

Resource

MIL-247

In the Organization Center workspace, Overview tab, data could be incorrect if a resource was previously selected from the Resource Details tab or from the Resource Validation workspace. This issue has been fixed.

MIL-246

In the Resource Dashboards workspace, Organization Statistics report, data was not refreshed after activating a filter. This issue has been fixed.

Execution

MIL-155

In the Calendar workspace (and in the Resource Validation workspace, Calendars tab, Details view mode, Calendar Details popup), when selecting the “Month” view, the names of the Projects were not properly visible. This issue has been fixed; the style of both the Assignments and Approved Calendar Requests cards were updated with a lighter background color and a darker font color.

Work Management

MIL-287

In the Project* Work Management workspace, Work Items tab, Work Item full screen view, left panel Task cards, a scrollbar was displayed if the Task name was too long. This issue has been fixed.

MIL-253

In the Project* Work Management workspace, Work Items tab, Dashboards full screen view, no empty state was displayed when no Work Item existed yet. This issue has been fixed.

MIL-182

In the Project* Work Management workspace, Risks tab, Risk Simulation full screen view, the “Projected Impact Cost” and “Project Slippage” fields did not react correctly. This issue has been fixed.

Administration

MIL-312

In the System Data workspace, Cost Centers tab, the “Insert Before” and “Insert After” commands were not working properly when the Budget Type setting was set to “Effort”. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Budget/Finance Settings folder.