This document describes the enhancements, corrected issues and new features which have been implemented in ProjectAdvantage 2020.04 either in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2020.04 is a maintenance release of ProjectAdvantage 2020.

In the Core product, 3 enhancements have been implemented, and 15 issues have been fixed.

In the ProjectAdvantage Default Configuration, 15 enhancements have been provided and 38 issues have been fixed.

Note: Items with nearly identical features are indicated by an asterisk. For instance, if an issue has been corrected for the Project* Center workspace, it means that the correction has been implemented in the Project Center, Business Case Center, Product Center, Program Center, and Template Center workspaces.

In order to access to the different sections, please click on the following links:

Important Reminders for upgrade

Core Product Enhancements

Core Product Corrected Issues

Default Configuration Enhancements

Default Configuration Corrected Issues

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.

Core Product Enhancements

Config Utility / Installation

#42764

ProjectAdvantage versioning is now changed to calendar convention (year.month). The next release in April will be ProjectAdvantage 2020.04.

Object Edits (Data Categories)

#42754

There are now two new [Global] fields which are, [Current Timesheet] and [Selected Timesheet]. These fields provide access to the current and selected Timesheet objects respectively.

UI Blocks

#42042

The selection behavior in the Gantt is now available in all Grid Blocks (but not in Text Blocks). If the “single selection” or “multiple selection” option is turned on in the “Edit Grid Properties” dialog box for a particular Grid Block, that block (when displayed on the HTML5 client) will have a selection column and selection behavior similar to the selection column and behavior available in the Gantt Block.

One difference is that, “thumb/drag-drop” column (on the far-left edge of the Gantt grid) remains unique to the Gantt and is not available in Grid Blocks.

Core Product Corrected Issues

Built-in HTML5 Client

#42820

The change made in 7.1x (#41014) was redirecting a user to another instance during its session when he was refreshing the page (this occurred in load-balanced environments only). It has been decided to revert back to the previous behavior, when it comes to how we handle the JSESSSIONID and the load-balancing. This change applies therefore to all types of environment and remains transparent for the simple ones. This has been fixed. Now, the user was not redirected to any other instance when the page was refreshed (“F5”).

Commands

#42825

The “Execute once” command was returning a “No items updated” error (in some instances) when, instead, the command should not be processed if the formula returns an empty list of items. This has been fixed.

#42780

When defining a Condition for an "Execute once" command, the category was the same as the category of the items returned by the formula. For instance, if the context of the command was Global and the "Execute once" formula returned a set of Tasks, the category of the condition should not have been Task it should have been Global. This has been fixed.

#42756

In the “Edit Command” dialog box, when defining a formula for either the “Loop based on each item” or the “Execute once on all items specified by” option, the program would sometimes determine the incorrect “referenced category” of the formula (e.g. the referenced category for [Global].[Selected Task] should be Task), thus not allowing the Designer to specify the proper commands (e.g. Set Fields Value for a particular category) in the grid below. This has been fixed.

#42529

The “Execute once by formula” command list option was not working correctly in server-side command lists. The error message looked something like: “Server-side command list execution failed at command 1 of 1…”. Additionally, the “Execute once by formula” was clearing out more selections than necessary. This option should not cause selections to be cleared out in categories not controlled by the formula. For example, if the formula evaluates to a set of Tasks, then Project and Resource selections should be maintained and only Task selections should be overridden by the formula. These issues have been fixed.

Designer

#42851

If a command list was imported from cfg (which had a conditional command list group) and one of those commands had an HTML Scriptlet command, any fields used in the scriptlet command would be marked as #BAD_FIELD# after the cfg import. This has been fixed.

#42759

The incorrect currency was chosen as backer for the currency definition for displaying data, if locale/language information was not available for the ProjectAdvantage instance. This has been fixed.

#42725 – Modified on May 4, 2020

In the Choose Icon dialog box, Agile category, the Add and Remove icons presented some visual discrepancies. This has been fixed.

#42717

An undefined or null reference exception was intermittently encountered when generating a report on Edge browser. This has been fixed.

#42462

When a dialog box was too long, the button panel would be rendered off-screen and thus became unclickable. This has been fixed so that a scroll panel was added when the dialog box took up more than 75% of the screen.

#42363

When going into Design Mode in the User Roles view, it was possible that the “Default Workspace” option would be set to blank even though it was non-blank prior to entering design mode. If the user was exiting design mode without changing anything, the “Default Workspace” option would typically be set back to its non-blank value. This has been fixed.

Object Edits (Data Categories)

#41833

A java.lang.StackOverflowError error was encountered in some project fields when used in a transaction formula field. This has been fixed.

Performance

#42593

In a load balanced environment, a problem with ProjectAdvantage cache configuration would occasionally cause some processes to hang indefinitely. This problem could cause a scheduled job that would never finish or database connections that would never be returned to the connection pool. This configuration problem has been fixed.

#42550

Very slow performance on servers has been encountered. An optimization has been implemented that reduces login time in a busy load balanced system. This has been fixed.

UI Blocks

#42628

When Organizations, Resources, or Cost Items were selected and the form was calculating the set of Tasks or Labor Assignments that corresponded to that selection, the calculation was inaccurate (typically the set was missing some members) especially when multiple items were selected. This has been fixed.

Default Configuration Enhancements

Project* Scheduler workspace, Tracking tab

This release offers a completely redesigned experience for applying the Timesheets in the Project* Scheduler workspace, Tracking tab. To help the Project Manager keep the progress up to date while making any required decision to maintain his/her project on track, the following features are provided:

  • Overview of the potential discrepancies between the Timesheets and the initial plan in the Home Page,
  • Deeper analysis of each Team Member’s activity with the Timesheet Details view,
  • Both “individual” or “bulk-actions” options for the “Approve”, “Apply”, and “Rework” commands, and
  • Detailed review of the consequences (in terms of dates, rate, and effort) of the “Apply” action thanks to the Impact Management view.

Tickets that have been resolved with the Tracking tab Redesign

Jira Ticket #Description
MW‑4283Provide visibility over the % Applied for a specific period
MW-3922Emphasize the Remaining Effort before applying it
MW-3670Provide visibility over Outstanding Timesheets in the past waiting for approval
MW-3375Restrict the display to Projects relevant to Tracking (e.g., with Actual or Planned Effort)
MW-3127Provide the ability to Apply the Timesheets for all the selected Tasks
MW-3126Rearrange the Timesheet approval buttons to match the order of the actions to perform
MW-3125Always display the action buttons in the Project* Scheduler workspace, Tracking tab
MW-2649Make the Corrections available in the Project* Scheduler workspace, Tracking tab
MW-2284Remove the “Approve” command for Timesheets whose Status is “Working”
MW-2191Remove monthly overlap in the Project* Scheduler workspace, Tracking tab
MW-1682Provide the ability to automatically add new Resources to the Project Team upon applying the corresponding Timesheet
MW-1476Provide better visibility for Planned and Applied Effort in the Project* Scheduler workspace, Tracking tab
MW-700Provide an empty state view when no Timesheet is to be submitted in the Project* Scheduler workspace, Tracking tab

Project*

#MIL-190

The Resource Problem Formulas have been optimized. As a result, the Health Score is now calculated much faster than before, optimizing the loading time of views where the Health Score is displayed, such as the Portfolio Center workspace, Project Supervision tab, for instance.

#MIL-42

In the Project Portal workspace, from now on, the Data Selector will only display the Published version of projects.

Note: In the same way, only Published projects will be available for selection upon creating a Work Item in the Client Portal workspace, and in the Execution Work Items workspace.

#MW-4348

In the Project* Center workspace, Definition tab, an alert indicator (1-55_img_0.png) is now displayed if the entered project “Deadline” (or “Finish Constraint” for projects using the CCPM Methodology) falls before the project Start Constraint.

Note: The new alert has also been added to the Project Information dialog box, as well as the Basic Attributes step of the Project Creation process.

#MW-4097

In the Assign, Fulfill, & Replace Resources dialog box, the spreadsheet in the upper part of the dialog box now features a “Total” column, allowing the user to review the Total Effort for the selected time period. This enhancement has been provided for all the possible assignment contexts (mono and multi-selection, Allocation Request, Resource Request, etc.).

Note: The same enhancement has been provided for the Assign Cost Item dialog box.

#MW-3531

In the Project Dashboards workspace, Billing report, the Total Cost/Total Revenues values (which are used to compute the margin) have been added to the Summary section.

#MW-2989

All the views featuring a Project Data Selector (which are not Timesheet-related) have been updated to no longer show the “Non-Project” project. The list of impacted views includes the following:

  • Project Administration workspace
  • Project* Center workspace
  • Project* Scheduler workspace
  • Project* Resources workspace
  • Project* Finance workspace
  • Project* Work Management workspace
  • Project* Dashboards workspace
Note: Project List popups allowing the selection of a Project have also been enhanced.

#MW-2837

In the Project* Scheduler workspace, Project Information dialog box (accessible upon clicking on the corresponding “Edit” (1-55_img_1.png) button), the Notes (1-55_img_2.png) icon has been added in the upper right corner, allowing the user to access the project Notes dialog box, and to know whether or not there are new Notes.

Portfolio

#MW-4284

In the Portfolio Center Workspace, Project Supervision tab, a new indicator (1-55_img_3.png) is displayed when a Status Report is Overdue. This indicator is conditioned by the new “Status Report Alert Granularity (days)” setting, and the corresponding filtering option is now available in the Project Supervision tab, Filters popup.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Status Report Options tab.

Work Package

#MW-4514

From now on, upon locking a Project, the corresponding Work Packages (if any), will be locked as well. In the Work Package Center and Work Package Scheduler workspaces, a new message (located in the footer of the views) will indicate whether the Work Package is locked or not.

#MW-4371

The Project* Scheduler workspace, Roadmap tab is now available in the Work Package Scheduler workspace as well.

Resource

#MW-4552

In the Resource Brief dialog box, a new “Resource Work Items” sub-tab is now available, providing the list of Work Items the selected Resource is assigned to. The view comes with a Time Navigation toolbar, allowing the user to only display the Work Items whose “Estimated Date” falls in the selected time frame.

Note: The display of the Resource Work Items sub-tab is conditioned by the Work Management Meta Setting (available in the System Settings workspace, General Settings folder, Meta Settings tab).

Execution

#MW-4579

In the Calendar workspace, the “Show Assignments” switch button is now deactivated by default.

Administration

#MW-4513

In the System Settings workspace, Resource Settings folder, Global Options tab, the new “Enable Timesheet Validation Non-Project” setting allows the Administrator to split the Actual Effort into two categories (Project Effort and Non-Project Effort) in the Resource Validation workspace, Timesheets tab, Overview view mode.

Note: The Calendars tab, Overview view mode has been updated as well for homogenization purposes (relative to the Timesheets tab, Overview view mode).

#MW-4291

In the System Settings workspace, Project Settings folder, the “Enable Project Activate/Deactivate Commands” setting has been moved from the Workflow Options tab to the Global Options tab, Project Maintenance section.

#MW-4231

In the Corporate Data workspace, Users tab, the “Show Inactive” display option has been updated to be overwrite-friendly. From now on, Administrators can use the “No Rights User_Overwritable” User formula to include more User Roles for the “Show Inactive” display option.

Default Configuration Corrected Issues

Project*

#MIL-171

In the Project* Finance workspace, Budget tab, Overview view mode, Charts section, the Direct and Indirect budgets were not stacked, which made it more difficult to compare the budget with the Total Cost (or Effort) of the selected project. This issue has been fixed.

#MIL-166

In the Project* Scheduler workspace, Billing tab, the view modes toolbar displayed an unwanted scrollbar in small resolution. This issue has been fixed.

#MIL-165

In the Project* Center workspace, Definition tab, Advanced Attributes dialog box, Dependencies folder, the “Master Planning” option was available for all the project Natures, while it should have been available only for Programs. This issue has been fixed.

#MIL-163

In the Template workspaces, Advanced Attributes dialog box, the “Default Iteration Duration (d)” Agile option was not available. This issue has been fixed.

#MIL-158

In the Project* Scheduler workspace, Planner tab, XML Updates view mode, importing an XML file from a project previously exported using the “Tasks Only” scenario did not create tasks. This issue has been fixed.

#MIL-151

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt spreadsheet, clicking on a Work Package Task’s Gear (1-55_img_4.png) icon still displayed the “Convert into Work Package” command. This issue has been fixed.

#MIL-142

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, when inserting a Template containing Generic Resources, duplicates were created if the Generic Resources imported with the Template already existed in the selected project. This issue has been fixed.

#MIL-141

In the Project* Scheduler workspace, Resources tab, Resource Utilization Details view mode, when a resource was selected, an error occurred upon clicking on the Resource Utilization Overview view mode icon (1-55_img_5.png). This issue has been fixed.

#MIL-135

In the Project* Scheduler workspace, Status Reports tab, Status Report History dialog box, Status Report popup, the Agile Summary Timeline was missing. This issue has been fixed.

#MIL-132

In the Create New project* popup, when all the “Import Options” were available (e.g., when creating a new project from an existing one with all the possible object categories available for import), the last option overlapped the footer's buttons. As a consequence, the display was not adequate and the buttons were not entirely clickable, even if the options were hidden. This issue has been fixed.

#MIL-130

In the Project* Scheduler workspace, Agile tab, Iteration full screen view, Board tab, an empty state was displayed only if the “Stretch Items” filter was activated; a blank view was displayed when no item met the other filters. This issue has been fixed.

#MIL-129

In the Project* Scheduler workspace, Planner tab, Manage Baselines dialog box (accessible upon clicking on the “Manage Baselines” (1-55_img_6.png) button), removing the baseline for the selected tasks only made the Baseline card to disappear, even though the Baseline for the other Tasks of the project still existed. This issue has been fixed.

#MIL-122

In the Project* Scheduler workspace, Tracking tab, in the Timesheet Details view, the tasks were not sorted alphabetically. This issue has been fixed.

#MIL-100

In the Project* Resources workspace, Project Allocations tab, “Gap-Allocations - Assignments” chart, the Assigned Effort included both the hard and soft assignments without distinction, while the Soft and Hard Allocated Effort were represented by two different series. This issue has been fixed.

#MIL-99

In the Project* Resources workspace, Project Allocations tab, the charts Y-axis was always displaying “hours” values, even when it should have been “days”.This issue has been fixed.

Note: The format of the Y-axis is driven by the Effort “Default Formats” tab available in the Designer, Fields view.

#MIL-97

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Problems side panel, “Dependency Synchronization” detailed problems, an unwanted scroll bar was displayed when the Target Task Name was too long to fit. This issue has been fixed.

#MIL-96

In the Project* Scheduler workspace, Planner tab, Scheduler view mode, Gantt Problems panel, CCPM (Tracking) problems, the “Tasks with open Risks” problem was still listed even though it is now included in the Work Objects problems. This issue has been fixed.

#MIL-78

In the Project* Resources workspace, Project Team tab, a User defined as the Manager of a selected project, but not defined as the Manager of any Organization branch, could add Team Members if the other Project Managers were defined as the Manager 1, 2, or 3 of at least one Organization branch. It occurred when the “Set Project Team Add Resource Scope” setting was set to “Managed Teams”. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab, Project Team and Dedicated Resources section.

#MIL-76

In the Project* Scheduler workspace, Transactions tab, Filters popup, the Date section filters did not work as expected. This issue has been fixed.

#MIL-72

In the Project* Scheduler workspace, Planner tab, after inserting a project template containing Deliverables, the Estimated Effort values on those Deliverables were not copied properly. This issue has been fixed.

#MIL-70

In the Project* Scheduler workspace, Cost Items tab, Assignment List view mode, it was not possible to add a column to the spreadsheet. This issue has been fixed.

#MIL-57

In the Project* Scheduler workspace, Status Reports tab, the printable version of the Status Report always included the Agile Summary section, even if the “Use Agile Methodology” option was deactivated for the corresponding project. This issue has been fixed.

Note: The aforementioned printable Status Report is available upon clicking on the “Full Report” button, or by clicking on the printer (1-55_img_7.png) icon for a Status Report in the Status Report History dialog box.

#MIL-53

In the Project* Resources workspace, Project Team tab, the End Date value in the Resource card (for Allocated, Committed, or Dedicated resources) did not honor the End Date of the granted Usable Effort. This caused the “Assignment outside boundaries” indicator to be displayed when the resource was assigned. This issue has been fixed.

#MIL-47

In the Project* Finance workspace, Budget tab, Details view mode, upon adding a new Project Cost Center, if no Cost Center was selected from the list of Global Cost Center, a hidden row was erroneously created causing the empty state message to disappear while no row was displayed. This issue has been fixed.

Note: If no cost center is selected while clicking on the OK button of the “Global Cost Center” popup, the popup will be closed without project cost center creation.

Resource

#MIL-131

In the Organization Center workspace, Overview tab, Submitted Timesheets section, the empty state could sometimes not be displayed as expected. This issue has been fixed.

#MIL-81

In the Resource Validation workspace, Timesheets tab, Overview view mode, the Actual Effort column did not honor the Default Format defined for Effort fields (in the Designer). This issue has been fixed.

#MIL-71

In the Resource Allocation workspace, Hard Allocations tab, when creating a new Hard Allocation by clicking on the “New Hard Allocations” (1-55_img_8.png) command, the newly created allocation was attached to the Deactivated version of the selected project (if any). This could occur when turning a Business Case into a Project for instance, as the Business Case was automatically deactivated. This issue has been fixed.

Portfolio

#MIL-136

In the Portfolio Dashboards workspace, Phases & Gates report, Gantt view mode, Filters popup, there were no options to narrow down the Phases and Gates that were displayed. This issue has been fixed.

#MIL-87

In the Portfolio Simulation workspace, Analytics view mode (when a scenario is running), the organization name was not up to date if it was previously modified. This issue has been fixed.

#MIL-64

In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, the “Cost Centers” filter (available in the Filters popup) did not work as expected. This issue has been fixed.

Work Package

#MIL-147

In the Work Package Scheduler workspace, if the user has Write access to the Work Package and only a read-only access on the project, the user could not create a Status Report. This issue has been fixed.

#MW-4580

In the Work Package workspaces, the Usable Effort value was always equal to the Available Effort. This issue has been fixed; from now on, the Usable Effort value will take into account the Resource’s Origin.

Work Management

#MIL-143

In the Project* Work Management workspace, Work Items tab, Project Information panel, the content of the “Last 2 days” section was missing. This issue has been fixed.

#MIL-133

In the Deliverable dialog box (read-only version), an empty space was displayed after the Planning section if no description was entered, making it confusing for users. This issue has been fixed.

#MIL-115

In the Template Work Management workspace, Deliverables tab, Grid view mode, clicking on the “New Deliverable” (1-55_img_9.png) command did not create a Deliverable directly attached to the selected Template as expected. This issue has been fixed.

#MIL-86

In the Project* Work Management workspace, Work Items tab, the Home Page Activity Stream could take time to render when lots of entries existed. This issue has been fixed.

Note: The number of displayed Activity Stream elements is conditioned by the “Set Dashboard Details Max. Records” setting (located in the System Settings workspace, General Settings folder, Display Controls tab).

Administration

#MIL-144

In System Settings workspace, Project Settings folder, Time Tracking Options tab, deactivating the “Enable Approve & Apply commands” setting had no effect on the Project* Scheduler workspace, Tracking tab, Detailed Approval view mode. This issue has been fixed.

#MIL-137

In the System Settings workspace, General Settings folder, Meta Settings tab, deactivating the “Activate Agile” meta setting did not hide the Agile Activity Logs In the Timesheet workspace, Activity Logs panel. This issue has been fixed.