This document describes the enhancements, corrected issues, and new features that have been implemented in Vantage and in ProjectAdvantage 2023.04 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2023.04 is a maintenance release of ProjectAdvantage 2023.

In Vantage, 5 issues have been fixed.

In the Core product, 2 enhancements have been implemented and 12 issues have been fixed.

In the ProjectAdvantage Default Configuration, 4 enhancements have been provided and 43 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.
  • From the 2023.01 version, to support the implementation of the new Vantage navigation and modules, the Project Dashboards workspace should be added again in the User Roles section of the Designer as the Dashboards workspace doesn't exist anymore.

Vantage Corrected Issues

Timesheet (built-in)

#VAN-119

In the Timesheet (built-in) workspace, the page was not automatically refreshing when the user was applying changes (for instance when approving a timesheet or sending it back for rework) or when the user was switching to another workspace then back to the Timesheet (built-in) workspace. This issue has been fixed.

#VAN-83

In the Timesheet (built-in) workspace, Week view, rework comments were incorrectly showing for weeks preceding and following the specific week for which they had been entered. This issue has been fixed.

#VAN-82

In the Timesheet (built-in) workspace, Week view, tasks were not showing in the Tasks panel when the user was adding them to the timesheet. This issue has been fixed.

Data Connector

#VAN-130

In Vantage, the data connector was duplicating tasks each time an object was modified in Deliver. This issue has been fixed.

Navigation

#VAN-125

In the Project Dashboards workspace, when the user was launching a report in a new browser tab, the newly opened tab was displaying the default Vantage workspace. This issue has been fixed.

Core Product Enhancements

Build

#SCI-2358

The internal cache load has been optimized for Resources, Projects and Users.

Object/Field Edits

#SCI-2149

In order to avoid having milestones delayed each time a project’s progress is updated, it is now possible to complete a “Task with assignments” milestone when the “Actuals From Tracking Source Only” option is turned on.

Core Product Corrected Issues

Object/Field Edits

#SCI-2384

An error message was displayed when the user was logging in then clicking on any workspace. This issue has been fixed.

#SCI-2382

In the Corporate Data workspace, Resources tab, an error message was displayed when the user was selecting a new date in the popup displayed after clicking in the “Availability” column, and the date was not saved. This issue has been fixed.

#SCI-2128

In the Corporate Data workspace, Resources tab, it was not possible to select any currency other than the Default Currency Format in the popup displayed after clicking in the “Cost” column and the filled in value was automatically converted to the Default Currency Format, making it impossible to work with multiple currencies. This issue has been fixed.

REST API

#SCI-2383

Due to an issue with the comparator logic, a "Comparison method violates its general contract" error message was returned when users were trying to retrieve tasks, projects and timesheets. This issue has been fixed.

Data Visualization

#SCI-2417

An error message was displayed when users were trying to launch the Designer. This was due to the Organization table being corrupted in the Organizations section, Organizations tab. This issue has been fixed.

#SCI-2407

In the “UsageEvent” query history Data Output spreadsheet, the Edge browser was wrongly detected as Chrome. This issue has been fixed.

#SCI-2374

In the Work workspace, a "NullPointerException" could occur when users were trying to open projects. This was due to dummy organizations in the Project data, which were causing the code to fail. This issue has been fixed.

#SCI-1905

In the System Data workspace, Organizations tab, an error message was displayed when the user was trying to modify an organization’s Manager. This issue has been fixed.

Security

#SCI-2402

For on-premise environments, the HTTP Host Header was previously not validated to ensure requests were originating from the target host. This issue has been fixed; a domain name whitelisting approach has been implemented to mitigate the Host header injection vulnerability and configuration instructions have been provided.

#SCI-2171

When the user was proceeding to a search, some special characters could be wrongly interpreted in the search bar and the search was not working as expected. This issue has been fixed.

Import/Export CFG

#SCI-2065

When the user was importing a form which contained a specific currency format for a Cost field, the format was not properly imported after a CFG import. This issue has been fixed.

Designer

#SCI-2341

When creating an exposed filter in the Fields view of the Designer, then adding this filter in a Selector block of a form, and then overwriting the filter, the filter should have been overwritten, but it was not. This issue has been fixed.

Default Configuration Enhancements

Resource Allocations

#MIL-4189

A new "Hide Other Published Projects" setting has been implemented to allow the administrator to either hide or display the "Other Published Projects" section in the Resources workspace, Resources tab. In addition, a new "Other Published Projects_Overwritable" formula has been created in the Resource category to allow the administrator to further control the display of this data.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Resources section.

#MIL-4047

In the Work workspace, Gantt tab, Scheduler view mode, Gantt Task panel, Assignments sub-tab, when the user converts a Soft or a Generic Assignment into a request, the requested organization managers are now displayed in the “Create Allocation Request” dialog box.

#MIL-3810

In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Request Inbox sub-tab, users can now click anywhere in cards to display information in the Request Details view.

Administration

#MIL-4052

In the System Data workspace, Job Classifications tab, the user now has the possibility to add new columns from a field set.

Default Configuration Corrected Issues

Project Management

#MIL-4246

In the Work workspace, Tracking tab, By Resources view mode, Collapsed display option, the “Notes” button was appearing as a blue icon even though there were no notes on the timesheet. This issue has been fixed.

Note: The aforementioned behavior has also been rolled out for the Expanded display option.

#MIL-4215

In the Resources workspace, Project Allocations tab, Project Allocations full screen view, Requests tab, Request Inbox sub-tab, when the user was clicking on the “Assign/Fulfill from Allocation” command, Assign from Allocation dialog box, then when the user was clicking on the “Edit Task” command, two “Close” buttons were displayed in the Task Details dialog box. This issue has been fixed.

Styling

#MIL-4245

In the Project Selector, when the user was logged in Spanish, the "Aceptar" button was not correctly displayed. This issue has been fixed.

#MIL-4181

In the Resources workspace, Resources tab, when the user wanted to add a new assignment on a specific project, the arrow displayed in the selector was not correctly oriented. This issue has been fixed.

Designer

#MIL-4237

Some new attributes have been assigned to the workspaces displayed in the new navigation when the Vantage platform is activated in the Designer, Vantage section.

#MIL-3896

In the Designer, Command Lists section, the "Apply - Project Tracking - Resource - Apply Both - Continue" command contained a follow-up command that had been deprecated. This issue has been fixed.

Work Package

#MIL-4235

In the Work workspace, Gantt tab, Scheduler view mode, an error message was displayed when the user was converting a task to a work package then locking the project. This issue has been fixed.

Project Scheduler

#MIL-4231

In the Resources workspace, Resources tab, Grid view, the "Details" icon was not the correct one. This issue has been fixed.

#MIL-4220

In the Work workspace, Gantt tab, Scheduler view mode, Gantt Task panel, Task Form sub-tab, the “Complete Milestone" button was displayed for gates. This issue has been fixed.

Resource Allocations

#MIL-4230

In the Resources workspace, Project Allocations tab, Project Allocations full screen view, Allocations tab, Resource Details sub-tab, the "Resource Assignments" section was missing. This issue has been fixed.

#MIL-4227

In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Requests Inbox sub-tab, when the user was fulfilling a request with multiple resources splitting the requested effort equally, the split values were incorrect. This issue has been fixed.

#MIL-4214

In the Resource Allocations workspace, Resource Allocations full screen view, Hard Allocations tab, Resources Overview sub-tab, when the user was selecting the “Update Allocations” command, the new allocations that were created included effort instead of being empty. This issue has been fixed.

#MIL-4101

In the Resources workspace, Project Allocations tab, Project Allocations Dashboards full screen view, Resource Usage Gap Analysis tab, the indicator displayed when the actuals were significantly under the corresponding allocated effort was incorrect. This issue has been fixed.

#MIL-4067

In the Resources workspace, the Project Allocations tab was not available if the "Enable Project Allocation Requests" setting was deactivated, even if Direct Allocations were enabled. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Resources section.

Resource Management

#MIL-4228

In the Organization Center workspace, logged in users were able to see the data related to the Resources, Users and Cost Items of parent organizations even though they did not have the relevant permissions. This issue has been fixed.

#MIL-4221

In the Resource Fulfillment workspace, data was only displayed in the spreadsheet if the project had at least been published one time. This issue has been fixed.

#MIL-3413

In the Resources workspace, Resources tab, filtered resources were not shown if the number of unfiltered resources exceeded the value defined for the "Set Resource Views Max. Records" setting. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, General Settings folder, General Options tab, Display Controls section.

#MIL-3293

In the Corporate Data workspace, Resources tab, Resource Identification dialog box, the Organization History was incorrect. This issue has been fixed.

Portfolio Dashboards

#MIL-4224

In the Portfolio Dashboards workspace, Controlling theme, Capacity Planning report, the intervals were not correctly displayed in the different graphs. This issue has been fixed.

#MIL-4069

In the Portfolio Dashboards, Project Monitoring theme, Status Overview report, the “Search” filter was sometimes not working as expected. This issue has been fixed.

Work Package

#MIL-4222

In the Work Package Scheduler workspace, Status Reports tab, when the user was creating a new status report from blank, the “Decisions” and “Meeting Attendees” sections were filled. This issue has been fixed.

Work Items

#MIL-4205

In the Work workspace, Work Items tab, Actions full screen view, if the project’s name was too long, it was overlapping the tabs. This issue has been fixed; from now on, the project’s name appears first in the full screen view’s header.

#MIL-4188

In the Home Page workspace, Work Items full screen views, the "Group by" button was not working and the user could not group the Work Items. This issue has been fixed.

#MIL-3177

In the Work workspace, Work Items tab, when the user was changing the Workflow State of any Work Item, the workflow comments entered as new notes were not sent as chat notifications when the option was activated. This issue has been fixed.

Status Report

#MIL-4195

In the Home Page workspace, Status Reports tab, submitted status reports could be edited by the project’s other managers. This issue has been fixed.

#MIL-3687

In the Work workspace, Phases & Gates tab, Gate Status Reports full screen view, when the user was clicking on the “Print” button, some sections could be missing. This issue has been fixed.

#MIL-3395

In the Work Package Scheduler workspace, Status Reports tab, Full Report popup, Risks section, the risk initiator was displayed instead of the owner. This issue has been fixed.

Execution

#MIL-4137

In the Timesheet workspace, when the user was importing all Activity Logs, under certain conditions, some tasks were not created as new assignments. This issue has been fixed.

#MIL-3985

In the Timesheet workspace, when the user was clicking on the “+ Assignments” command, the hierarchy icon was not properly displayed in the Project list popup. This issue has been fixed.

#MIL-3938

In the Work workspace, Tracking tab, timesheets under the “None” status incorrectly showed an “Applied %” value. This issue has been fixed.

#MIL-3749

In the Work workspace, Tracking tab, Timesheets Details full screen view, the “Rework” button was not available if the timesheet summary status was "Submitted". This issue has been fixed.

Project Dashboards

#MIL-4131

In the Project Dashboards workspace, Finance theme, Overview report under Consolidation Dashboards for Products or Programs, when the user was activating the "Cost Center" display, the selected Product’s or Program’s costs were missing. This issue has been fixed.

#MIL-4050

In the Project Dashboards workspace, Work theme, Dates Details report, the "Effort Values" display option available in the toolbar was not useful. This issue has been fixed; the “Effort Values” display option has been removed.

#MIL-3802

In the Project Dashboards workspace, when the user was hovering the mouse on the “Download” button, the text displayed in the tooltip was incorrect. This issue has been fixed.

#MIL-3428

In the Project Dashboards workspace, Controlling theme, Baseline Comparison report, the tooltips related to the “Start” and “Finish” columns’ indicators were incorrect. This issue has been fixed.

Budget/Finance

#MIL-4071

In the Finance workspace, the "Transactions outside Task boundaries" alert was displayed when the transaction’s date was the same as the Project’s/Task’s start or finish date. This issue has been fixed.

#MIL-3785

In the Work workspace, Gantt tab, Scheduler view mode, Gantt Task panel, Transaction & Cost Items sub-tab, when the user was creating a new transaction, it was not possible to cancel the creation process as the “Cancel” button was missing in the “Transaction” pop-up. This issue has been fixed.

Project Team

#MIL-4019

In the Administration workspace, Team tab, Project Team sub-tab, when the user was filtering the view by Organization, Job Classification or Skills, all team members from the selected branch’s children were displayed in the filtered view. This issue has been fixed.

Resource Dashboards

#MIL-3981

In the Resource Dashboards workspace, Workload theme, Resource Utilization report, the "Display Resources" filter was not working as expected. This issue has been fixed.

Dependencies

#MIL-3612

In the Work workspace, Gantt tab, Scheduler view mode, Gantt Task panel, Dependencies sub-tab, users without permissions to the linked project could open the Project Brief. This issue has been fixed.

Note: This restriction has been extended to the Home Page workspace, Connections and Dependencies tabs.

Agile

#MIL-3179

In the Work workspace, Agile tab, Full Backlog full screen view, Backlog Item dialog box, when the user was deleting a Backlog Item connected to another one, the connection was not deleted. This was resulting in the source item having blank connections. This issue has been fixed.

Portfolio Ranking

#MIL-1979

In the Portfolio Ranking workspace, Budget view mode, the "Available" budget could erroneously display a negative value for the monthly period following the last monthly period for which a Portfolio Budget was defined. This issue has been fixed.

Project Portal

#MIL-4199

In the Project Portal workspace, the Work Items and Status Reports tabs were displayed even when the corresponding Projects settings were deactivated. This issue has been fixed.

System Requirements

There are frequent changes and additions to the set of specific versions of operating systems, application servers and database servers for which ProjectAdvantage has been tested and certified. Please contact our teams for the latest information in this area.

Servers

  • Application Server: Apache Tomcat 8.5 with Oracle Java 8 or OpenJDK
  • Data Server: PostgreSQL 10 to 12

HTML5 Clients

  • Display resolution: 1366 x 768 (technical minimum), 1600 x 1050 (minimum recommended), 1920 x 1080 or higher (generally recommended).
  • Minimum of 4GB RAM allocated (8GB recommended).
  • Browser
    • Microsoft Edge
    • Microsoft Internet Explorer 10 or 11
    • Google Chrome
    • Mozilla Firefox
    • Apple Safari

ProjectAdvantage Designer

  • Display resolution: 1366 x 768
  • Minimum of 4GB RAM allocated
  • Disk space: 200MB minimum available for ProjectAdvantage.
  • Oracle Java 8 or OpenJDK 8
  • Operating Systems:
    • Windows 7, 8.1, 10 or 11
    • Mac OS X Lion or newer
    • Alpine Linux 3.16.1

Timesheets Mobile Application

  • Being hosted by ProjectAdvantage
  • Product version: 2022.08 and upper versions

Vantage platform

For customers who subscribed only to Plan

  • Installation:
    • POD 11 is required if hosted by ProjectAdvantage
    • An Hydra server is required if on premise
  • Product version: 2023.01 and upper versions

For customers who subscribed to Plan and Deliver

  • Installation:
    • POD 11 is required if hosted by ProjectAdvantage
    • An Hydra server is required if on premise
  • HPV2 activated on Deliver modules (activated by default for all new Deliver Clients after 2021 Q3)
  • Product version: 2023.01 and upper versions
  • Users will need to allow third-party cookies in their browser

Limitations

The data connector does not work in load balanced environments.