2021.11

This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2021.11 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2021.11 is a maintenance release of ProjectAdvantage 2021.

In the Core product, 2 enhancements have been implemented and 13 issues have been fixed.

In the ProjectAdvantage Default Configuration, 21 enhancements have been provided and 68 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.

Core Product Enhancements

REST API

#SCI-122

The ProjectAdvantage RESTAPI now has the capability to retrieve and update resource calendar work ranges. Please consult the RESTAPI documentation for more details.

#SCI-346

The ProjectAdvantage RESTAPI now has the capability to retrieve and update Currency Formats. Please consult the RESTAPI documentation for more details.

Core Product Corrected Issues

Data Visualization

#SCI-604

Displaying a grid with a gear button column (that displayed a menu) was slower than expected and became slower and slower as the list of commands available in the menu became longer and longer. This issue has been fixed.

#SCI-602

When displaying the formula “ if (no,[1.00d,2.00d],[]) + if (yes,[1.00d,2.00d],[])” in the organization grid it returned "N/A". This issue has been fixed. From now on, the formula returns the expected values.

#SCI-548

If the server had the system property "projectadvantage.disableBatchProcessing" set to true then exposed task fields were not properly updated when the project was saved. It is unlikely that this impacted very many customers (if any) because that is not a system property that is normally used. This issue has been fixed.

Authentication

#SCI-546

The SearchIndex table contained Help Manager records that were much bigger than they should have been after updating to a new ProjectAdvantage collection. Additionally, in a load-balanced environment, it was possible for those same records to become very, very large. Also, the Help Manager view in the designer did not follow the normal behavior where values were locked upon entering "Edit mode" and only saved when the user invoked the Save action or when the user confirmed a save when exiting "Edit mode". This issue has been fixed.

Build

#SCI-580

A concurrency deadlock caused create/update tables to run indefinitely. This issue has been fixed.

Commands

#SCI-552

Adding an assignment when in a Timesheet workspace was not only causing the newly created row to show up in the current time span (which is expected), but the newly created row was also showing up in the next time span (which is incorrect). This has been fixed.

Object/Field Edits

#SCI-569

When running an Update command in a specific project, the result ended in a bad data format error. This was a regression of #EV- 44050 ticket. This issue has been fixed.

#SCI-543

The resource manager timesheet commands "Review" and "Rework" caused an event to be triggered for each timesheet row even if the command didn't change the status for that row. This issue has been fixed.

#SCI-442

The Cost Item Assignment.Actual Units field was editable less often than it should have been when the project's labor actuals could only come from a Timesheet (this is controlled by the project field called "Actuals from Tracking Source Only"). The Cost Item Assignment.Actual Units field should be editable if the Assignment Option called "Automatically accrue labor assignment actuals" is turned off. If that option is on, then the field should be editable if the time span being edited is fully less than the task's completed date. If the cell being edited is not a time-distributed cell, then the field should be editable if a lump sum entry is spread over the completed portion of the assignment as opposed to causing the % complete to be recalculated (these lump sum entry options are also Assignment Options). This issue has been fixed.

#SCI-68

When clicking on the calendar task field dropdown, blank option wasn't provided. This issue has been fixed.

Scheduled Jobs

#SCI-440

Manually running a Scheduled Job (using the "Run Scheduled Job" button in the "Scheduled Jobs" view of the designer) often caused other jobs to never run again (typically the "Next Execute" column would eventually display "ASAP", but the job would never be run). This issue has been fixed.

Note: the workaround for the issue was the following:
  1. turn off the check-box in the "Schedule" column for the "stuck" jobs,
  2. Then save,
  3. Finally, then turn on the check-box in the "Schedule" column and save again.

REST API

#SCI-587

In some circumstances, it was possible to receive 500 responses to a REST API project request filtered by 'version'. This issue has been fixed.

#SCI-542

A problem serializing UserDefinedCategoryId after a RESTAPI POST command to create a user defined category record was occurring. This issue has been fixed.

Default Configuration Enhancements

External Resources

ProjectAdvantage Default Configuration now provides the necessary tools to identify External Resources.

External Resource refers to any external individual (contractors, consultants, freelance workers, etc.) carrying out services and activities participating in the project’s completion.

The External Resources feature includes the following:

  • Contract Type field available in the resource definition, which can be set to “Internal” or “External”.
  • Contractors feature, which allows the user to associate the resource to a specific contractor (previously defined in the System Data workspace).

As soon as the feature is included, multiple views are impacted with the following enhancements:

  • External Resource indicator – Users can identify External Resources at a glance thanks to the dedicated icon: 1-80_img_0.png
  • Contract Type Filter – Users can now use the dedicated filter to only display resources whose Contract Type is either “Internal” or “External”.
  • Contract Type Group By option – The new “Contract Type” option has been added to the Group By (1-80_img_1.png) feature when relevant.

Multiple views such as the Capacity Planning and Portfolio Simulation workspaces, or the Status Report also provide a set of new charts and data to efficiently review the external effort and cost.

Note: The relevant set of settings has been implemented as well for Administrators to fine-tune the use of External Resources across the solution.

Tickets that have been resolved with the External Resources initiative

Jira TicketDescription
MIL‑2267Identify External / Internal Resources
MIL-985Workload grouped by Internal & External Resources

Administration

#MIL-2915

In the System Settings workspace, Resource Settings folder, Allocations & Commitments tab, Allocations Options section, the new “Allocations Honor Resource Calendar” setting is available for the Administrator to choose whether the Allocated Effort and FTE Allocated Effort are calendar-sensitive or not.

#MW-2722

In the System Settings workspace, Project Settings folder, Display Preferences tab, Idea Center section, the new “Enable User Roles for Idea Creation” and “Enable User Roles for Idea Deletion” settings have been added to allow the Administrator to define which User Roles can create or delete an Idea in the Idea Center workspace.

General

#MIL-2763

The display of the RAG indicators in exported files has been updated to make the indicators more visible while remaining consistent with the colors found in the HTML Client.

#MIL-2761

In the Report Launcher views, the Reset Filters button has been added in the upper right corner of the reports list when relevant, allowing the user to reset all the filtering options.

Note: The button is only available when some filters are active. Otherwise, nothing will be displayed.

Portfolio

#MIL-1762

In the Portfolio Dashboards workspace, Project Monitoring theme, Status Overview report, the new “Last Status Report Date” Sort By (1-80_img_2.png) option has been added.

This option has also been added to the following Status Overview reports available in the:

  • Dashboards workspace, Consolidation Dashboards section
  • Dashboards workspace, when in multi-Project selection

Projects

#MIL-2929

In the Home Page workspace, Connections tab, when clicking on the Focus button of a connected project, from now on, the user will access the Working version of the project (rather than the Published one).

#MIL-2870

In the Work workspace, Tracking tab, when there was a lot of data to display, the view could take a lot of time to load. Therefore, the structure of the main content has been redesigned and we removed the Resource icons to increase the loading speed.

#MIL-2779

In the Project Creation process, Team step, the design of the Project Team has been aligned with the Administration workspace, Team tab, Project Team sub-tab.

#MIL-2776

In the Assignments Scheduling full screen view, Task-Driven tab, the Task Assignments section has been reworked to provide better access to the commands. Upon clicking on the new More (1-80_img_3.png) button, the user can now access the following commands: Edit Task, Edit Assignment, Fulfill Assignment (when relevant), Replace Resource (when relevant), and Delete Assignment.

In addition, the Details button has been removed. The user can now access the Assignment Details full screen view by directly clicking on the Resource Name.

#MIL-2764

In the Assign Resources dialog box, New Assignments section, the Remove (1-80_img_4.png) command has been added to make the feature more accessible.

Note: The enhancement is available for the Replace Resource and the Fulfill Soft Assignment dialog boxes as well.

#MIL-2610

In the Project Brief dialog box, Resources folder, the design of the Project Team has been aligned with the Administration workspace, Team tab, Project Team sub-tab.

#MIL-2417

For Status Reports submitted at the Work Package level, the new “Work Package - Status Report - Custom_Overwritable” overwritable command list has been added to facilitate the customization of captured data.

Note: For Gate Status Reports, the Project command list is taken into account.

#MIL-2310

In the Status Reports views, the “Print Selected Sections” command has been added under the Status Report More (1-80_img_5.png) button when necessary, allowing the user to print only some selected sections of a given report without going through the “Print All” process.

#MIL-2156

In the Project Brief dialog box, Work Items folder, from now on, when the “Enable Work Items Home Page Charts” setting is activated, the same charts as the Work Items Home Page will be displayed.

Note: The aforementioned setting is available in the System Settings workspace, Work Management Settings folder, Global Options tab.

#MIL-1966

In the Resources workspace, Resources tab, sub-totals have been added to the summary row when data is grouped by Organization, Job Classification, or Contract Type.

#MIL-1008

In the printable version of the Status Reports, Macro-Planning section, the Task Outlook and Task Status charts are now available.

Note: The display of the charts is conditioned by the Status Report Preferences “Hide Charts” option.

Resource

#MIL-2869

In the Resouce Validation workspace, Calendars tab, when there was a lot of data to display, the view could take a lot of time to load. Therefore, the structure of the main content has been redesigned and the Resource icons removed to increase the loading speed.

#MIL-2868

In the Resouce Validation workspace, Timesheets tab, when there was a lot of data to display, the view could take a lot of time to load. Therefore, the structure of the main content has been redesigned and the Resource icons removed to increase the loading speed.

#MIL-2731

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, the view has been reworked for the user to benefit from the Show/Hide feature, as well as the following Display Options (1-80_img_6.png):

  • Show Hidden
  • Show Parent
  • Hide Planned Values
  • Hide Zero Effort Assignments

Default Configuration Corrected Issues

Administration

#MIL-2985

In the System Settings workspace, some settings were wrongly displayed twice. This issue has been fixed.

#MIL-2934

In the Corporate Dashboards workspace, Session Statistics tab, when there was a lot of data to display, the view could take a lot of time to load. This issue has been fixed.

#MIL-2766

In the System Data workspace, Custom Reports tab, Custom Reports sub-tab, when associating a built-in theme to a Custom Report, the Custom Report was not available in other languages. This issue has been fixed.

Important: In an environment using multiple languages, the built-in theme may have to be revalidated in order to apply the fix correctly.

Execution

#MIL-2922

In the Timesheet workspace, after partially submitting a Timesheet, new entries to complete the period could not be submitted. This issue has been fixed.

Projects

#MIL-2996

In the Work workspace, Gantt tab, Assignments Scheduling full screen view, Task-Driven Review tab, Task Assignments section, after accessing the Assignment Details full screen for a resource (upon clicking on the resource's name), an empty state was displayed when the user attempted to select another resource from the left panel list. This issue has been fixed.

#MIL-2990

In the Assignments Scheduling full screen view, Assignment-Driven Review tab, some “REVIEW” and “REMOVE” buttons were not localized when logged in French. This issue has been fixed.

#MIL-2980

In the Work workspace, Gantt tab, Scheduler view mode, when accessing the Assign Resources dialog box from the Gantt toolbar “Assign” (1-80_img_7.png) button, it was not possible to delete a new assignment. This issue has been fixed.

#MIL-2979

In the Work workspace, Gantt tab, Scheduler view mode, when accessing the Assign Resources dialog box from the Gantt toolbar “Assign” (1-80_img_8.png) button, assigning multiple resources always displayed the last selected resource multiple times. This issue has been fixed.

#MIL-2965

In the Dashboards workspace, Consolidation Dashboards, Finance theme, Overview report, the “Total Cost” row was available without displaying any other data. This issue has been fixed.

Note: This issue only happened when the “Enable Mixed Budget Type” setting was activated. This setting is located in the System Settings workspace, Budget/Finance Settings folder.

#MIL-2952

In the Administration workspace, Team tab, the “Add my Team” button was displaying an unwanted scrollbar in French. This issue has been fixed.

#MIL-2948

In the Work workspace, Billing tab, Grid view mode, accessing the Task Details dialog box resulted in a dialog box with two “Close” buttons. This issue has been fixed.

#MIL-2946

In the Finance workspace, Budget dialog box, using the “Update from Total Cost” (1-80_img_9.png) button resulted in multiple budget lines with the same Cost Center if two or more cost centers had the exact same name. This issue has been fixed.

#MIL-2918

Multiple project views were referring to the "Usable Effort" even if no Resource Acquisition feature was used for the corresponding project. This issue has been fixed; from now on, the Available Effort label will be displayed.

#MIL-2916

In the Work workspace, Tracking tab, the Rework button did not work as expected if the “Enable Comments on Rework State” setting was deactivated. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Time Tracking Options tab.

#MIL-2865

In the Health Score Details popup, Cost Score section, the Savings score and definition were not available if the Savings value was lower than zero. This issue has been fixed.

#MIL-2855

In the Resources workspace, Resources, Tasks, and Cost Items tabs, when creating, replacing, or fulfilling an assignment, the time distribution options were not identical to the ones set before performing the action. This issue has been fixed.

Note: This issue also occurred when reviewing the assignment details in the Resources tab, Grid View mode.

#MIL-2853

In the Work workspace, Tracking tab, when applying actuals, an error occurred if Reviewed or Approved Timesheets came from an auto-assignment. This issue has been fixed.

#MIL-2844

In the Assignments Scheduling full screen view, Assignment-Driven Review tab, the “Review” and “Remove” commands were not translated for soft assignments. This issue has been fixed.

#MIL-2818

When using the Project “Save As” command or when creating a project from an existing project, different Generic Resources assignments with the exact same attributes were not assigned as they were in the source project. This issue has been fixed.

#MIL-2812

In the Resources workspace, Tasks tab, and in the Assignment Details full screen view, Soft Assignments tab, the “Convert to Request” option for Soft Assignments was still available when the corresponding settings were deactivated. This issue has been fixed.

Note: The aforementioned settings are the following: "Activate Resource Allocations" (System Settings workspace, General Settings folder, Meta Settings tab), "Enable Convert Assignment Into Request" (System Settings workspace, Resource Settings folder, Allocations & Commitments tab) and the "Allocations" setup option (Administration workspace, Setup tab).

#MIL-2809

In the Resources workspace, Resources tab, when there was a lot of data to display, the view could take some time to load. This issue has been fixed.

#MIL-2806

In the Assign Cost Items dialog box, Filters popup, the Organization filter did not work properly. In addition, the “Enable Filters” button was not highlighted when a filter was activated. This issue has been fixed.

#MIL-2792

In the Home Page workspace, Status Reports tab, the “Decisions” and “Meeting Attendees” fields were not reset when creating a new Status Report from blank. This issue has been fixed.

#MIL-2781

In the Home Page workspace, Status Reports tab, the Cost fields values were not accurate when the project included Distributed Transactions. This issue has been fixed.

#MIL-2780

In the Work workspace, Tracking tab, when the “Timesheet Lock Date” setting was filled in, the Rework button was still displayed when not relevant. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Time Tracking Options tab, Timesheet Options section.

#MIL-2778

In the Work workspace, Phases & Gates tab, Phases/Gates view mode, the content was displayed twice when the Administrator deactivated the “Activate Status Reports” meta setting. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, General Settings folder, Meta Settings tab.

#MIL-2773

In the Resources workspace, Resources tab, Grid view, the Generic Resource names were not displayed. This issue has been fixed.

#MIL-2771

In the Resources workspace, Resources tab, Grid view, the Search (1-80_img_10.png) option did not work. This issue has been fixed.

#MIL-2739

In the Dashboards workspace, after launching a Custom Report, the report was also generated if switching to a project whose Nature was not listed in the Custom Report definition “Natures” field. This issue has been fixed.

#MIL-2736

In the Work workspace, Phases & Gates tab, Gate Status Reports full screen view, when closing the full screen view while a Gate Status Report was under creation, the Status Report was discarded without warning. This issue has been fixed.

#MIL-2724

In the Work workspace, Gantt tab, Scheduler view mode, Task side panel, Assignments tab, when the “Enable Assignment Card Custom Section” setting was activated, the Custom section was only displayed when the user was logged in English. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Work section, Gantt Right Panel sub-section.

#MIL-2714

In the Work workspace, Gantt tab, the “has successor different of FS” CCPM Planning problem was wrongly triggered in Spanish. This issue has been fixed.

#MIL-2711

In the Finance workspace, Cost Transactions dialog box, when the “Transaction Mode” setting was set to “Both”, the Transaction Amount could not be edited. This issue has been fixed.

Note: The aforementioned setting is available in the System Settings workspace, Project Settings folder, Display Preferences tab, Project Finance section.

#MIL-2699

In the Work workspace, Phases & Gates tab, when a Gate was planned and had no baseline, the OTD Status was “The Gate is planned and on time”. This issue has been fixed.

Important: The new conditions for planned and approved gates with no baseline will not apply on previously submitted Status Reports.

#MIL-2670

In the Gate Status Reports full screen view, Gates list, the Gate flowchart was sometimes not aligned with the Gate cards. This issue has been fixed.

#MIL-2669

In the Phases & Gates flowchart and anywhere the Phase or Gate icons are represented (e.g., Gate Status Reports full screen view), there was no dedicated icon to depict a Gate or a Phase with no OTD Status (due to the lack of Baseline). This issue has been fixed.

#MIL-2581

In the Finance workspace, Forecast dialog box, when the pivot was set to “Cost Center”, it was possible to create multiple lines with the same Cost Centers. This issue has been fixed.

#MIL-2477

In the Manage Baselines dialog box, Baseline Details popup, the colored indicators legend was missing. This issue has been fixed.

#MIL-2445

In the Work workspace, Gantt tab, Scheduler view mode, when using the “Fulfill Generic Resource” command (available when clicking on the Gantt toolbar “Assign” (1-80_img_11.png) button), the selector popup for Generic Resources was empty, even if the selected task had a Generic Resource assignment. This issue has been fixed.

#MIL-2443

When approving Business Cases, locked Business Cases were not deactivated. This issue has been fixed.

Note: Business Cases can be automatically deactivated if the “Enable Deactivate Business Case upon Final State” setting is activated (System Settings workspace, Project Settings folder, Workflow Options tab).

#MIL-2416

In the Home Page workspace, Critical Alerts panel, the Finance section displaying the “Overdue Transactions” alert was not triggered correctly. This issue has been fixed.

#MIL-2404

In the Administration workspace, Monitoring tab, after clicking on the buttons in the toolbar from the different sub-tabs, the views were not refreshed. This issue has been fixed.

#MIL-2292

In the Work workspace, Tracking tab, the “Apply Revised Remaining” option did not work as expected. This issue has been fixed.

Portfolio

#MIL-2998

In the Portfolio Center workspace, Budget tab, Project Budget view mode, the “Show Inactive” (1-80_img_12.png) display option behavior was inverted. This issue has been fixed.

#MIL-2976

In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, when updating Cost Centers from Projects, in some specific cases, some values could be wrong. This issue has been fixed.

#MIL-2850

In the Portfolio Center workspace, Budget tab, Portfolio Budget view mode, the Nature rows total values at the Natures row did not include all the Transactions. This issue has been fixed.

#MIL-2626

In the Portfolio Dashboards workspace, some of the reports header did not display aliases. This issue has been fixed.

#MIL-2430

In the Portfolio Center workspace, Health Score tab, the health score was not updated if the project was automatically published upon submitting the corresponding Status Report. This issue has been fixed.

Resource

#MIL-2992

In the Resource Dashboards workspace, Time Tracking theme, Overview report, the % Entered was not accurate when the “Show Non-Project” option was activated. This issue has been fixed.

#MIL-2959

In the Resource Dashboards workspace, when activating a filter for one report, some of the filter icons for other reports were also displayed while they shouldn’t have. This issue has been fixed.

#MIL-2826

In the Resource Dashboards workspace, Time Tracking theme, Timesheets and Project Actuals reports, the time distribution zoom options were missing. This issue has been fixed.

#MIL-2824

In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, Requests Inbox sub-tab, the Reset button was not properly highlighted when the Projects and Display Requests filters were filled in. This issue has been fixed.

#MIL-2801

In the Resource Dashboards workspace, Workload theme, Resource Utilization report, Charts section, the translation in French for “Available Effort” and “Forecast Effort” was wrong. This issue has been fixed, it has been changed in French to “Capacité disponible” and “Capacité prévisionnelle”.

#MIL-2620

In the Resource Validation workspace, Planned resources were not displayed. This issue has been fixed.

#MIL-2519

In the Resource Validation workspace, when reviewing the Timesheet, the confirmation popup mentioned the “Timesheet Submit Period” picklist was displayed, while it should have read “Timesheet Review Period”. This issue has been fixed.

Note: We took this opportunity to rework the French translation of the popup.

Strategy

#MIL-3000

In the Objectives workspace, Ideas sub-tab, there was a space issue in the Idea cards when logged in German. This issue has been fixed.

#MIL-2515

In the Objectives workspace, Track Values dialog box, Change Log popup, the charts showed no value instead of the last captured values if no changelog was saved during a period. This issue has been fixed.

#MIL-2406

In the Objectives workspace, Projects sub-tab, Cost values were not saved properly into the Change Logs when a modification was done. This issue has been fixed.

Note: The Change Logs capture has been enhanced, the capture is now also implemented on the "Change Log" button for the Objective popup definition and on the "More" button for Tracking Values at the Project and Portfolio levels.

Work Management

#MIL-2968

In the Work Items workspace, Deliverables created from a task were not listed when the “Assigned To Me” display option was selected. This issue has been fixed.

#MIL-2925

In the Work Item dialog boxes, Other Attributes section, it was not possible to add a new user directly in the Other Assignees field once the field was not empty. This issue has been fixed; from now on, the Edit (1-80_img_13.png) button will be available for the user to prompt the selection.

#MIL-2790

When creating a new project from a Template, Actions were no longer related to their corresponding tasks. This issue has been fixed.

#MIL-2775

In the Work Item dialog boxes, when selecting an Assignee, if two or more users had the exact same name, the prompted User list only listed the name once. This issue has been fixed.

#MIL-2702

In the Client Portal workspace, Work Items created by the logged-in user were not displayed. This issue has been fixed.

#MIL-2639

In the Portfolio Work Management workspace, Project Monitoring tab, the “Project Status” filter did not work as expected. This issue has been fixed.

#MIL-2564

In the Work Items workspace, the Work Items list was not restricted by the “Set Max. Number of Advanced Cards” setting. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, General Settings folder, General Options tab.

#MIL-2563

In the Home Page workspace, Home tab, Work Items section, Details dialog box, the list of Work Items in the Last Period and Next Period sections were not restricted by the “Set Max. Number of Advanced Cards” setting. This issue has been fixed, as well as for Risks too.

Note: The aforementioned setting is located in the System Settings workspace, General Settings folder, General Options tab.

#MIL-2412

In the Work Items workspace, the Time Period pivot filter did not work. This issue has been fixed.

#MIL-2399

In the Portfolio Work Management workspace, Work Items tab, when accessing the Work Items full screen view by clicking on a bar of the charts, the Grid tab was not properly filtered. This issue has been fixed.