This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2021.09 both in the Core product and in the ProjectAdvantage Default Configuration.

ProjectAdvantage 2021.09 is a maintenance release of ProjectAdvantage 2021.

In the Core product, 5 enhancements have been implemented and 21 issues have been fixed.

In the ProjectAdvantage Default Configuration, 5 enhancements have been provided and 72 issues have been fixed.

In order to access the different sections, please click on the following links:

Important Reminders for upgrade

  • Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature, there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
  • To improve the performance of views displaying the Health Score of multiple projects, we are now using a Health Score that is pre-calculated upon publishing a project as opposed to on the fly. Therefore, upon upgrading to 2021.03 (or higher), please make sure you run once the following Scheduled Job to initialize the project Health Score values: Initialize Project Static Health Score.
Important: For systems with an overwritten Publish command, please make sure to add the new dedicated Command List for the Health Score pre-calculation upon publishing a project: “Project - Publish Project - Continue - Capture Health Score”.

Core Product Enhancements

Commands

#SCI-380

There is now an "Auto generate ID" row in the Parameters dialog box for the Save As command. When the value for this row is checked, the ID of the newly saved project will be auto-generated during the "Save As" operation. This auto-generated ID is just like the ID that is generated when a new project is created. When the "Auto generate ID" row is checked the value for the ID row will be ignored, but the value of the "Auto generate ID" row will be ignored if the "Show built-in dialog" value is checked.

Security

#SCI-212

To improve the security of the product, we removed the direct access to the PSClient.jar (necessary for the API). To access this file, the users who have access to the designer will now have a new “Download Client Jar” button, in the HTML client in the Settings section.

1-78_img_0.png

The launch of the designer has also been reworked to support this new change.

REST API

#SCI-302

Cost Items Assignment REST API endpoints are now supported.

#SCI-123

Labor Assignment REST API endpoints are now supported.

#SCI-121

The fields with ‘List’ kind can now retrieve and update data from the REST API.

Core Product Corrected Issues

Authentication

#SCI-281

In some cases, SSO logins could fail by switching back to the login page. Attempting to log in again caused other errors that hide the original error. The issue has been fixed.

Commands

#SCI-351

Users sometimes encountered a "Server-side command list execution failed at command... Failed to set specified data" error if multiple users all tried to create a project from a template at the same time. This particular error was accompanied by a ConcurrentModificationException in the server log. This issue has been fixed.

#SCI-182

The "Summarize At Level" command randomly failed to collapse (or uncollapse) any rows. This issue has been fixed.

Data Snapshots

#SCI-434

Static reports with empty tags showed up in an empty folder. This has been fixed. From now on, reports with empty tags will all be displayed under a <no tag> default folder.

#SCI-429

The files listed in the Data Snapshots workspace (when drilled down to the deepest level and in "TAG" mode) were not properly sorted by descending date order. Also, when sorting folders by name, the case (upper/lower) of the name was not properly ignored. These problems have been fixed.

#SCI-415

The "dated" folders in the Data Snapshots workspace were not sorted by date. Instead, they were sorted alphabetically. Of course, "dated" folders only show up when the display option is set to "TIME" (as opposed to "TAG"). This issue has been fixed.

#SCI-409

The Data Snapshots workspace was extremely slow if the database contained a large number of canned report files. This issue has been fixed.

#SCI-207

The CSV and Excel export were using basename instead of aliases for formulas and UDF (User Defined Field). The method to get aliases for those kinds of fields had never been implemented.

This issue has been fixed.

Data Visualization

#SCI-61

Tooltips were not working in tree cells (e.g. Name column in hierarchical grid). This issue has been fixed.

Designer

#SCI-376

The quarter labeling in the Time Axis was off by one quarter when the browser was run in some time zones (e.g. CET). This issue has been fixed.

Domain Config

#SCI-426

When a formula became corrupted in a particular way (e.g. such that it caused a StackOverflowException), the database could not be upgraded to a newer version. This issue has been fixed.

Import/Export CFG

#SCI-225

In the Collections view of the Designer, a user encountered a "java.lang.ClassCastException: java.lang.String cannot be cast to com.sciforma.psnext.setup.SolutionBundle" error when they created a collection patch if there were any unattached patches. This issue has been fixed.

Localization

#SCI-300

Quarters were not localized for French and Spanish. This issue has been fixed.

Object/Field Edits

#SCI-227

If some records in a user-defined category had invalid Unique IDs (Unique IDs that didn’t follow certain internal business rules) then a field (whose Type was said user-defined category) could not be successfully set by using the Selector that was available after that field's hamburger button was clicked. This issue has been fixed by renumbering the unique IDs in a couple of tables and by preventing this problem from happening again.

#SCI-100

If an organization is removed during a reorganization, that organization will now be removed from any list of performing organizations when the associated projects are validated.

#SCI-93

An invalid value for a field's "Value List" was causing problems in that field's Selector (accessible by using the hamburger button associated with that field). This issue has been fixed by ensuring that invalid Value List values are removed from the system.

REST API

#SCI-402

When making a REST API request to add a timesheet assignment, field data in the post request was not set on the new assignment, but was only created. This issue has been fixed.

#SCI-394

In the REST API documentation, the resource_id was not marked as required, but in fact it actually was required. This issue has been fixed.

In the REST API, when a request was made, the parameters were not being evaluated to make sure they correctly matched the defined schema. This issue has been fixed.

#SCI-316

In some cases, when creating a UDC (User Defined Category) record for some data view definitions an error code of 400 is returned. This has been fixed.

#SCI-113

Using a Java REST API Client to retrieve UDC (User Defined Category) fields caused an error. This issue has been fixed.

Security

#SCI-219

Database and environment information were being returned in the response to a Session Service request which should not have been the case. From now on, this information is no longer returned with the response.

Default Configuration Enhancements

Resource Allocations

The Resource Allocations feature has been revisited to improve the user experience of both Project and Resource Managers.

The Resource Allocations workspace and the Resources workspace, Project Allocations tab have been redesigned as follows:

  • Improved navigation with the introduction of the full screen views,
  • New set of alerts and filters to quickly find elements that require attention,
  • Workflow-driven Request process,
  • New set of reports in the Dashboards full screen view for Project Managers,
  • Redesign of the Assign, Replace, and Fulfill Resources dialog boxes (making it easier for the user to identify the time-distributed remaining usability of resources to assign).
Important: The Allocated Effort now takes into account the Resource Calendar. As a consequence, existing data upon upgrading to 2021.09 can be impacted for any system using the Resource Allocation feature.

Projects

#MIL-2577

In the Dashboards workspace, the new Analytics theme is now available in both single and multi-project selection. It provides the following reports (based on the new Smart Grid component):

  • Actions (if Work Management has been activated and at least one of the selected projects has been set up to manage Actions)
  • Change Requests (if Work Management has been activated and at least one of the selected projects has been set up to manage Change Requests)
  • Deliverables (if Work Management has been activated and at least one of the selected projects has been set up to manage Deliverables)
  • Issues (if Work Management has been activated and at least one of the selected projects has been set up to manage Issues)
  • Risks (if Project Risks have been enabled and at least one of the selected projects has been set up to manage Risks)
  • Backlog Items (if Agile has been activated and at least one of the selected projects has been set up to use Agile)
Note: This new theme is conditioned by the dedicated “Enable Project Analytics Theme” setting, available in the System Settings workspace, Project Settings folder, Dashboards tab.

#MIL-2345

In the Work workspace, Gantt tab, Scheduler view mode, Task side panel, Links tab, two new options have been added to the Filter Chain drop-down: Direct Predecessors and Direct Successors.

Note: The Gantt Filters dialog box "Chain Display Options" field has been updated as well.

#MIL-2191

In the Work workspace, Tracking tab, the formulas have been reworked to integrate the new “% Applied” built-in field. This will fix some issues with the % Applied displayed in the Tracking tab.

#MIL-2028

In the Work and Resources workspaces, the new Assignments Scheduling full screen view is now available upon clicking on the dedicated button (1-78_img_1.png) available in the main toolbar.

This view provides both the Gantt and the resources spreadsheet in one single view to facilitate the review of the impacts of the assignments on the schedule (and vice versa).

Note: The Assignments Scheduling full screen view is conditioned by the “Enable Assignments Scheduling full screen view” setting available in the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab.

#MIL-1743

In the Task Details dialog box, Definition folder, the Predecessors and Successors sections now display the Start and Finish dates of the linked tasks.

Note: We took this opportunity to redesign the Task Details dialog box.

Default Configuration Corrected Issues

Administration

#MIL-2752

In the System Settings workspace, Project Settings folder, Global Options tab, the “Enabled User Roles for Save As Command” setting was not persistent between sessions. This issue has been fixed.

#MIL-2490

In the System Settings workspace, Project Settings folder, the “Enabled User Roles” and “Enabled Natures” options for the “Enable Phases & Gates” setting did not work as expected. This issue has been fixed.

#MIL-2455

In the System Settings workspace, Project Settings folder, Time Tracking Options tab, the “Enable Submit Confirmation popup” setting was only available when the “Enable Partial Timesheet Submissions” setting was deactivated. This issue has been fixed.

#MIL-2409

In the System Settings workspace, Project Settings folder, Display Preferences tab, the “Enable Project Brief Connections Folder” setting's “Enabled Natures” field displayed the list of User Roles instead of the expected project Natures. This issue has been fixed.

Portals

#MIL-2520

In the Idea Center workspace, Details view mode, Connections section, it was not possible to select multiple connected items at once. This issue has been fixed.

Portfolio

#MIL-2721

In the Portfolio Dashboards workspace, Finance theme, Cash Flow report, the Chart could not be hidden. This issue has been fixed.

#MIL-2667

In the Portfolio Dashboards workspace, Finance theme, Billing report, the amounts displayed on the status rows (Planned, Billed, Confirmed) were not correct. This issue has been fixed.

#MIL-2545

In the Portfolio Center workspace, Budget tab, the Project Total Cost did not take into account Transactions cost. This issue has been fixed.

#MIL-2482

In the Portfolio Center workspace, Project Supervision tab, the Status Report indicators filters did not work as expected. This issue has been fixed.

#MIL-2473

In the Finance workspace, Manage Snapshots dialog box, when the project was copied from an existing one, the Forecast values were not taken into account. This issue has been fixed.

#MIL-2440

In the Portfolio Dashboards workspace, Phases & Gates theme, Overview report, the Sort By (1-78_img_2.png) and Charts (1-78_img_3.png) display options were missing. This issue has been fixed.

Projects

#MIL-2745

In the Portfolio Dashboards workspace, when activating specific filters for custom reports, the activated filter icon size was smaller than the size of standard reports. This issue has been fixed.

#MIL-2734

When creating a project from a Template, if the selected project type of the new project included defined values for the Default Resource Assignment Cost Source, Discount Rate, or Forecast Labor Type fields, an error occurred when validating the project when the Import Setup option was activated. This issue has been fixed.

#MIL-2730

When creating a new project from an existing one, the Project ID increased significantly by about 10-characters. This issue has been fixed.

Note: The Project ID is now limited to 8 characters plus 4 random digits to ensure the unicity of the rest of the projects.

#MIL-2728

In the Home Page workspace, Dependencies tab, when opening the target or source project Focus full screen view, the “Dependency Target Task(s)” or “Dependency Source Task(s)” filter was not reset after closing the full screen view. This issue has been fixed.

#MIL-2712

In the Finance workspace, Cost Transactions dialog box, when the Sort By (1-78_img_4.png) display option was set to “Date”, the result was not consistent. This issue has been fixed.

#MIL-2704

In the Dashboards workspace, Consolidation Dashboards section, Project Monitoring theme, Performance report, when the Sort By (1-78_img_5.png) display option was set to “Earliest First” or “Latest First”, projects were not sorted properly. This issue has been fixed.

#MIL-2701

When creating a new project from an existing one, the Project ID increased significantly by about 10-characters each time a subsequent copy of a copy was made. This issue has been fixed.

#MIL-2691

In the Dashboards workspace, Finance theme, Overview report, the charts located in the lower part of the view did not take the selected Baseline into account. This issue has been fixed.

#MIL-2686

In the Finance workspace, Cost Transactions popup, the Sort By (1-78_img_6.png) display option did not work as expected when sorting the Transactions by date. This issue has been fixed.

#MIL-2684

When creating a project from another project, the “Import Baselines” option was not available. This issue has been fixed.

#MIL-2683

In a project, the Program Managers and Product Managers fields did not retrieve the corresponding users correctly so that they would inherit from project permissions as defined in a permission set. This issue has been fixed.

#MIL-2681

In the Resources workspace, Tasks tab, when clicking on the More (1-78_img_7.png) button at the assignment level and selecting the “Edit Assignment” option, the prompted Labor Assignment dialog box displayed two “Close” buttons. This issue has been fixed.

#MIL-2675

In the Resources workspace, an empty state was prompted in multi-project selection, even if the selected projects' Nature met the “Enabled Natures” settings set at the same time for all the following settings: “Enable Tasks”, “Enable Resources” and “Enable Cost Items”. This issue has been fixed.

Note: The aforementioned settings are located in the System Settings workspace, Project Settings folder, Display Preferences tab.

#MIL-2672

In the Work workspace, Tracking tab, Timesheet Details full screen view, Resources List panel, the Filters button and the Resources could be missing. This issue has been fixed.

#MIL-2647

In the Home Page workspace, Contracts tab, Deliverables section, it was not possible to select a Deliverable. This issue has been fixed.

#MIL-2643

In the Home Page workspace, Status Reports tab, Project panel, the Custom section title styling was not aligned with the other sections. This issue has been fixed.

#MIL-2638

In the Finance workspace, in some cases, the condition to display the correct view was not evaluated properly. This issue has been fixed.

#MIL-2618

In the Resources workspace, Resources tab, Assignment Details full screen view, Soft Assignments tab, after fulfilling a soft assignment, both hard and soft assignments could be displayed. This issue has been fixed.

#MIL-2617

In the Resources workspace, Resources tab, when activating Filters, and then using the Fulfill Assignment command (available upon clicking on the More (1-78_img_8.png) button on a Soft Assignment row), the Filters were deactivated once the fulfilling actions were performed. This issue has been fixed.

#MIL-2594

In the Dashboards workspace, Controlling theme, Baseline Comparison report, the comparison baseline field was missing. This issue has been fixed.

#MIL-2591

When creating a new project from a Template, the Assignments Options setup options were not set correctly when the “Import Setup” option was activated. This issue has been fixed.

#MIL-2571

In the Dashboards and Resource Dashboards workspaces, Filters popup for Custom Reports, the specific filters sections were not correctly mapped with the right overwritable form. This issue has been fixed.

#MIL-2548

In the Dashboards workspace, upon clicking on the “Launch” button for a given Custom Report, the resulting view did not honor the time distribution options set in the “Most frequently used options” panel. This issue has been fixed.

#MIL-2544

In the Work workspace, Tracking tab, when applying a Timesheet, in the popup prompting the user to choose whether or not to review the impacts, after checking the “Don't ask again for this session” option, and then reapplying the same Timesheet (by selecting “Apply Revised Remaining” for example), the user could no longer close the Impact Management full screen view. This issue has been fixed.

#MIL-2540

In the Dashboards workspace, "Most Frequently Used Options" panel, some Presets options were missing from the Time Navigation toolbar. This issue has been fixed.

#MIL-2538

In the Work workspace, Agile tab, Project Structure full screen view, Epics and Team tabs, most of the buttons from the toolbars were wrongly conditioned on the “Enabled User Roles” option of the “Enable Project Activate/Deactivate Commands” setting. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Project Settings folder, Global Options tab, Miscellaneous sub-tab.

#MIL-2528

In the Dashboards and Resource Dashboards workspaces, when a report was launched in a new tab, in some cases, attempting to print the report resulted in a blank page. This issue has been fixed.

#MIL-2526

In the Work workspace, Gantt tab, Scheduler view mode, when using the Remove Generic Resources command (available by clicking on the Gantt toolbar's Remove Resources (1-78_img_9.png) button), the prompted popup was empty, even if the selected tasks had generic resources assigned. This issue has been fixed.

#MIL-2525

In the Work workspace, Tracking tab, when applying Timesheets, the capture of data could take a long time. This issue has been fixed.

Note: The new “Enable Project Tracking Impact Management” setting (System Settings workspace, Project Settings folder, Time Tracking Options tab) has been created, as well as the corresponding “Enable Impact Management” setup option to manage whether or not the impact management should be used.

#MIL-2522

In the Assign Resources dialog box, the resource Remaining Usable Effort of new assignments could sometimes not reflect previous assignments done on the same project. This issue has been fixed.

#MIL-2498

In the Timesheet workspace, and in the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, the project names were truncated when too long. This issue has been fixed; from now on, tooltips are displayed with the full names.

#MIL-2478

In the Work workspace, Gantt tab, using the “Close Tasks” command (available by clicking on the Gantt toolbar's More (1-78_img_10.png) button) did not close all selected tasks properly. This issue has been fixed.

#MIL-2462

In the Work workspace, Phases & Gates tab, Phases/Gates view mode, Gate Status Reports full screen view, the Deliverables section was not included in the detailed Status Report if the “Enable Issues” setting was deactivated. This issue has been fixed.

Note: The aforementioned setting is located in the System Settings workspace, Work Management settings folder, Work Items tab.

#MIL-2459

In the Administration workspace, the Monitoring tab translation in French was wrongly changed to “Supervision”. This issue has been fixed, it has been changed back to “Supervision des jalons”.

#MIL-2452

In the Home Page workspace, Home tab, the Health Score calculation wasn't consistent with the Status Report indicators. This issue has been fixed.

#MIL-2444

In the Resources workspace, Resources tab, when multiple projects were selected, generic resources with the same attributes were grouped together. This issue has been fixed.

#MIL-2436

In the Administration workspace, Project Supervision tab (available in multi-project selection), in the Filters popup, the “Workflow States” field showed an empty list. This issue has been fixed.

#MIL-2429

In the Dashboards workspace, when a Custom Report featured a table with some frozen columns, a misalignment could occur at the bottom of the table. This issue has been fixed.

Important: To implement this fix, Designers need to apply the new “htmlGridTimeDistribLastRowFix” stylesheet to the General Object containing the report.

#MIL-2373

In the Home Page workspace, Status Reports tab, Last Submitted view, the Budget Cost value captured for the Status Report was not aligned with the project Budget Cost value. This issue has been fixed.

Note: To facilitate Overwrites, distributed fields captured for the Status Reports are now managed with Formulas.

#MIL-2336

When creating a new project, the Portfolio Folder field was not filtered when the “Portfolio Selector Condition_Overwritable” field was overwritten with a specific formula. This issue has been fixed.

#MIL-2158

In the Gantt view, the spreadsheet and chart rows could sometimes be misaligned. This issue has been fixed.

Resources

#MIL-2750

In the Resource Dashboards workspace, Time Tracking theme (after launching a report), selecting a Custom Report did not highlight the corresponding tab. This issue has been fixed.

#MIL-2692

In the Organization Center workspace, Resource Details tab, Resource Utilization sub-tab, the indicators were missing. This issue has been fixed.

#MIL-2596

In the Resource Validation workspace, Timesheets tab, while filtering the resources list using the Search (1-78_img_11.png) field, all resources grouped under the same Timesheet Status section were processed when the Submit, Rework, or Review buttons were used This issue has been fixed.

#MIL-2557

In the Resource Validation workspace, Timesheets tab, when a partial submit had been performed, it was no longer possible to Submit the Timesheet. This issue has been fixed.

#MIL-2531

In the Resource Validation workspace, Timesheets tab, the “Submit” button was not displayed when the Effort came from Non-Project tasks. This issue has been fixed

#MIL-2521

In the Resource Allocations workspace, Resource Allocations full screen view, Requests tab, fulfilling an allocation request added allocated effort to non-working days. This issue has been fixed.

#MIL-2499

In the Resource Validation workspace, Timesheets tab, Timesheet Details full screen view, the Total row was not frozen when a user was scrolling through the assignments list. This issue has been fixed.

#MIL-2155

In the Resource Allocations workspace, Resource Allocations full screen view, Hard Allocations tab, Resources Overview sub-tab, resources without any availability on a specific period were not shown as overallocated when creating allocations on the same period. This issue has been fixed.

Strategy

#MIL-2411

In the Objectives workspace, Projects sub-tab, the Health Score was not using the Static version. This issue has been fixed.

Work Management

#MIL-2705

In the Risks full-screen view, Grid tab, the Probability and Severity columns were not up to date. This issue has been fixed.

#MIL-2687

In the Issues full screen view, Grid tab, when the “Export Only” display option (1-78_img_12.png) was selected, some (or all) issues could be missing from the spreadsheet. This issue has been fixed.

#MIL-2666

When creating a project from a template, actions connected to deliverables were imported even if the “Import Actions” import option was set to “None”. This issue has been fixed.

#MIL-2665

In the Risk dialog box, when activating the “Show Initial” display option, the initial Probability, Severity, and Risk Level were not displayed if only one snapshot was captured. This issue has been fixed.

#MIL-2650

In the Task Details dialog box, Work Objects folder, Risk cards workflow chip displayed an obsolete design. This issue has been fixed.

#MIL-2632

In the Portfolio Work Management workspace, Risks tab, in multi-portfolio folder selection, the “High” Risk Level chip was no longer displayed. This issue has been fixed.

#MIL-2627

When creating a new Change Request, the Key number was not incremented correctly. This issue has been fixed.

#MIL-2474

In the Work Package Center workspace, Definition tab, Status Report History full screen view, Status Report Details view, Risks section, the “Probability” and “Severity” values were not correct. This issue has been fixed.

#MIL-2387

In the Work workspace, Risks tab, Risks could be erroneously deleted under certain conditions. This issue has been fixed.

#MIL-2204

In the Template Work Management workspace, Deliverables and Risks tab, Inbox view mode, the Actions section was not displayed when enabled. This issue has been fixed.