2020.12
This document describes the enhancements, corrected issues, and new features that have been implemented in ProjectAdvantage 2020.12 in the Core product.
ProjectAdvantage 2020.12 is a maintenance release of ProjectAdvantage 2020.
In the Core product, 5 enhancements have been implemented and 16 issues have been fixed.
In order to access the different sections, please click on the following links:
Important Reminders for upgrade
- Since 7.1q there is a new way of managing languages in ProjectAdvantage thanks to the Language Packs feature. As a result of this new feature there is a change in the classpath used to launch API programs: we no longer have PSClient_xx.jar files for our translated language strings and now have new Language Pack jar files. So all PSClient_xx.jar files will now need to be replaced by the appropriate Language Packs. Please read carefully #41025 included in the Release Notes for ProjectAdvantage S7.1q.
- Starting from 2020.11, the Default Configuration comes with a significantly redesigned set of workspaces for Project Managers and other similar roles manipulating Project data. These new workspaces require preparation and change management before making them available to the end-users. We strongly recommend that you check out the dedicated Change Management document before upgrading to 2020.11 (and later) of the Default Configuration.
Core Product Enhancements
Commands
#43601
The new UI less Critical Chain Save Baseline command can now be executed entirely server side when ticking the checkbox in the designer. The command can also be executed via a scheduled job.
In the HTML5 client, when executing the UI less command server side the dialog box asking for confirmation to overwrite has been removed.
Designer
#43598
When a user enters a blank value into a cell for a field for which there is a default formula defined, then the value for the cell will be reset back to the default value.
Gantt
#42912
New keyboard shortcut keys have been implemented for certain actions in the Gantt spreadsheet.
- Delete selected tasks: Ctrl + F9 (Cmd + F9 for Mac)
- Indent selected tasks: Ctrl + F3 (Cmd + F3 for Mac)
- Outdent selected tasks: Ctrl + Shift + F3 (Cmd + Shift + F3 for Mac)
- Insert tasks after current: Ctrl + F6 (Cmd + F6 for Mac)
- Insert tasks before current: Ctrl + Shift + F6 (Cmd + Shift + F6 for Mac)
- Chain Link selected tasks: Ctrl + Shift + F2 (Cmd + Shift + F2 for Mac)
The Indent, Outdent, Delete, and Insert commands will all behave the same as if they were initiated via the Gantt context menu. The Delete command will still issue a warning to the user. The Insert commands will animate the inserts, as well as change the number of tasks that are created based on the current number of selected tasks.
The Insert commands will also be disabled if more than 30 tasks are selected, same as the context menu. If the user attempts to create more than 30 tasks in this manner, a blue message box will be displayed explaining the issue.
Object Edits (Data Categories)
#43629
The Transaction Date dialog box for managing transactions dates in the HTML5 client has been modified. Indeed, when editing the Date Formula field in the Transaction pop-up, a message which was not meaningful to users was displayed. For that reason, the message will no longer be displayed.
#43597
The "Project.Portfolio Folder" field now allows a filter to be defined as a Value List, like a user created Portfolio Folder field.
Core Product Corrected Issues
Commands
#43602
If the "Show built-in dialog" option was not turned on for the "Critical Chain Save Baseline" command, the command did not work correctly and behaved more like the "Save Baseline" command. This has been fixed.
Designer
#43455
URL link data was showing variables instead of the actual link itself. This was due to the variable not being replaced because the wrong method was used in the code when sending emails. This issue has been fixed using the appropriate method that handles link data substitution.
#43442
When a text block contained nested "group by" loops where the outer loop was grouping by dated values, a failure could occur if the dated values didn't fall within the active time distribution range (something typically defined by another even higher loop). This happened rarely because most dated fields span from 1/1/1970 to 12/31/2099. However, if the dated values came from the Resource.Organization History field or came from a formula using the
"DatedConstant" function, it was possible that the time distribution range and the dated values didn't intersect. This issue has been fixed.
#43288
When some resources submitted their timesheets, the triggered email based on Timesheet Summary’ Status was not sent. This issue has been fixed.
Field Edits (Field Types)
#43615
Using the FieldAccessor.setValue(String name, Object value) method to set rich text into a rich text field did not work and resulted in the data not being properly interpreted as HTML (and also deactivated the rich text editor for that field). This issue has been fixed.
#43525
There was a problem when pasting number values from Excel when the number values were 1000 or more and the grouping separator character in Excel is set to a space (e.g. '1000' is displayed as '1 000') and have a decimal separator present (e.g. '1000.00' or '1 000.00' when displayed in French). Numbers were not getting parsed correctly when this was the case. This issue has been fixed.
Object Edits (Data Categories)
#43642
When "Actual Effort" on a Timesheet was edited, it was possible to encounter a "Work Package internal ID mismatch during TimesheetAssignment.mergeContentsFrom()" error message. This was caused by a task that changed Work Package (WP) membership at some point. Changing WP membership is completely normal and this error message should have never been displayed and this has now been fixed. Additionally, this same customer was encountering an "Exception occurred in PersistentObject.processColumn() on table Timesheet, column DatedNotes" error. This was due to corrupt data in the Dated Notes column. The source of the corruption has been fixed.
#43577
If users attempted to create a new Portfolio Folder (where the Create command set some initial values) when they didn't have "write" permissions (as defined by the default permissions for Portfolio Folders), they would encounter an error, and the Portfolio Folder tree structure was left in a corrupt state which would cause additional errors when editing data. This issue has been fixed.
#43570
When users attempted to create a new Transaction they encountered a “The FieldDataProvider was not created. The create operation will not take place.” error. This was a somewhat rare situation and was due to an internal problem when processing the "Type" (as in the "Types" view in the Designer) associated with the Transaction. This issue has been fixed.
Performance
#43539
Depending on the reports being generated, the server log could have thousands of "Unable to find task by name, not supported" errors when, in fact, there really was no error. That message was erroneously output to the server log when the underlying data was blank. Blank data in this case simply meant that the Task reference field did not yet point to a Task, so no attempt should have been made to "find" a task. The issue has been fixed.
Printing
#43587
Under many circumstances the Exporting to Excel failed with an error message: "Could not load the form containing the printable item". This issue has been fixed.
#43340
Downloading some Excel files worked the first time, but failed with no data on the next attempts. This issue has now been fixed.
Security
#43233
RPC (Remote procedure call) calls could be used to access workspaces that were not authorized for a given User Role. This issue has been fixed. User Role workspace access is now enforced.
UI Blocks
#43608
When the "My Projects" filter was used in a Selector, the wrong projects were showing up. In addition, the wrong picture was being attached to the filter bubble. These problems have been fixed.
#43578
Opening a popover from within a popover was causing an error. This issue has been fixed.
#43489
When entering time off in the Calendar, the times in the Edit Calendar dialog were always shown with the American English time format with leading zeros (e.g. 08:00 am), regardless of the logged in language. This has been changed. The time display will now be formatted according to the locale for the logged in language.
Specifically, the European languages (Spanish, French, German, Portuguese, and Polish) as well as Hebrew and Japanese now all display times according to a 24 hour format. English and Arabic will still format times according to a 12 hour format with an AM and PM indicator.
Times will also no longer show a leading zero for hours before 10 in English, Spanish, Japanese, and Arabic (i.e. "08:00 am" will now be displayed as "8:00am" in English and as "8:00" in Spanish).