For the default start date the horizon_start parameter is taken into account along with the timeslice one. For instance if their respective values is -10 and month, the default start date will be Current Date – 10 Months
Horizon_start=-10
Horizon finish parameter
Ability to configure horizon finish
For the default end date the horizon_finish parameter is taken into account along with the timeslice one. For instance if their respective values is -1 and month, the default end date will be Current Date – 1 Month
Horizon_finish=0
Report Title
Configurable report title that appears at the top of the report.
If a longer report title is required, then create additional report_title=xxx entries and these will be concatenated together based on the order in which they are listed in the configuration structure.
report_title=Resource Time Analysis
Detail Table Layout
Allows user to control the layout of the detail table
Grouped/Pivot - shows the data grouped and formatted with time period columns
Plain/Excel - flat table optimized for analysis in an Excel export
table_layout=grouped|plain
table_layout=grouped
Additional Information
Only progressed timesheets are taken into account.
This report uses the transactional database and uses the daily tables. Therefore data currency will be dependent, for some assignment types, on a refresh of the daily tables.